H'sarin: Difference between revisions

Jump to navigation Jump to search
No edit summary
No edit summary
Line 24: Line 24:
| end                        =
| end                        =
| stations                    = 52
| stations                    = 52
| daily_ridership            = 1.1 million
| daily_ridership            = 1.68 million
| annual_ridership            = 401,500,000
| annual_ridership            = 584,000,000
| chief_executive            = <!-- or | key_people = -->
| chief_executive            = <!-- or | key_people = -->
| headquarters                = Elheu
| headquarters                = Elheu

Revision as of 21:21, 30 March 2019

Dartha Metro
Overview
OwnerDartha City Council
Area servedGreater Dartha and Deridex Province
LocaleDartha
Transit typeMetro
Number of lines4
Number of stations52
Daily ridership1.68 million
Annual ridership584,000,000
HeadquartersElheu
Operation
Operation will start2021
Operator(s)Yhfillain
Number of vehicles270
Train length8
Headway5 minutes (peak)
10 minutes (off-peak)
Technical
System length93.2 miles
Track gauge7 ft. Broad

The Dartha Metropolitan Railway (Rihanh: H'sarin) is the Republic's first and only rapid transit system, built to serve the Greater Dartha Metropolitan area. It is currently under construction with the first line to open in March 2021. Keeping in line with the grandeur of Rihannsu architecture and art, the various stations across the system will be decorated exquisitely with nationalistic motifs and Kedossian marble. At the completion of the system's four lines, the total trackage of the network will be 93.2 miles with 52 stations. It is estimated to have a daily ridership of over 1.1 million. Like the Talasagam, the metro is being built to the Republican Standard gauge of 7 feet. Amosarr is manufacturing all of the rolling stock to be used on the network.

Lines

Line Route Date opened Length Stations
Purple Line Krenok ↔ Elheu ↔ Cailax ↔ Nur'shet ↔ Salkora 2021 (in construction) 31.4 mi Y
Green Line Sethen ↔ Cailax ↔ Trex'ar ↔ Pel'shar 2022 (planning) 23.1 mi Y
Gold Line N'emoth ↔ Cailax ↔ Kobe't ↔ Lotura 2024 (planning) 18.6 mi Y
Blue Line Brentoc ↔ Elheu ↔ Garsheb ↔ Pen'elth 2026 (planning) 20.1 mi Y