Project 11431 aircraft carrier

Revision as of 22:16, 12 May 2023 by Oriflamme (talk | contribs) (Page structure to fill up)
Jump to navigation Jump to search
Class overview
Operators:  Itayana
Built: 1984-2013
In commission: 2015-present
Completed: 1
Active: 1
General characteristics
Type: Aircraft carrier
Length: 284 metres (932 ft) (overall)
Beam: 61 metres (200 ft)
Draught: 10.3 metres (34 ft)
Propulsion:
  • 8 gas turbines, generating 240,000 horsepower (178,968 kW)
  • 4 shafts
Speed: +30 knots (56 km/h)
Range: +13,500 nautical miles (25,000 km)
Endurance: 45 days
Complement: 155 officers, 1150 sailors
Sensors and
processing systems:
  • Long-range VHF radar
  • 2 S band AESA search radars
  • X band AESA multipurpose radar (4 arrays)
  • 2 navigation radars
  • Optronic search and scan suite
  • Electronic warfare suite
  • Ploynomi Sonar suite
  • Combat integration suite
  • Airgroup control suite
Armament: 6 6*30mm HO-630A CIWS
Aircraft carried: 12-24 aircraft (estimate):
Aviation facilities:
  • 14-degree ski-jump
  • Three 30-ton arrestor wires
  • One 30-ton deck elevator

Project 11431 is the official designation of a redesign of Elatian XXX-class aircraft carriers by the Itayana Navy. The original design was conceived as a as a hybrid aircraft-carrying guided missile cruiser capable of a hybrid aircraft-guided missile first-strike from direct following as well as being a versatile flagship for the task forces of Elatian Navy. Two ships were laid down, but the Elatian Great Famine of 1984-1987 prevented them from being completed.

The second ship in the class was put on hold at 35% completion before being purchased in 1996 by the Temple of Yanbango to serve as the future flagship and as an experimental aircraft carrier for the nascent Itayana Navy, as well as a symbol of Itayana national recovery. Extensive remodeling and reconstruction efforts couldn't begin until 2003 due to the lack of funding, and continued for over a decade. As such, the design incorporated many changes from experience and expertise accumulated by technical missions of the Temple in Sante Reze and Zacapican and is considered a separate project. The vessel entered service in 2015.

Development

Design

Armament

Electornics

Propulsion

Air group

Ships in class

Navy Name Translation Laid down Launched Commissioned Status
Itayana Itayana Navy TBD TBD 1984 2009 2015 Active