User:Montecara/Sandbox/Aurean Tunnels: Difference between revisions

Jump to navigation Jump to search
No edit summary
No edit summary
Line 76: Line 76:
| length        = {{convert|6882|m|mi}}
| length        = {{convert|6882|m|mi}}
| lanes        = 4 (2 per direction)
| lanes        = 4 (2 per direction)
| speed        = Variable (max. {{convert|100|km/h|mph}}
| speed        = {{convert|80|km/h|mph}}
| hielevation  =  
| hielevation  =  
| lowelevation  =  
| lowelevation  =  

Revision as of 02:50, 20 March 2023

Aurean Tunnel (rail)
Overview
Location Montecara to  Paretia
Coordinates28°32′4.9″N 6°21′37.6″E
CrossesWestern Aurean Strait
StartMontecara
Endnear Mavoa, Luzela
Operation
OperatorTrenalia
Technical
Length6,882 metres (4.276 mi)
No. of tracks
Track gauge1,500 mm (4 ft 11 116 in)
Electrified25 kV / 50 Hz AC overhead lines
Aurean Tunnel (road)
Operation
OperatorInternational Transportation Commission
Toll€30 (passenger cars, both directions)
Technical
Length6,882 metres (4.276 mi)
No. of lanes4 (2 per direction)
Operating speed80 kilometres per hour (50 mph)