Library:Royal Gristo-Serkonan Navy Ship Statblocks
This article is incomplete because it is pending further input from participants, or it is a work-in-progress by one author. Please comment on this article's talk page to share your input, comments and questions. Note: To contribute to this article, you may need to seek help from the author(s) of this page. |
OOC Note: Because I am too lazy with writing individual pages for each ship-classes, I instead decided to place them here. It will be broken down to numerous sub-library pages eventually.
Battleships
Tordenskjold-class | Colossus-class | Conqueror-class | |
---|---|---|---|
In Service | 1921-1955 | 1927-1966 | 1939-1998 |
Image | |||
Builder | Wilkinson-Taggart Shipyards, Belfras | Chantier Vouzon, Valois, Gristol-Serkonos | Cavignac Shipyards, Valois, Gristol-Serkonos |
Operator(s) | Royal Gristo-Serkonan Navy | Royal Gristo-Serkonan Navy | Royal Gristo-Serkonan Navy |
Role | Dreadnought-type Battleship | Dreadnought-type Battleship | Fast Battleship |
Length | x metres | x metres | 263 metres |
Beam | x metres | x metres | 38.9 metres |
Draft | x metres | x metres | 10.4 etres |
Displacement | x tonnes | x tonnes | 71,659 tonnes |
Installed Power | 12 water-tube boilers | ||
Propulsion | 4 shafts 4 steam turbines | ||
Speed (cruising) | x knots | x knots | 20 knots |
Speed (maximum) | x knots | x knots | 35 knots |
Range | x nmi | x nmi | 13,300 km |
Primary sensors | 1939-1945
1945-1970
1970-1998 | ||
Electronic Warfare and Decoys | 1939-1945
1945-1970
1970-1998 Electronic Warfare Suite
Torpedo Countermeasures
Decoy Launching Systems
| ||
Complement | x Officers x Enlisted |
x Officers x Enlisted |
120 officers 1800 crew |
Weapons |
|
|
1939-1945
1945-1998
|
Armour |
| ||
Aircraft Carried |
1939-1945
1945-1970
1970-1998
|
Aircraft Carriers and Amphibious Warfare Ships
Colossus-class aircraft carrier | Kanesatake-class | Oniare-class | Valiant-class | |
---|---|---|---|---|
In Service | 2023-present | 2015–present | 2007-present | 2008-present |
Image | ||||
Role | Fleet Carrier | Light Carrier | Amphibious Assault Ship (Landing Helicopter Dock) | Amphibious Landing Dock (Landing Platform Dock) |
Builder | Laval Shipbuilding-Cavignac Shipyards, Gristol-Serkonos | Laval Shipbuilding-Cavignac Shipyards, Gristol-Serkonos | Laval Shipbuilding-Cavignac Shipyards, Gristol-Serkonos | Laval Shipbuilding-Cavignac Shipyards, Gristol-Serkonos |
Operator(s) | Royal Gristo-Serkonan Navy
|
Royal Gristo-Serkonan Navy
|
Royal Gristo-Serkonan Navy
|
Royal Gristo-Serkonan Navy
|
Length | 284 metres | 248 metres | 215 metres | 208 metres |
Beam | 62 metres | 38 metres | 31 metres | 32 metres |
Draft | 8.4 metres | 7.5 metres | 7 metres | 7 metres |
Displacement | 65,000 tonnes | 27,000 tonnes | 18,860 tonnes | 25,300 tonnes |
Installed Power | x2 MAME MGT-1105 gas turbine engines x2 MAME MVE-6687 diesel engines |
x2 MAME MGT-1105 gas turbine engines | x4 MAME MVE-6687 diesel engines | x4 MAME MVE-6687 diesel engines x1 MAME diesel generators |
Propulsion | Full electric propulsion
|
