User:Montecara/Sandbox/Aurean Tunnels: Difference between revisions

Jump to navigation Jump to search
No edit summary
No edit summary
Line 67: Line 67:
| reopened      = <!-- or |reopens for future dates -->
| reopened      = <!-- or |reopens for future dates -->
| owner        =  
| owner        =  
| operator      = International Transportation Commission
| operator      = Interaurean Commission
| traffic      =  
| traffic      =  
| character    =  
| character    =  

Revision as of 02:54, 20 March 2023

Aurean Tunnel (rail)
Overview
Location Montecara to  Paretia
Coordinates28°32′4.9″N 6°21′37.6″E
CrossesWestern Aurean Strait
StartMontecara
Endnear Mavoa, Luzela
Operation
OperatorTrenalia
Technical
Length6,882 metres (4.276 mi)
No. of tracks
Track gauge1,500 mm (4 ft 11 116 in)
Electrified25 kV / 50 Hz AC overhead lines
Aurean Tunnel (road)
Operation
OperatorInteraurean Commission
Toll€30 (passenger cars, both directions)
Technical
Length6,882 metres (4.276 mi)
No. of lanes4 (2 per direction)
Operating speed80 kilometres per hour (50 mph)