== Electricity ==
{{Infobox electricity sector
| country              = Montecara
| image                =
| coverage              = 100%
| continuity            = 99.99%
| capacity              = 4795 MW
| capacityyear          = 2017
| production            =
| productionyear        =
| fossilshare          = 92.28%
| renewableshare        = 7.72%
| greenhouse            =
| greenhouseyear        =
| use                  = 8,194 kW·h per capita
| useyear              = 2017
| distlosses            =
| distlossesyear        =
| translosses          =
| translossesyear      =
| tdlosses              =
| tdlossesyear          =
| residential          =
| residentialyear      =
| industrial            =
| industrialyear        =
| agriculture          =
| agricultureyear      =
| commercialpublic      =
| commercialpublicyear  =
| commercial            =
| commercialyear        =
| public                =
| publicyear            =
| traction              =
| tractionyear          =
| rural                =
| ruralyear            =
| rtariff              =
| rtariffyear          =
| itariff              =
| itariffyear          =
| ctariff              =
| ctariffyear          =
| investment            =
| investmentyear        =
| selffinance          =
| selffinanceyear      =
| governmentfinance    =
| governmentfinanceyear =
| privatefinance        =
| privatefinanceyear    =
| unbundling            =
| privategen            = 100%
| privatetrans          =
| privatedist          =
| largeusers            = No
| residentialusers      = No
| providers            =
| transmission          = [[Comega]]
| regulation            =
| policy                =
| renewableenergy      =
| environment          =
| law                  =
| renewablelaw          =
| cdm                  =
}}


Montecara consumes about 14.35 billion kW·h of electricity per year.
Montecara is in the process of moving away from fossil fuels and toward sustainable energy but badly lags behind schedule in its goal, set in 2000, to achieve 100% renewable electricity by 2025. Less than ten percent of the electricity generated in Montecara comes from a renewable source, with the remaining more than ninety percent coming from oil and natural gas. There are several obstacles to increased use of renewables: limited land area means that there is little free space to deploy solar panels, the terrain is not generally favorable to onshore wind power, and high land values mean that land-intensive renewable plants are prohibitively expensive to build and maintain.
{{wp|Nuclear power}} is a highly contentious political issue in Montecara. Montecara has been a {{wp|nuclear-free zone}} since 1985 in response to plans by [[Comega]] to build a {{wp|boiling water reactor}}.
Montecara must import all its fossil fuels and is therefore highly dependent on the flow of international shipping to supply its energy needs. Tanker ships arrive several times per week with supplies of oil and liquefied natural gas, and the state estimates that if its sea lanes were disrupted, fuel and power shortages would likely develop within less than 48 hours.
An interconnector cable built into the [[Bridge]] allows electricity to be exported to and imported from [[Mespalia]] as needed. 
=== Power plants ===
{{Template:Comega plants}}
== Regulation ==
The [[Secretary of the Environment, Transport, and Urban Development]] has authority over energy regulation in Montecara
== Transportation ==

Latest revision as of 17:53, 21 March 2024