Combined gas turbine and gas turbine (COGAG)
|
Combined diesel and diesel (CODAD)
|
Combined diesel and diesel (CODAD)
|
Speed (cruising) | 25 knots | 25 knots | 18 knots | 16 knots |
Speed (maximum) | 32 knots | 30 knots | 23 knots | 22 knots |
Endurance | 19,000 km | 11,112 km | 18,520 km | 17,334 km |
Primary sensors | Combat Management System
Radar Systems
Fire Control System
IFF System
Electro-Optical/Infrared Sensors
Tactical Data Links Sonar Suite IPMS
|
Combat Management System
Radar Systems
Fire Control System
IFF System
Electro-Optical/Infrared Sensors
Tactical Data Links Sonar Suite IPMS
|
Combat Management System
Radar Systems
Fire Control System
IFF System
Electro-Optical/Infrared Sensors
Tactical Data Links Sonar Suite IPMS
|
Combat Management System
Radar Systems
Fire Control System
IFF System
Electro-Optical/Infrared Sensors
Tactical Data Links Sonar Suite IPMS
|
Electronic Warfare and Decoys | Electronic Warfare Suite
|
Electronic Warfare Suite
|
Electronic Warfare Suite
|
Electronic Warfare Suite
|
Complement | 110 Officers 569 Crew |
90 Officers 430 Crew |
30 Officers 300 Crew 720 Marines |
28 Officers 333 Crew 890 Marines |
Vehicles Carried | x2 shipboard tow tractor | x1 shipboard tow tractor | Capable of carrying:
|
Capable of carrying:
|
Weapons | Guns
Missiles & Rockets |
Guns
Missiles & Rockets
|
Guns
Missiles & Rockets
|
Guns
Missiles & Rockets
|
Boats & landing craft carried | x2 RHIBs x3 work boats |
x RHIB | x2 LCUs | |
Aircraft Carried | x1 Carrier Air Wing of 40 aircraft with a surge capacity of 65
|
x1 Carrier Air Wing of 21 aircraft with a surge capacity of 28
|
Flight deck with 5 landing spots Below deck hangar capable of carrying 15 helicopters
Alternate air wing consists of:
|
Hangar for x1 medium helicopter Flight deck for two medium helicopters
|
Cruisers and Destroyers
Hiawatha-class | Hunter-class | Héno-class | Artemis-class | Fortropp-class | |
---|---|---|---|---|---|
In Service | 1994-present | 2022-present | 1999-present | 2018-present | 2023-present |
Image | |||||
Role | Guided Missile Destroyer | Guided Missile Destroyer | Multipurpose Frigate | Guided Missile Frigate | Multipurpose Frigate |
Builder | Laval Shipbuilding-Harns Shipyards, Gristol-Serkonos | Laval Shipbuilding-Harns Shipyards, Gristol-Serkonos | Laval Shipbuilding-Harns Shipyards, Gristol-Serkonos | Venator Defence, Belfras | Laval Shipbuilding-Harns Shipyards, Gristol-Serkonos |
Operator(s) | Royal Gristo-Serkonan Navy
|
Royal Gristo-Serkonan Navy
|
Royal Gristo-Serkonan Navy
|
Belfrasian Navy
|
Royal Gristo-Serkonan Navy
|
Length | 165.0 metres | 169.9 metres | 135.5 metres | x metres | x metres |
Beam | 21.0 metres | 22.2 metres | 16.40 metres | x metres | x metres |
Draft | 6.1 metres | 6.4 metres | 6.15 metres | x metres | x metres |
Displacement | 10,000 tonnes | 10,500 tonnes | 5,235 tonnes | 3,350 tonnes | 5,700 tonnes |
Installed Power | x2 MAME Diesel generators | x2 MAME Diesel generators | x2 MAME Diesel generators | x2 REST Diesel generators | x2 MAME Diesel generators |
