Cedar-class corvette: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 14: | Line 14: | ||
|Subclasses= | |Subclasses= | ||
|Cost= | |Cost= | ||
|Built range= 2012- | |Built range= 2012-2020 | ||
|In commission range= 2013–present | |In commission range= 2013–present | ||
|Total ships planned= 15 | |Total ships planned= 15 | ||
|Total ships building= | |Total ships building= | ||
|Total ships completed= | |Total ships completed= 15 | ||
|Total ships cancelled= | |Total ships cancelled= | ||
|Total ships active= | |Total ships active= 15 | ||
|Total ships laid up= | |Total ships laid up= | ||
|Total ships lost= | |Total ships lost= | ||
Line 29: | Line 29: | ||
|Header caption= | |Header caption= | ||
|Ship type={{wpl|Corvette}} | |Ship type={{wpl|Corvette}} | ||
|Ship displacement= | |Ship displacement= 1,800 tons | ||
|Ship length= 95 m | |Ship length= 95 m | ||
|Ship beam= 11 m | |Ship beam= 11 m | ||
|Ship draft= 4 m | |Ship draft= 4 m | ||
|Ship propulsion= 2 × Toyoda TCD-52 multi-fuel diesel engines, 5,200 kW each | |Ship propulsion= 2 × Toyoda TCD-52 multi-fuel diesel engines, 5,200 kW each | ||
|Ship speed= | |Ship speed= 25 kn (111 km/h; 69 mph) | ||
|Ship range= 6,500 km (3,500 nmi) at 16 knots | |Ship range= 6,500 km (3,500 nmi) at 16 knots | ||
|Ship endurance= | |Ship endurance= | ||
Line 52: | Line 52: | ||
** 2 x triple 324 mm {{wpl|torpedo tubes}} | ** 2 x triple 324 mm {{wpl|torpedo tubes}} | ||
|Ship armour= | |Ship armour= | ||
|Ship aircraft= 1 x [[CSH-11 Sea | |Ship aircraft= 1 x [[TrHsB-350 Krähe|CSH-11 Sea Rattlesnake]] ASW helicopter | ||
|Ship aircraft facilities= | |Ship aircraft facilities= | ||
* Helipad | * Helipad |
Latest revision as of 07:31, 2 May 2021
This article is incomplete because it is pending further input from participants, or it is a work-in-progress by one author. Please comment on this article's talk page to share your input, comments and questions. Note: To contribute to this article, you may need to seek help from the author(s) of this page. |
GCNS Cedar on patrol off the disputed Taipeng Islands.
| |
Class overview | |
---|---|
Name: | Cedar-class corvette |
Builders: | Dalian Shipbuilding & Marine Engineering |
Operators: | Grand Chilokveri Navy |
Built: | 2012-2020 |
In commission: | 2013–present |
Planned: | 15 |
Completed: | 15 |
Active: | 15 |
General characteristics | |
Type: | Corvette |
Displacement: | 1,800 tons |
Length: | 95 m |
Beam: | 11 m |
Draft: | 4 m |
Propulsion: | 2 × Toyoda TCD-52 multi-fuel diesel engines, 5,200 kW each |
Speed: | 25 kn (111 km/h; 69 mph) |
Range: | 6,500 km (3,500 nmi) at 16 knots |
Complement: | 78 |
Armament: |
|
Aircraft carried: | 1 x CSH-11 Sea Rattlesnake ASW helicopter |
Aviation facilities: |
|