Shazbotdom Imperial Space Administration: Difference between revisions

Jump to navigation Jump to search
Line 156: Line 156:
'''''Secondary Window'''''
'''''Secondary Window'''''
:This mission will not utilize a Secondary Window.
:This mission will not utilize a Secondary Window.
<!--'''''<u>MTB-11</u>'''''
<!--'''''<u>MTB-11</u>'''''
:The purpose of Mission Weather Station Launch 1 is to Launch 12 Ground Weather Stations to Mars. This mission will take off from Launch Complex #8 at the George A. Loak Memorial Space Center.  
:The purpose of Mission Weather Station Launch 1 is to Launch 12 Ground Weather Stations to Mars. This mission will take off from Launch Complex #8 at the George A. Loak Memorial Space Center.  
Line 169: Line 168:
'''''Secondary Window'''''
'''''Secondary Window'''''
:If there is a complication with the Primary Window and it is scrubbed, the Secondary Window will be on the 4th of August, 2024 between 08:00 and 16:00.
:If there is a complication with the Primary Window and it is scrubbed, the Secondary Window will be on the 4th of August, 2024 between 08:00 and 16:00.
<!--'''''<u>1MCB-04</u>'''''
<!--'''''<u>1MCB-04</u>'''''
:The purpose of Mission 1st Mars Colony Build 4 is to Launch the 4th Solar Panel Array <small>(w/ Atmospheric ReEntry Cover)</small> to Mars Colony Transfer Vessel. This mission will take off from Launch Complex #9 at the George A. Loak Memorial Space Center.  
:The purpose of Mission 1st Mars Colony Build 4 is to Launch the 4th Solar Panel Array <small>(w/ Atmospheric ReEntry Cover)</small> to Mars Colony Transfer Vessel. This mission will take off from Launch Complex #9 at the George A. Loak Memorial Space Center.  
Line 182: Line 180:
'''''Secondary Window'''''
'''''Secondary Window'''''
:If there is a complication with the Primary Window and it is scrubbed, the Secondary Window will be on the 6th of August, 2024 between 08:00 and 16:00.
:If there is a complication with the Primary Window and it is scrubbed, the Secondary Window will be on the 6th of August, 2024 between 08:00 and 16:00.
<!--'''''<u>NTC1-02</u>'''''
<!--'''''<u>NTC1-02</u>'''''
:The purpose of Mission Nauanganni Tuuni Contract 1 Launch 2 is to Launch the 2nd Launch in 1st Contract for Nauanganni Tuuni Aerospace and Underwater Association. This mission will take off from Launch Complex #10 at the George A. Loak Memorial Space Center.  
:The purpose of Mission Nauanganni Tuuni Contract 1 Launch 2 is to Launch the 2nd Launch in 1st Contract for Nauanganni Tuuni Aerospace and Underwater Association. This mission will take off from Launch Complex #10 at the George A. Loak Memorial Space Center.  
Line 195: Line 192:
'''''Secondary Window'''''
'''''Secondary Window'''''
:If there is a complication with the Primary Window and it is scrubbed, the Secondary Window will be on the 8th of August, 2024 between 08:00 and 16:00.
:If there is a complication with the Primary Window and it is scrubbed, the Secondary Window will be on the 8th of August, 2024 between 08:00 and 16:00.
<!--'''''<u>CSF-21</u>'''''
<!--'''''<u>CSF-21</u>'''''
:The purpose of Mission Commercial Space Flight 21 is to Launch 12 [[CosmoCast Shazbotdom#Version_3_Mini|v3 Mini Satellites]] into Earth Orbit for [[CosmoCast Shazbotdom]]. This mission will take off from Launch Complex #44 at the Anders L. Cooperston Memorial Space Center.  