Propulsion | Combined Diesel and Gas (CODAG) | Combined gas turbine-electric and gas turbine (COGLAG) | Combined Diesel and Gas (CODAG) | Combined Diesel and Gas (CODAG)
|
Combined Diesel and Diesel (CODAD)
|
Speed (cruising) | 25 knots | 25 knots | 20 knots | 25 knots | x knots |
Speed (maximum) | 33 knots | 35 knots | 32 knots | 30+ knots | x knots |
Endurance | 8,330 km | 8,300 km | 8,300 km | 7,800 km | 17,000 km |
Primary sensors | Combat Management System
Radar Systems
Fire Control System
IFF System
Electro-Optical/Infrared Sensors
Tactical Data Links Sonar Suite IPMS
|
Combat Management System
Radar Systems
Fire Control System
IFF System
Electro-Optical/Infrared Sensors
Tactical Data Links Sonar Suite IPMS
|
Combat Management System
Radar Systems
Fire Control System
IFF System
Electro-Optical/Infrared Sensors
Tactical Data Links Sonar Suite IPMS
|
|
Combat Management System
Radar Systems
Fire Control System
IFF System
Electro-Optical/Infrared Sensors
Tactical Data Links Sonar Suite IPMS
|
Electronic Warfare and Decoys | Electronic Warfare Suite
|
Electronic Warfare Suite
|
Electronic Warfare Suite
|
Electronic Warfare Suite
Torpedo Countermeasures Decoy Launching Systems |
Electronic Warfare Suite
|
Complement | 23 officers 300 crew |
23 officers 270 crew |
25 officers 155 crew |
10 officers 70 crew |
x officers x crew |
Weapons | Guns
Missiles & Rockets
Torpedoes
|
Guns
Missiles & Rockets
Torpedoes
|
Guns
Missiles & Rockets
Torpedoes
|
Guns
Missiles & Rockets
Torpedoes
|
Guns
Missiles & Rockets
Torpedoes
|
Boats & landing craft carried | x2 RHIBs | x1 RHIBs x2 working boats |
x2 RHIBs | x2 RHIBs | x2 RHIBs |
Aircraft Carried |
|
|
|
|
|
Aviation Facilities | Aft flight deck with beartrap and two hangars | Aft flight deck with beartrap and hangar for one helicopter | Aft flight deck with beartrap and hangar for one helicopter | Aft flight deck with beartrap and hangar for one helicopter | Aft flight deck with beartrap and hangar for one helicopter |
Frigates
Héno-class | Artemis-class | Fortropp-class | |
---|---|---|---|
In Service | 1999-present | 2018-present | 2023-present |
Image | |||
Role | Multipurpose Frigate | Guided Missile Frigate | Multipurpose Frigate |
Builder | Laval Shipbuilding-Harns Shipyards, Gristol-Serkonos | Venator Defence, Belfras | Laval Shipbuilding-Harns Shipyards, Gristol-Serkonos |
Operator(s) | Royal Gristo-Serkonan Navy
|
Belfrasian Navy
|
Royal Gristo-Serkonan Navy
|
Length | 135.5 metres | x metres | x metres |
Beam | 16.40 metres | x metres | x metres |
Draft | 6.15 metres | x metres | x metres |
Displacement | 5,235 tonnes | 3,350 tonnes | 5,700 tonnes |
Installed Power | x2 MAME Diesel generators | x2 REST Diesel generators | x2 MAME Diesel generators |
Propulsion | Combined Diesel and Gas (CODAG) | Combined Diesel and Gas (CODAG)
|
Combined Diesel and Diesel (CODAD)
|
Speed (cruising) | 20 knots | 25 knots | x knots |
Speed (maximum) | 32 knots | 30+ knots | x knots |
Endurance | 8,300 km | 7,800 km | 17,000 km |
Primary sensors | Combat Management System
Radar Systems
Fire Control System
IFF System
Electro-Optical/Infrared Sensors
