Black Arrow (hypersonic missile): Difference between revisions
No edit summary |
|||
(9 intermediate revisions by the same user not shown) | |||
Line 10: | Line 10: | ||
|used_by=A&L, Khalistan, Bataviae. | |used_by=A&L, Khalistan, Bataviae. | ||
|manufacturer=Royal Arsenal + Bharat Dynamics. | |manufacturer=Royal Arsenal + Bharat Dynamics. | ||
|unit_cost= | |unit_cost= | ||
|propellant= | |propellant= | ||
|production_date= | |production_date= | ||
Line 33: | Line 33: | ||
}} | }} | ||
The Black Arrow is a hypersonic cruise missile jointly developed by the countries of A&L and Khalistan. The program of Black Arrow started in 1995 by Royal Arsenal; development of the missile continued up until 2008, nearly being cancelled as costs began to spiral out of budget. Bharat Dynamics joined the project in 2009 to help fund the development of Black Arrow, with live firing tests starting in 2012. | The Black Arrow is a hypersonic cruise missile jointly developed by the countries of A&L and Khalistan. The program of Black Arrow started in 1995 by Royal Arsenal; development of the missile continued up until 2008, nearly being cancelled as costs began to spiral out of budget. Bharat Dynamics joined the project in 2009 to help fund the development of Black Arrow, with live firing tests starting in 2012 after the previous prototype missile failed to launch. | ||
The missile has a reported range of up to 1,600 km and has a maximum speed of Mach 9. In 2018, the Black Arrow entered low-rate production and achieved initial operational capability in 2024. | The missile has a reported range of up to 1,600 km and has a maximum speed of Mach 9. In 2018, the Black Arrow entered low-rate production and achieved initial operational capability in 2024. | ||
During the aftermath of the One Month War, the Ministry of Defence of both A&L and Khalistan accelerated procurement of the Black Arrow, and the missile entered widespread service in 2026. | During the aftermath of the One Month War, the Ministry of Defence of both A&L and Khalistan accelerated procurement of the Black Arrow, and the missile entered widespread service in 2026. | ||
==Development and | ==Development and Design== | ||
In late 1995, Defence Evaluation and Research Agency (DERA) began the Hypersonic-Flight-Research-Vehicle (HFRV) program for hypersonic propulsion. The purpose of the program was to investigate and demonstrate the feasibility of the Dual-Mode Ramjet (DMR) to enable sustained high-speed travel in the Mach 5-10 range by offering both efficient supersonic combustion and the ability to handle variable flight speeds. | In late 1995, Defence Evaluation and Research Agency (DERA) in conjunction with Royal Arsenal, began the Hypersonic-Flight-Research-Vehicle (HFRV) program for hypersonic propulsion. The purpose of the program was to investigate and demonstrate the feasibility of the Dual-Mode Ramjet (DMR) to enable sustained high-speed travel in the Mach 5-10 range by offering both efficient supersonic combustion and the ability to handle variable flight speeds. | ||
Since the DMR is an air-breathing system, It uses atmospheric oxygen for combustion, reducing the need to carry oxidizers on board. This improves overall fuel efficiency, range, and payload capacity, making the DMR ideal for long-ranged strikes. | Since the DMR is an air-breathing system, It uses atmospheric oxygen for combustion, reducing the need to carry oxidizers on board. This improves overall fuel efficiency, range, and payload capacity, making the DMR ideal for long-ranged strikes. | ||
Line 46: | Line 46: | ||
The Black Arrow has a slim, streamlined profile with a sleek, cylindrical body. This shape is optimized for high speed travel through the atmosphere with minimal air resistance, maximizing its ability to reach hypersonic speeds. | The Black Arrow has a slim, streamlined profile with a sleek, cylindrical body. This shape is optimized for high speed travel through the atmosphere with minimal air resistance, maximizing its ability to reach hypersonic speeds. | ||
The missile is equipped with small stabilizing fins and adjustable control surfaces. These compact fins contribute to the missile's high maneuverability, allowing it to make agile turns even at high speeds. This capability is essential for evading missile defence systems and interceptors, enabling the Black Arrow to reach well defended targets. | |||
