User:Montecara/Sandbox/Aurean Tunnels: Difference between revisions

Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
{{Infobox tunnel
{{Infobox tunnel
| name          = Aurean Tunnel
| name          = Aurean Tunnel (rail)
| image        =  
| image        =  
| image_size    =  
| image_size    =  
Line 8: Line 8:
| other_name    =  
| other_name    =  
| line          =  
| line          =  
| location      =  
| location      = {{flag|Montecara}} to {{flag|Paretia}}
| coordinates  = 28°32′4.9″N 6°21′37.6″E
| coordinates  = 28°32′4.9″N 6°21′37.6″E
| os_grid_ref  =  
| os_grid_ref  =  
Line 14: Line 14:
| system        =  
| system        =  
| crosses      = [[Aurean Straits|Western Aurean Strait]]
| crosses      = [[Aurean Straits|Western Aurean Strait]]
| start        =  
| start        = [[Montecara]]
| end          =  
| end          = near [[Mavoa]], [[Luzela]]
| stations      =  
| stations      =  
| startwork    =  
| startwork    =  
Line 31: Line 31:
| linelength    =  
| linelength    =  
| tracklength  =  
| tracklength  =  
| notrack      =  
| notrack      = {{ubl|2 {{wp|Single track (rail)|single track}} tunnels|1 service tunnel}}
| gauge        = {{Track gauge|1500 mm}}
| gauge        = {{Track gauge|1500 mm}}
| el            = 25 {{wp|kV}} / 50 {{wp|Hz}} {{wp|Alternating current|AC}} {{wp|Overhead line|overhead lines}}
| el            = 25 {{wp|kV}} / 50 {{wp|Hz}} {{wp|Alternating current|AC}} {{wp|Overhead line|overhead lines}}
Line 41: Line 41:
| depth_below_water =
| depth_below_water =
| shipping_clearance_above =  
| shipping_clearance_above =  
| grade        =
| map          =
| extra        =
}}
{{Infobox tunnel
| name          = Aurean Tunnel (road)
| image        =
| image_size    =
| alt          =
| caption      =
| official_name =
| other_name    =
| location      =
| coordinates  =
| os_grid_ref  =
| status        =
| route        =
| crosses      =
| start        =
| end          =
| startwork    =
| opened        = <!-- or |opens for future dates -->
| closed        = <!-- or |closes for future dates -->
| rebuilt      =
| reopened      = <!-- or |reopens for future dates -->
| owner        =
| operator      =
| traffic      =
| character    =
| toll          = €30 (passenger cars, eastbound only)
| vpd          =
| engineer      =
| construction  =
| length        = {{convert|6882|m|mi}}
| lanes        = 4 (2 per direction)
| speed        = Variable (max. {{convert|100|km/h|mph}}
| hielevation  =
| lowelevation  =
| height        =
| width        =
| depth_below_water =
| shipping_clearance_above = 
| grade        =  
| grade        =  
| map          =  
| map          =  
| extra        =  
| extra        =  
}}
}}

Revision as of 18:56, 19 March 2023

Aurean Tunnel (rail)
Overview
Location Montecara to  Paretia
Coordinates28°32′4.9″N 6°21′37.6″E
CrossesWestern Aurean Strait
StartMontecara
Endnear Mavoa, Luzela
Operation
OperatorTrenalia
Technical
Length6,882 metres (4.276 mi)
No. of tracks
Track gauge1,500 mm (4 ft 11 116 in)
Electrified25 kV / 50 Hz AC overhead lines
Aurean Tunnel (road)
Operation
Toll€30 (passenger cars, eastbound only)
Technical
Length6,882 metres (4.276 mi)
No. of lanes4 (2 per direction)
Operating speedVariable (max. 100 kilometres per hour (62 mph)