Tactical Data Links Sonar Suite IPMS
|
|
Combat Management System
Radar Systems
Fire Control System
IFF System
Electro-Optical/Infrared Sensors
Tactical Data Links Sonar Suite IPMS
|
Electronic Warfare and Decoys | Electronic Warfare Suite
|
Electronic Warfare Suite
Torpedo Countermeasures Decoy Launching Systems |
Electronic Warfare Suite
|
Complement | 25 officers 155 crew |
10 officers 70 crew |
x officers x crew |
Weapons | Guns
Missiles & Rockets
Torpedoes
|
Guns
Missiles & Rockets
Torpedoes
|
Guns
Missiles & Rockets
Torpedoes
|
Boats & landing craft carried | x2 RHIBs | x2 RHIBs | x2 RHIBs |
Aircraft Carried |
|
|
|
Aviation Facilities | Aft flight deck with beartrap and hangar for one helicopter | Aft flight deck with beartrap and hangar for one helicopter | Aft flight deck with beartrap and hangar for one helicopter |
Corvettes and Offshore Patrol Vessels
Protector-class | Vigilant-class | Knight-class | |
---|---|---|---|
In Service | 2006-present | 2005-present | 2019-present |
Image | |||
Role | Corvette | Patrol Boat | Offshore Patrol Vessel |
Builder | Laval Shipbuilding-Harns Shipyards, Gristol-Serkonos | Laval Shipbuilding-Harns Shipyards, Gristol-Serkonos | Wilkinson-Taggart Shipyards, Belfras |
Operator(s) | Royal Gristo-Serkonan Navy
|
Royal Gristo-Serkonan Navy
|
Belfrasian Navy
|
Length | 90.1 metres | 56.8 metres | x metres |
Beam | 42 metres | 9.7 metres | x metres |
Draft | 11.8 metres | 2.7 metres | x metres |
Displacement | 2,050 tonnes | 300 tonnes | 2,900 tons |
Installed Power | x2 MAME MVE-5490 diesel engines x1 MAME MGT-0998 gas turbines |
x2 MAME MVE-5490 diesel engines | |
Propulsion | Combined Diesel and Gas (CODAG)
|
Combined diesel and diesel (CODAD)
|
Combined diesel-electric and diesel (CODOE)
|
Speed (cruising) | 20 knots | 15 knots | 20 knots |
Speed (maximum) | 30 knots | 25 knots | 30+ knots |
Range | 8,334 km | 5,600 km | x nmi |
Endurance | 42 days | 42 days | x |
Primary sensors | Combat Management System
Radar Systems
Fire Control System
IFF System
Electro-Optical/Infrared Sensors
Tactical Data Links Sonar Suite IPMS
|
Combat Management System
Radar Systems
Fire Control System
IFF System
Electro-Optical/Infrared Sensors
Tactical Data Links Sonar Suite
IPMS
|
Combat Management System |
Electronic Warfare and Decoys | Electronic Warfare Suite
|
Electronic Warfare Suite
|
Electronic Warfare Suite |
Complement | 15 officers 55 crew |
4 officers 20 crew |
x officers x crew |
Weapons | Guns
Missiles & Rockets
Torpedoes
|
Guns | Guns
Missiles & Rockets Torpedoes |
Boats & landing craft carried | x2 RHIBs | x2 RHIBs | x RHIB |
Aircraft Carried | AW109 Power maritime light helicopter | N/A | |
Aviation Facilities | Flight deck and hangar for 1 light helicopter. | N/A |
Submarines
Leviathan-class | Gaasyendietha-class | Sosondowah-class | Fossegrim-class | |
---|---|---|---|---|
In Service | 2024-present | 2010-present | 2000-present | 2017-present |
Image | ||||
Role | Nuclear-Powered Attack Submarine | Hunter-Killer Submarine | Hunter-Killer Submarine | Attack Submarine |