:The purpose of Mission Commercial Space Flight 21 is to Launch 12 [[CosmoCast Shazbotdom#Version_3_Mini|v3 Mini Satellites]] into Earth Orbit for [[CosmoCast Shazbotdom]]. This mission will take off from Launch Complex #44 at the Anders L. Cooperston Memorial Space Center.  
Line 208: Line 204:
'''''Secondary Window'''''
'''''Secondary Window'''''
:If there is a complication with the Primary Window and it is scrubbed, the Secondary Window will be on the 10th of August, 2024 between 08:00 and 16:00.
:If there is a complication with the Primary Window and it is scrubbed, the Secondary Window will be on the 10th of August, 2024 between 08:00 and 16:00.
<!--'''''<u>1MCB-05</u>'''''
<!--'''''<u>1MCB-05</u>'''''
:The purpose of Mission 1st Mars Colony Build 5 is to Launch the 1st Battery Array <small>(w/ Atmospheric ReEntry Cover)</small> to Mars Colony Transfer Vessel. This mission will take off from Launch Complex #1 at the George A. Loak Memorial Space Center.  
:The purpose of Mission 1st Mars Colony Build 5 is to Launch the 1st Battery Array <small>(w/ Atmospheric ReEntry Cover)</small> to Mars Colony Transfer Vessel. This mission will take off from Launch Complex #1 at the George A. Loak Memorial Space Center.  
Line 221: Line 216:
'''''Secondary Window'''''
'''''Secondary Window'''''
:If there is a complication with the Primary Window and it is scrubbed, the Secondary Window will be on the 12th of August, 2024 between 08:00 and 16:00.
:If there is a complication with the Primary Window and it is scrubbed, the Secondary Window will be on the 12th of August, 2024 between 08:00 and 16:00.
<!--'''''<u>1MCB-06</u>'''''
<!--'''''<u>1MCB-06</u>'''''
:The purpose of Mission 1st Mars Colony Build 6 is to Launch the 2nd Battery Array <small>(w/ Atmospheric ReEntry Cover)</small> to Mars Colony Transfer Vessel. This mission will take off from Launch Complex #2 at the George A. Loak Memorial Space Center.  
:The purpose of Mission 1st Mars Colony Build 6 is to Launch the 2nd Battery Array <small>(w/ Atmospheric ReEntry Cover)</small> to Mars Colony Transfer Vessel. This mission will take off from Launch Complex #2 at the George A. Loak Memorial Space Center.  
Line 234: Line 228:
'''''Secondary Window'''''
'''''Secondary Window'''''
:If there is a complication with the Primary Window and it is scrubbed, the Secondary Window will be on the 15th of August, 2024 between 08:00 and 16:00.
:If there is a complication with the Primary Window and it is scrubbed, the Secondary Window will be on the 15th of August, 2024 between 08:00 and 16:00.
<!--'''''<u>SSB-15</u>'''''
<!--'''''<u>SSB-15</u>'''''
:The purpose of Mission Space Station Build 15 is to Launch the New Housing Unit, with Internet Connectivity Hubs, to the [[Space_Stations_of_the_Shazbotdom_Imperial_Space_Administration#Orbital_Science_Space_Station|Orbital Science Space Station]]. This mission will take off from Launch Complex #41 at the Anders L. Cooperston Memorial Space Center.  
:The purpose of Mission Space Station Build 15 is to Launch the New Housing Unit, with Internet Connectivity Hubs, to the [[Space_Stations_of_the_Shazbotdom_Imperial_Space_Administration#Orbital_Science_Space_Station|Orbital Science Space Station]]. This mission will take off from Launch Complex #41 at the Anders L. Cooperston Memorial Space Center.  

