H'sarin: Difference between revisions
(Created page with "The '''Dartha Metropolitan Railway''' ''(Rihanh: H'sarin)'' is the Republic's first and only rapid transit system, built to serve the Greater Dartha Metropolitan area. It...") |
No edit summary |
||
Line 11: | Line 11: | ||
|- | |- | ||
|align="center" style="color: white; background-color: #7851a9" |'''Purple Line''' </center> | |align="center" style="color: white; background-color: #7851a9" |'''Purple Line''' </center> | ||
|Krenok ↔ Elheu ↔ Cailax ↔ | |Krenok ↔ Elheu ↔ Cailax ↔ Nur'shet ↔ Salkora | ||
|2021 (in construction) | |2021 (in construction) | ||
|31.4 mi | |31.4 mi | ||
Line 29: | Line 29: | ||
|- | |- | ||
|align="center" style="color: white; background-color: #4169e1" |'''Blue Line''' </center> | |align="center" style="color: white; background-color: #4169e1" |'''Blue Line''' </center> | ||
| | |Brentoc ↔ Elheu ↔ Garsheb ↔ Pen'elth | ||
|2026 (planning) | |2026 (planning) | ||
|20.1 mi | |20.1 mi |
Revision as of 23:11, 17 March 2019
The Dartha Metropolitan Railway (Rihanh: H'sarin) is the Republic's first and only rapid transit system, built to serve the Greater Dartha Metropolitan area. It is currently under construction with the first line to open in March 2021. Keeping in line with the grandeur of Rihannsu architecture and art, the various stations across the system will be decorated exquisitely with nationalistic motifs and Kedossian marble. At the completion of the system's four lines, the total trackage of the network will be 93.2 miles with 52 stations. It is estimated to have a daily ridership of over 1.1 million. Like the Talasagam, the metro is being built to the Republican Standard gauge of 7 feet. Amosarr is manufacturing all of the rolling stock to be used on the network.
Lines
Line | Route | Date opened | Length | Stations |
---|---|---|---|---|
Purple Line | Krenok ↔ Elheu ↔ Cailax ↔ Nur'shet ↔ Salkora | 2021 (in construction) | 31.4 mi | Y |
Green Line | Sethen ↔ Cailax ↔ Trex'ar ↔ Pel'shar | 2022 (planning) | 23.1 mi | Y |
Gold Line | N'emoth ↔ Cailax ↔ Kobe't ↔ Lotura | 2024 (planning) | 18.6 mi | Y |
Blue Line | Brentoc ↔ Elheu ↔ Garsheb ↔ Pen'elth | 2026 (planning) | 20.1 mi | Y |