Builder | Laval Shipbuilding-Hitra Shipyards, Gristol-Serkonos | Laval Shipbuilding-Hitra Shipyards, Gristol-Serkonos | Laval Shipbuilding-Hitra Shipyards, Gristol-Serkonos | TBD |
Operator(s) | Royal Gristo-Serkonan Navy
|
Royal Gristo-Serkonan Navy
|
Royal Gristo-Serkonan Navy
|
Royal Gristo-Serkonan Navy
|
Length | 138 metres | 97 metres | 96.9 metres | x metres |
Beam | 12.1 metres | 11.3 metres | 11.3 metres | x metres |
Draft | 10.9 metres | 10 metres | 10 metres | x metres |
Displacement (Surfaced) |
8,600 tonnes | 3,407 tonnes | 2,455 tonnes | 3,750 tonnes |
Installed Power | x1 MAE NVNR-Type 1 PWR | x2 MAME NVT-400 marine diesel engines x1 MAME EM-564 electric motor |
x2 MAME NVT-300 marine diesel engines x1 MAME EM-564 electric motor |
x3 MAME NVT-500 marine diesel engines x4 MAE FC-21 Proton-exchange membrane fuel cells |
Propulsion | Nuclear propulsion
|
Diesel–electric powertrain
|
Diesel–electric powertrain
|
Diesel–electric powertrain with Air-independent propulsion
|
Speed (silent) | 20 knots | 12 knots | 12 knots | 12 knots |
Speed (maximum) | 35 knots | 25 knots | 20 knots | 25 knots |
Range | Unlimited | 15,000 km | 11,300 km | 19,000 km |
Endurance | Limited by food supplies | 30 days | 30 days | 50 days |
Sensors and Processing Systems |
Sonar Suite
Electro-Optical/Infrared Sensors
IFF System
Tactical Data Links |
Sonar Suite
Electro-Optical/Infrared Sensors
IFF System
Tactical Data Links |
Sonar Suite Electro-Optical/Infrared Sensors
IFF System
Tactical Data Links |
Sonar Suite Electro-Optical/Infrared Sensors
IFF System
Tactical Data Links |
Complement | 15 officers 126 crew |
10 0fficers 60 crew |
10 officers 43 crew |
10 officers 40 crew |
Weapons |
|
|
|
|
Auxiliary Ships
Provider-class | Ëjö:tga’-class | Anvil-class | Frontier-class | |
---|---|---|---|---|
In Service | 2015-present | 2008-present | 2019-present | 2017-present |
Image | ||||
Role | Joint support ship | Replenishment vessel | Roll-on/Roll-off ship | Fast fleet tanker |
Builder | Laval Shipbuilding-Hitra Shipyards, Gristol-Serkonos | Laval Shipbuilding-Hitra Shipyards, Gristol-Serkonos | Chantier Vouzon, Gristol-Serkonos | Chantier Vouzon, Gristol-Serkonos |
Operator(s) | Royal Gristo-Serkonan Navy
|
Royal Gristo-Serkonan Navy
|
Royal Gristo-Serkonan Navy
|
Royal Gristo-Serkonan Navy
|
Length | 231 metres | x metres | x metres | |
Beam | 30.4 metres | x metres | x metres | x metres |
Draft | 7.8 metres | x metres | x metres | x metres |
Displacement | 27,800 tonnes | |||
Installed Power | ||||
Propulsion | Diesel–electric powertrain
|
|||
Speed (cruising) | 18 knots | |||
Speed (maximum) | 25 knots | |||
Endurance | 11,000 km | x nmi | ||
Primary sensors | Combat Management System |
Combat Management System |
Combat Management System |
|
Complement | 30 officers 120 crew |
x officers x crew |
x officers x crew |
x officers x crew |
Weapons | Guns
Missiles & Rockets Torpedoes |
Guns
Missiles & Rockets Torpedoes |
Guns
Missiles & Rockets Torpedoes |
Guns
Missiles & Rockets Torpedoes |
Boats & landing craft carried |
|
|
||
Aircraft Carried |
|
|||
Aviation Facilities |