Revision as of 23:53, 28 July 2024

The Shazbotdom Imperial Space Administration, the only space launch organization within the Shazbotdom Empire, is responsible for launch functions for the entire Shazbotdom Space Environment. It has been more than forty years since the Administration was founded, and it has been an exemplary setter of public space travel ever since it was established more than forty (40) years ago. The administration has just entered a new golden age of space travel, and it is working feverishly to ensure that the Empire remains at the forefront of space exploration in this new golden age of space exploration. The administration is working feverishly to make sure that the Empire remains at the forefront of space exploration in this new golden age.

Official Administration Appication Website || Official Administration Website
Imperial Space Administration
RHCpbut.png
VbeoWiK.png
Launch of Mission 1st
Lunar Farm Build 25
AbbreviationISA
Formation17 August, 1978
HeadquartersJoliet, Shazbotdom
Official language
English, Shazonite
Administrator
Dr. Gilbert Godwin
George A. Loak Memorial Space Center
Parent organisation
Ministry of the Interior, The Shazbotdom Empire
Budget
B$575 Billion

History

The Imperial Space Administration (ISA) was founded in 1978 to use telescopes to observe the cosmos. It expanded to 8 different telescope arrays and the first director was appointed by the Original Emperor, Shaz Bot, on the 29th of August, 1978. The ISA played a pivotal role in the exploration of space during the 1980s, leading to numerous groundbreaking initiatives. The 4534-class Rocket System was a key feature of the ISA's commitment to pushing the limits of space travel. It was designed to transport both crewed and unmanned missions into Earth orbit, with a primary focus on exploration of Luna and Earth. The most notable mission was the launch of Imperial Lab 1 in 1981, which was the first orbital laboratory for the Shazbotdom Empire. The Lab 1 facilitated groundbreaking research that contributed to advancements in space technology and expanded our understanding of the universe. However, despite its remarkable contributions, the Lab 1 was unexpectedly decommissioned in 1985 after only 4 years into its 8 year mission.

Launches

Year End Totals

   2022 2023
Orbital 56 156
SubOrbital 14 24
DeOrbits 2 12
TOTAL 72 192

SubOrbital

Past SubOrbital Launches

Mission Date Completion Description Booster NOTES:
SRL-03 15 June, 2024 11:15 3rd Sounding Rocket Launch with Scientific Experiment SR-03 Mission Successful
SRL-04 16 July, 2024 16:15 4th Sounding Rocket Launch with Scientific Experiment SR-04 Mission Successful

Next SubOrbital Launch

SRL-05

The purpose of Sound Rocket Launch 05 is a SubOrbital Flight of a Sounding Rocket with an Unknown MicroGravity Experiment. This Mission will take off from SubOrbital Pad J-04 at the SubOrbital Rocket Launch Facility.

Booster

This flight will utilize Booster SR-05 in its Only Mission.

Launch Window

The Launch Window will be on the 19th of August, 2024 between 07:00 and 19:30.

Upcoming SubOrbital Launches

^ = In Queue to be Made | * = Video Made | ** = video Edited | No Symbol = Uploaded
Mission Test Launch
Complex
Launch Window Description Booster
SRL-06 J-01 12 Sept, 2024 Launch of Sounding Rocket SR-06
SRL-07^ J-05 9 Oct, 2024 Launch of Sounding Rocket SR-07
SRL-08^ J-03 19 Nov, 2024 Launch of Sounding Rocket SR-08
SRL-09^ J-04 21 Dec, 2024 Launch of Sounding Rocket SR-09
SRL-10^ J-02 29 Jan, 2025 Launch of Sounding Rocket SR-10

Orbital Launches

Past Orbital Launches

Mission Date Completion Description 1S 2S 3S NOTES:
PFF-81 2 July, 2024 17:40 81st PATHOS Foundation Flight Z-6 T-7    
MTB-01
DeOrbit
4 July, 2024 14:05 DeOrbit of 2nd stage Booster from Mission MTB-01   T-8    
TRA-07 7 July, 2024 12:30 Mission to launch Lander Chi-3 to M.O.T.S. Z-7 O-4 C-3  
TRA-08 9 July, 2024 15:00 Mission to launch Lander Chi-4 to M.O.T.S. Z-8 O-10 C-4  
CSF-19 11 July, 2024 10:40 Mission to Launch 20 v3 Mini Satellites into Earth
Orbit for CosmoCast Shazbotdom
U-1 P-2    
CSF-20 14 July, 2024 16:40 Mission to Launch 20 v3 Mini Satellites into Earth
Orbit for CosmoCast Shazbotdom
U-2 P-2    
1MCB-02 16 July, 2024 13:00 Mission to Launch 2nd Solar Panel Array
to Mars Colony Transfer Vessel
Z-9 O-1    
1MCB-03 18 July, 2024 18:00 Mission to Launch 3rd Solar Panel Array
to Mars Colony Transfer Vessel
Z-10 O-2    
CRW-10
DeOrbit
20 July, 2024 09:05 Mission to DeOrbit 10th Crewed Mission from the
Orbital Science Space Station
    E-2  
MTB-08 22 July, 2024 15:15 Mission to Launch and Dock 1st Temporary Engine Segment
to Mars Orbital Transfer Station
Z-11 O-3    
ISR-06
DeOrbit
23 July, 2024 16:25 Mission to DeOrbit 6th ReSupply Mission from the
Orbital Science Space Station
    O-1  
MTB-09 24 July, 2024 17:40 Mission to Launch and Dock Cross Brace Segment
to Mars Orbital Transfer Station
Z-12 O-4    
NTC1-01 27 July, 2024 18:50 1st Launch of 1st Contract for Nauanganni Tuuni
Aerospace and Underwater Association
Z-13 T-9    
MTB-10 28 July, 2024 18:40 Mission to Launch and Dock 2nd Temporary Engine Segment
to Mars Orbital Transfer Station
Z-14 O-5    

