Constantinoupoli Metro: Difference between revisions
Jump to navigation
Jump to search
(→Lines) |
No edit summary |
||
(6 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
| imagesize = 75px | | imagesize = 75px | ||
| image2 = Con metro.jpg | | image2 = Con metro.jpg | ||
| imagesize2 = | | imagesize2 = | ||
| caption2 = | | caption2 = | ||
| native_name = ''Μετρό Κωνσταντινούπολης'' | | native_name = ''Μετρό Κωνσταντινούπολης'' | ||
Line 63: | Line 63: | ||
|} | |} | ||
===Planned lines=== | |||
{| class="wikitable" style="text-align:center" | |||
|- | |||
! Line | |||
! colspan=2 | Terminals | |||
! Planned opening | |||
! Planned completion | |||
! Length (km)<br /> | |||
! Stations | |||
! Avg. station<br />distance (km) | |||
|- | |||
|width=50px align=center| [[File:Metro_con_logo_line10.svg|15px]] || TBD || TBD || 2024 || 2028 || TBD || TBD || TBD | |||
|- | |||
|align=center| [[File:Metro_con_logo_line11.svg|15px]] || TBD || TBD || 2024 || 2029 || TBD || TBD || TBD | |||
|- | |||
|align=center| [[File:Metro_con_logo_line12.svg|15px]] || TBD || TBD || 2024 || 2032 || TBD || TBD || TBD | |||
|- | |||
|align=center| [[File:Metro_con_logo_line13.svg|15px]] || TBD || TBD || 2025 || 2035 || TBD || TBD || TBD | |||
|- | |||
|align=center| [[File:Metro_con_logo_line14.svg|15px]] || TBD || TBD || 2026 || 2035 || TBD || TBD || TBD | |||
|- | |||
|align=center| [[File:Metro_con_logo_line15.svg|15px]] || TBD || TBD || 2028 || 2038 || TBD || TBD || TBD | |||
|- | |||
|align=center| [[File:Metro_con_logo_line16.svg|15px]] || TBD || TBD || 2030 || 2040 || TBD || TBD || TBD | |||
|- | |||
|} | |||
{{Constantinoupoli}} | |||
{{Constantinoupoli_transport_network}} | {{Constantinoupoli_transport_network}} | ||
{{Romaia Rapid transit}} |
Latest revision as of 09:57, 30 May 2023
This article is incomplete because it is pending further input from participants, or it is a work-in-progress by one author. Please comment on this article's talk page to share your input, comments and questions. Note: To contribute to this article, you may need to seek help from the author(s) of this page. |
Overview | |
---|---|
Native name | Μετρό Κωνσταντινούπολης |
Owner | ASK |
Locale | Constantinoupoli, Apollonia, Romaia |
Transit type | Rapid transit |
Number of lines | 9 (plus 3 under construction) |
Number of stations | 136 |
Daily ridership | 2.35 million (2018 average weekday) |
Annual ridership | 685 million (2018) |
Website | metro.con.ra |
Operation | |
Began operation | 1910 |
Operator(s) | ASK |
Technical | |
System length | 138 km (86 mi) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
Electrification | 750 V DC third rail |
The Constantinoupoli Metro (Μετρό Κωνσταντινούπολης, romanized: Metrò Konstantinùpolis) is a rapid transit system in Constantinoupoli operated by ASK. As of 2023, the system comprises nine lines. It is mostly underground, and is TBD kilometres (TBD mi) long. It has TBD stations, of which TBD have transfers between lines. There are 9 lines (with an additional three under construction), numbered 1 to 9. Lines 8 and Line 9 are automated. Lines are identified on maps by number and colour, with the direction of travel indicated by the terminus.