Project 11431 aircraft carrier: Difference between revisions
(Spell-checking) |
(Page structure to fill up) |
||
Line 1: | Line 1: | ||
{|{{Infobox ship begin}} | {|{{Infobox ship begin}} | ||
{{Infobox ship class overview | |||
| Operators = {{flag|Itayana}} | |||
| Class before = | |||
| Cost = | |||
| Built range = 1984-2013 | |||
| In commission range = 2015-present | |||
| Total ships building = | |||
| Total ships planned = | |||
| Total ships completed = 1 | |||
| Total ships cancelled = | |||
| Total ships active = 1 | |||
| Total ships laid up = | |||
| Total ships lost = | |||
| Total ships retired = | |||
| Total ships preserved = | |||
}} | |||
{{Infobox ship characteristics | {{Infobox ship characteristics | ||
| Hide header = | | Hide header = | ||
| Header caption = | | Header caption = | ||
| Ship type = {{wp|Aircraft carrier}} | | Ship type = {{wp|Aircraft carrier}} | ||
| Ship tonnage = | | Ship tonnage = | ||
Line 9: | Line 25: | ||
| Ship beam = {{convert|61|m|ft}} | | Ship beam = {{convert|61|m|ft}} | ||
| Ship height = | | Ship height = | ||
| Ship draught = {{convert|10. | | Ship draught = {{convert|10.3|m|ft}} | ||
| Ship draft = | | Ship draft = | ||
| Ship depth = | | Ship depth = | ||
Line 28: | Line 44: | ||
| Ship capacity = | | Ship capacity = | ||
| Ship troops = | | Ship troops = | ||
| Ship complement = 155 officers | | Ship complement = 155 officers, 1150 sailors | ||
| Ship crew = | | Ship crew = | ||
| Ship time to activate = | | Ship time to activate = | ||
Line 35: | Line 51: | ||
* {{wp|X band}} AESA multipurpose radar (4 arrays) | * {{wp|X band}} AESA multipurpose radar (4 arrays) | ||
* 2 navigation radars | * 2 navigation radars | ||
* Optronic search and scan suite | |||
* Electronic warfare suite | * Electronic warfare suite | ||
* Sonar suite | * ''Ploynomi'' Sonar suite | ||
* Combat integration suite | * Combat integration suite | ||
* Airgroup control suite | * Airgroup control suite | ||
| Ship armament= | | Ship armament= * 6 6*30mm HO-630A CIWS | ||
| Ship armour= | | Ship armour= | ||
| Ship armor= | | Ship armor= | ||
| Ship aircraft = 12-24 aircraft (estimate): {{bulleted list | | Ship aircraft = 12-24 aircraft (estimate): {{bulleted list | ||
| [[Sorranus_So-30|A16S2]] heavy fighters | | [[Sorranus_So-30|A16S2]] heavy fighters | ||
| [[Mikasa_Gallienus_MiK-28|A14K4]] light fighters | |||
| [[MIAEZ-60|KO6T-A]] helicopters | |||
}} | }} | ||
| Ship aircraft facilities = * 14-degree [[Aircraft ski-jump|ski-jump]] | | Ship aircraft facilities = * 14-degree [[Aircraft ski-jump|ski-jump]] | ||
* Three 30-ton arrestor wires | |||
* One 30-ton deck elevator | |||
| Ship notes = | | Ship notes = | ||
}} | }} | ||
|} | |} | ||
'''Project 11431''' is the official designation of a | '''Project 11431''' is the official designation of a redesign of [[Elatia|Elatian]] '''XXX-class aircraft carriers''' by the [[Itayana Navy]]. The original design was conceived as a as a hybrid {{wp|Aircraft cruiser|aircraft-carrying}} {{wp|guided missile cruiser}} capable of a hybrid aircraft-guided missile first-strike from direct following as well as being a versatile flagship for the task forces of [[Elatian Navy]]. Two ships were laid down, but the [[Elatian Great Famine]] of 1984-1987 prevented them from being completed. | ||
The second ship in the class was put on hold at 35% completion before being purchased in 1996 by the Temple of Yanbango to serve as the future flagship and as an experimental aircraft carrier for the nascent Itayana Navy, as well as a symbol of [[Itayana]] national recovery. Extensive remodeling and reconstruction efforts couldn't begin until 2003 due to the lack of funding, and continued for over a decade. As such, the design incorporated many changes from experience and expertise accumulated by technical missions of the Temple in [[Sante Reze]] and [[Zacapican]] and is considered a separate project. The vessel entered service in 2015. | |||
==Development== | |||
{{main article|XXX-class aircraft carrier}} | |||
==Design== | |||
===Armament=== | |||
===Electornics=== | |||
===Propulsion=== | |||
===Air group=== | |||
==Ships in class== | |||
{|class="wikitable" | |||
|- bgcolor="#efefef" | |||
! Navy | |||
! Name | |||
! Translation | |||
! Laid down | |||
! Launched | |||
! Commissioned | |||
! Status | |||
|- | |||
|{{flagicon|Itayana}} [[Itayana Navy]] | |||
|TBD | |||
|TBD | |||
|1984 | |||
|2009 | |||
|2015 | |||
|Active | |||
|- | |||
|} |
Revision as of 22:16, 12 May 2023
Class overview | |
---|---|
Operators: | Itayana |
Built: | 1984-2013 |
In commission: | 2015-present |
Completed: | 1 |
Active: | 1 |
General characteristics | |
Type: | Aircraft carrier |
Length: | 284 metres (932 ft) (overall) |
Beam: | 61 metres (200 ft) |
Draught: | 10.3 metres (34 ft) |
Propulsion: |
|
Speed: | +30 knots (56 km/h) |
Range: | +13,500 nautical miles (25,000 km) |
Endurance: | 45 days |
Complement: | 155 officers, 1150 sailors |
Sensors and processing systems: | |
Armament: | 6 6*30mm HO-630A CIWS |
Aircraft carried: | 12-24 aircraft (estimate): |
Aviation facilities: |
|
Project 11431 is the official designation of a redesign of Elatian XXX-class aircraft carriers by the Itayana Navy. The original design was conceived as a as a hybrid aircraft-carrying guided missile cruiser capable of a hybrid aircraft-guided missile first-strike from direct following as well as being a versatile flagship for the task forces of Elatian Navy. Two ships were laid down, but the Elatian Great Famine of 1984-1987 prevented them from being completed.
The second ship in the class was put on hold at 35% completion before being purchased in 1996 by the Temple of Yanbango to serve as the future flagship and as an experimental aircraft carrier for the nascent Itayana Navy, as well as a symbol of Itayana national recovery. Extensive remodeling and reconstruction efforts couldn't begin until 2003 due to the lack of funding, and continued for over a decade. As such, the design incorporated many changes from experience and expertise accumulated by technical missions of the Temple in Sante Reze and Zacapican and is considered a separate project. The vessel entered service in 2015.
Development
Design
Armament
Electornics
Propulsion
Air group
Ships in class
Navy | Name | Translation | Laid down | Launched | Commissioned | Status |
---|---|---|---|---|---|---|
Itayana Navy | TBD | TBD | 1984 | 2009 | 2015 | Active |