Next Orbital Launches

Strike Out Text means that the Primary Window was Scrubbed.

MTB-11

The purpose of Mission Mars Transfer Station Build 11 is to begin the Journey of the Mars Orbital Transfer Station out of Earth Space towards Mars.

1st Stage Booster

This flight will not utilize a First Stage Booster.

2nd Stage Booster

This flight will not utilize a Second Stage Booster.

3rd Stage Booster

This flight will not utilize a Third Stage Booster.

Primary Window

The Primary Window is on the 29th of July, 2024 between 00:00 and 23:99.

Secondary Window

This mission will not utilize a Secondary Window.

Upcoming Orbital Launches

^ = In Queue to be Made | * = Video Made | ** = video Edited | No Symbol = Uploaded

August 2024

Mission LC Primary
Window
Secondary
Window
Description 1S 2S 3S
WSL-01 #8 3 August, 2024 4 August, 2024 Mission to Launch 12 Ground Weather Stations to Mars Z-15 T-8  
1MCB-04 #9 5 August, 2024 6 August, 2024 Mission to Launch 4th Solar Panel Array (w/ Atmospheric
ReEntry Cover)
to Mars Colony Transfer Vessel
Z-1 O-6  
NTC1-02 #10 7 August, 2024 8 August, 2024 2nd Launch in 1st Contract for Nauanganni
Tuuni Aerospace and Underwater Association
Z-2 T-10  
CSF-21 #44 9 August, 2024 10 August, 2024 Launch of 12 v3 Mini Satellites into Earth Orbit
for CosmoCast Shazbotdom
U-3 P-3  
1MCB-05 #1 11 August, 2024 12 August, 2024 Mission to Launch 1st Battery Array (w/ Atmospheric
ReEntry Cover)
to Mars Colony Transfer Vessel
Z-3 O-8  
1MCB-06 #2 14 August, 2024 15 August, 2024 Mission to Launch 2nd Battery Array (w/ Atmospheric
ReEntry Cover)
to Mars Colony Transfer Vessel
Z-4 O-9  
SBB-15 #41 17 August, 2024 18 August, 2024 Mission to Launch New Housing Unit w/ Internet
Connectivity Hubs to Orbital Science Space Station
U-4 P-4  
NCS2-01* #3 21 August, 2024 22 August, 2024 1st Launch in 2nd Contract for New Chinese Space Program Z-5 O-5  
NCS2-02^ #4 24 August, 2024 25 August, 2024 2nd Launch in 2nd Contract for New Chinese Space Program Z-6 O-6  
NCS2-03^ #5 26 August, 2024 27 August, 2024 3rd Launch in 2nd Contract for New Chinese Space Program Z-7 O-7  
CRW-14^ #42 29 August, 2024 30 August, 2024 Launch of 14th Crewed Mission to
the Orbital Science Space Station
D-3 G-2 E-6