The Black Arrow was developed to be launched from surface warships, submarines and aircraft. The missile has a tri-mode fuse which allows air-burst, point-impact and delay detonation modes. | |||
==Early Flight Testing== | |||
In 2005, a prototype missile was cleared for tests at the Galloway Guided Weapon Range, carried by an RAF Typhoon fighter. The missile failed to launch on three separate tests, and it was found that extensive redesign of the missile was needed. | |||
==Near cancellation and Khalistanian membership== | |||
With the failure of the prototype missile launch, further flight testing was delayed until the faults could be rectified. Costs began to mount, and a project report made by the Ministry of Defense felt that the lack of progress of the Black Arrow program meant it wasn't worth investing in and other equipment projects should take priority. |
Latest revision as of 13:26, 29 October 2024
Black Arrow | |
---|---|
Type | Hypersonic Cruise Missile. |
Place of origin | A&L and Khalistan. |
Service history | |
In service | 2026 |
Used by | A&L, Khalistan, Bataviae. |
Production history | |
Manufacturer | Royal Arsenal + Bharat Dynamics. |
Specifications | |
Weight | 1,800kg |
Length | 5.5m |
Height | 480mm |
Diameter | 625mm |
Warhead | 300kg to 450kg |
Engine | Dual mode ramjet (DMR). |
Operational range | 1,600km |
Flight ceiling | 40km |
Speed | Mach 3 - 9 |
Guidance system | GPS/INS, mmW, I3R. |
Launch platform | Submarines, surface ships, aircraft, land based launchers. |
The Black Arrow is a hypersonic cruise missile jointly developed by the countries of A&L and Khalistan. The program of Black Arrow started in 1995 by Royal Arsenal; development of the missile continued up until 2008, nearly being cancelled as costs began to spiral out of budget. Bharat Dynamics joined the project in 2009 to help fund the development of Black Arrow, with live firing tests starting in 2012 after the previous prototype missile failed to launch.
The missile has a reported range of up to 1,600 km and has a maximum speed of Mach 9. In 2018, the Black Arrow entered low-rate production and achieved initial operational capability in 2024.
During the aftermath of the One Month War, the Ministry of Defence of both A&L and Khalistan accelerated procurement of the Black Arrow, and the missile entered widespread service in 2026.
Development and Design
In late 1995, Defence Evaluation and Research Agency (DERA) in conjunction with Royal Arsenal, began the Hypersonic-Flight-Research-Vehicle (HFRV) program for hypersonic propulsion. The purpose of the program was to investigate and demonstrate the feasibility of the Dual-Mode Ramjet (DMR) to enable sustained high-speed travel in the Mach 5-10 range by offering both efficient supersonic combustion and the ability to handle variable flight speeds.
Since the DMR is an air-breathing system, It uses atmospheric oxygen for combustion, reducing the need to carry oxidizers on board. This improves overall fuel efficiency, range, and payload capacity, making the DMR ideal for long-ranged strikes.
The Black Arrow has a slim, streamlined profile with a sleek, cylindrical body. This shape is optimized for high speed travel through the atmosphere with minimal air resistance, maximizing its ability to reach hypersonic speeds.
The missile is equipped with small stabilizing fins and adjustable control surfaces. These compact fins contribute to the missile's high maneuverability, allowing it to make agile turns even at high speeds. This capability is essential for evading missile defence systems and interceptors, enabling the Black Arrow to reach well defended targets.
The Black Arrow was developed to be launched from surface warships, submarines and aircraft. The missile has a tri-mode fuse which allows air-burst, point-impact and delay detonation modes.
Early Flight Testing
In 2005, a prototype missile was cleared for tests at the Galloway Guided Weapon Range, carried by an RAF Typhoon fighter. The missile failed to launch on three separate tests, and it was found that extensive redesign of the missile was needed.
Near cancellation and Khalistanian membership
With the failure of the prototype missile launch, further flight testing was delayed until the faults could be rectified. Costs began to mount, and a project report made by the Ministry of Defense felt that the lack of progress of the Black Arrow program meant it wasn't worth investing in and other equipment projects should take priority.