Cedar-class corvette: Difference between revisions

Jump to navigation Jump to search
No edit summary
 
No edit summary
 
(6 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{wip}}
{{wip}}
{{DISPLAYTITLE:''Fale''-class corvette}}
{{DISPLAYTITLE:''Cedar''-class corvette}}
{|{{Infobox ship begin|infobox caption=''Fale''-class corvette}}
{|{{Infobox ship begin|infobox caption=''Cedar''-class corvette}}
{{Infobox ship image
{{Infobox ship image
|Ship image= [[File:Taipeng islands.jpg|300px]]
|Ship image= [[File:Taipeng islands.jpg|300px]]
|Ship caption= GCNS ''Fale'' on patrol off the disputed Taipeng Islands.
|Ship caption= GCNS ''Cedar'' on patrol off the disputed Taipeng Islands.
}}
}}
{{Infobox ship class overview
{{Infobox ship class overview
|Name=''Fale''-class corvette
|Name=''Cedar''-class corvette
|Builders= [[Dalian Shipbuilding & Marine Engineering]]
|Builders= [[Dalian Shipbuilding & Marine Engineering]]
|Operators= {{flagicon|Chilokver}} [[Grand Chilokveri Navy]]
|Operators= {{flagicon|Chilokver}} [[Grand Chilokveri Navy]]
|Class before=  
|Class before=  
|Class after=
|Class after=
|Subclasses= [[Edelweiss-class]]
|Subclasses=
|Cost=  
|Cost=  
|Built range= 2012-present
|Built range= 2012-2020
|In commission range= 2013–present
|In commission range= 2013–present
|Total ships planned= 15
|Total ships planned= 15
|Total ships building= 2
|Total ships building=  
|Total ships completed= 10
|Total ships completed= 15
|Total ships cancelled=
|Total ships cancelled=
|Total ships active= 10
|Total ships active= 15
|Total ships laid up=
|Total ships laid up=
|Total ships lost=
|Total ships lost=
Line 29: Line 29:
|Header caption=
|Header caption=
|Ship type={{wpl|Corvette}}
|Ship type={{wpl|Corvette}}
|Ship displacement= 1800 tons
|Ship displacement= 1,800 tons
|Ship length= 95 m
|Ship length= 95 m
|Ship beam=  11 m  
|Ship beam=  11 m  
|Ship draft= 4 m
|Ship draft= 4 m
|Ship propulsion= 2 × Toyoda TCD-52 multi-fuel diesel engines, 5,200 kW each
|Ship propulsion= 2 × Toyoda TCD-52 multi-fuel diesel engines, 5,200 kW each
|Ship speed= 30 kn (111 km/h; 69 mph)
|Ship speed= 25 kn (111 km/h; 69 mph)
|Ship range= 6,500 km (3,500 nmi) at 16 knots
|Ship range= 6,500 km (3,500 nmi) at 16 knots
|Ship endurance=  
|Ship endurance=  
Line 52: Line 52:
** 2 x triple 324 mm {{wpl|torpedo tubes}}
** 2 x triple 324 mm {{wpl|torpedo tubes}}
|Ship armour=  
|Ship armour=  
|Ship aircraft= 1 x [[CH-01 Sea Taipan]] SAR helicopter
|Ship aircraft= 1 x [[TrHsB-350 Krähe|CSH-11 Sea Rattlesnake]] ASW helicopter
|Ship aircraft facilities=  
|Ship aircraft facilities=  
* Helipad
* Helipad

Latest revision as of 07:31, 2 May 2021

Cedar-class corvette
Taipeng islands.jpg
GCNS Cedar on patrol off the disputed Taipeng Islands.
Class overview
Name: Cedar-class corvette
Builders: Dalian Shipbuilding & Marine Engineering
Operators: Chilokver Grand Chilokveri Navy
Built: 2012-2020
In commission: 2013–present
Planned: 15
Completed: 15
Active: 15
General characteristics
Type: Corvette
Displacement: 1,800 tons
Length: 95 m
Beam: 11 m
Draft: 4 m
Propulsion: 2 × Toyoda TCD-52 multi-fuel diesel engines, 5,200 kW each
Speed: 25 kn (111 km/h; 69 mph)
Range: 6,500 km (3,500 nmi) at 16 knots
Complement: 78
Armament:
Aircraft carried: 1 x CSH-11 Sea Rattlesnake ASW helicopter
Aviation facilities:
  • Helipad
  • Enclosed hangar