September 2024

Mission LC Primary
Window
Secondary
Window
Description 1S 2S 3S
NCS1-01^ #42 1 Sept, 2024 2 Sept, 2024 1st Launch in 1st Contract for New Chinese Space Program U-5 P-5  
NCS1-02^ #43 2 Sept, 2024 3 Sept, 2024 2nd Launch in 1st Contract for New Chinese Space Program U-6 P-6  
ROV-07^ #6 3 Sept, 2024 4 Sept, 2024 7th Rover Mission (Destination: Mars) Z-8 T-11  
NCS1-03^ #44 4 Sept, 2024 5 Sept, 2024 3rd Launch in 1st Contract for New Chinese Space Program U-7 P-7  
CRW-11^
DeOrbit
  5 Sept, 2024   DeOrbit of 11th Crewed Space Flight     E-3
NCS1-04^ #41 5 Sept, 2024 6 Sept, 2024 4th Launch in 1st Contract for New Chinese Space Program U-8 P-8  
ROV-08^ #7 6 Sept, 2024 7 Sept, 2024 8th Rover Mission (Destination: Venus) Z-9 T-12  
CSF-22^ #42 7 Sept, 2024 8 Sept, 2024 Launch of 12 v3 Mini Satellites into Earth Orbit
for CosmoCast Shazbotdom
U-9 P-9  
CSF-23^ #43 8 Sept, 2024 9 Sept, 2024 Launch of 12 v3 Mini Satellites into Earth Orbit
for CosmoCast Shazbotdom
U-10 P-10  
CSF-24^ #44 9 Sept, 2024 10 Sept, 2024 Launch of 12 v3 Mini Satellites into Earth Orbit
for CosmoCast Shazbotdom
U-1 P-1  
NCS2-04^ #8 12 Sept, 2024 13 Sept, 2024 4th Launch in 2nd Contract for New Chinese Space Program Z-10 O-8  
NCS2-05^ #9 13 Sept, 2024 14 Sept, 2024 5th Launch in 2nd Contract for New Chinese Space Program Z-11 O-9  

New Chinese Space Program 1

These Missions require Medium Lift. There are 30 Total Launches. 0 Completed and 4 Scheduled Launches.

New Chinese Space Program 2

These Missions require Heavy Lift. There are 50 Total Launches. 0 Complete and 3 Scheduled Launches.

Commercial Partners

Shazonian Aerodynamics

Shazonian Aerodynamics is a renowned company specializing in building rocket engines for the Shazbotdom Imperial Space Agency. With their cutting-edge technology and expertise, they have played a crucial role in propelling the Shazbotdom's space exploration missions to new heights.
The significance of Shazonian Aerodynamics can be seen in their contribution to the economy of Shazbotdom. Being the 6th largest employer in the country, they provide valuable job opportunities to a significant number of individuals. Their workforce consists of highly skilled engineers, technicians, and support staff who work tirelessly to ensure the success of their projects.
The success of Shazonian Aerodynamics can be attributed to their relentless pursuit of innovation and excellence. Their research and development department constantly pushes the boundaries of aerodynamics, striving to create more efficient and powerful rocket engines. By staying at the forefront of technological advancements, they have cemented their position as a leader in the industry.
As the primary company responsible for the maintenance of ShazAir, Shazonian Aerodynamics has established itself as a trusted partner in the aerospace industry. Their dedication to quality and safety has made them an integral part of ShazAir's operations, ensuring that the fleet remains in optimal condition.
In addition to their work with the Shazbotdom Imperial Space Agency and ShazAir, Shazonian Aerodynamics also collaborates with other international space agencies and aerospace companies. This collaboration not only enhances their expertise but also fosters the exchange of knowledge and ideas, pushing the boundaries of what is possible in the field of aerodynamics.
When it comes to safety, Shazonian Aerodynamics leaves no room for compromise. They adhere to strict safety standards and regulations, ensuring that their rocket engines and maintenance practices meet the highest level of reliability. This commitment to safety has earned them a reputation for delivering products and services that are dependable and trustworthy.

Rocket Engine Models

Active Use

  Bird of Prey-class v1 Bird of Prey-class v2 Wizzard-class Voltrai-class
Ion Engine
Kelabri-class
Photo
BirdOfPreyV1-class Engine.png
BirdOfPreyV2-Engine.png
Wizzard-class Engine.png
Voltrai-class.png
Kelabri-class.png
Weight 7 Tons 10 Tons 3 Tons 0.5 Tons 0.5 Tons
Thrust 230 Tons 80 Tons 47 Tons 16 Tons 1.9 Tons
 
  Triangulum-class
Aerospike v1.0
Triangulum-class
Aerospike v1.5
Rook-class    
Photo
TriangulumAerospike-class Engine.png
TriangulumAerospike-class Engine.png
Rook-class Engine.png    
Weight 5 Tons 3 Tons 11 Tons    
Thrust 185 Tons 160 Tons 390 Tons    

Grants Metal Supply

Grants Metal Supply is a vital partner corporation for the Shazbotdom Imperial Space Administration (SISA). With their exceptional expertise in metal supply, Grants Metal Supply plays a crucial role in the success of SISA's rocket missions. As the sole supplier of metals required for all rockets, Grants Metal Supply ensures the highest quality materials are used in the construction of SISA's space vehicles.
The collaboration between Grants Metal Supply and SISA dates back to the inception of the space agency. Recognizing the importance of reliable and durable materials in rocket manufacturing, SISA sought out Grants Metal Supply as their trusted partner. Grants Metal Supply's impeccable reputation for delivering top-notch products made them an obvious choice.
One of the primary reasons SISA chose Grants Metal Supply is their extensive range of metal offerings. Grants Metal Supply provides a wide variety of metals, including aluminum, titanium, steel, and alloys specifically designed for space applications. This comprehensive selection allows SISA to select the most suitable materials for each component of their rockets, ensuring optimal performance and safety.
Furthermore, Grants Metal Supply is an organization that excels at meeting tight deadlines in addition to offering a diverse range of metals. Due to the fact that space missions often have a tight delivery schedule, it is essential for SISA to have a partner who can deliver materials on time. Grants Metal Supply's efficient supply chain management ensures that SISA receives the required metals in a timely manner, minimizing any potential delays in the rocket manufacturing process.
There is no doubt that quality control plays an important part in the aerospace industry, and Grants Metal Supply is well aware of this. They have implemented stringent quality assurance protocols to ensure that the metals they supply meet the highest industry standards. Through rigorous testing and inspection procedures, Grants Metal Supply guarantees that the materials are free from defects and possess the necessary properties for space travel.
Additionally, Grants Metal Supply recognizes the importance of environmental responsibility and sustainability. As part of the company's commitment to minimizing the impact on the environment, they actively promote the use of recycled metals. By incorporating recycled materials into their offerings, Grants Metal Supply contributes to SISA's commitment to sustainable space exploration.
Grants Metal Supply and SISA have formed a strategic partnership that extends far beyond the provision of metals. SISA's engineering teams also receive technical assistance and guidance from Grants Metal Supply as part of their technical support. As a result of their knowledge and experience in the field of material selection, the engineering teams at SISA are able to provide valuable insights on how to improve the design and performance of the rockets they build.

Space Launch Facilities

As of the current time, the Shazbotdom Imperial Space Administration has a total of 3 Orbital Launch Facilities (George A. Loak Memorial Space Center, Marine Air Corps Base Delta 3, and Anders L. Cooperston Memorial Space Center) and 1 SubOrbital Test Launch Facility.

Equipment

Space Stations

The Imperial Space Agency utilizes a variety of Orbital Stations for its operations. This includes the Orbital Science Space Station, which is set to have a lifespan of 60 years due to it's ability to be updated and have modules replaced with newer equipment, the upcoming High Orbit Transfer Station, which will be utilized in the transfer of people and equipment for the self-sustaining colonies that will be setup on Mars and Venus, and the upcomming Lunar Transfer Station, which will be utilized for the transfer of people and equipment for the self-sustaining colony on Luna.

Launch Platforms

The Imperial Space Agency utilizes a variety of Launch Platforms for its operations. This includes the Low to Mid Orbit Launch System and the Heavy Launch System. These platforms are to be utilized for launching of Satellites into orbit, the Construction and maintenance of the Space Stations, and the construction of the Lunar and Mars Colonial equipment.

Space Suits

The Shazbotdom Imperial Space Administration utilizes a total of Three (3) Space Suits for varried uses. Two of these (the Class-1 and Class-2) are currently in use while the Class-3 is awaiting it's first use for when the Colonial Posessions on Mars and Venus are established.

Solar System Colonial Posessions

The Shazbotdom Empire and Imperial Space Agency are planning on beginning the perminant colonization of the Lunar, Venus and Martian Surfaces.