Constantinoupoli Metro: Difference between revisions
Jump to navigation
Jump to search
(→Lines) |
No edit summary |
||
Line 9: | Line 9: | ||
| native_name = ''Μετρό Κωνσταντινούπολης'' | | native_name = ''Μετρό Κωνσταντινούπολης'' | ||
| locale = [[Constantinoupoli]], [[Apollonia]], [[Romaia]] | | locale = [[Constantinoupoli]], [[Apollonia]], [[Romaia]] | ||
| owner = | | owner = [[ASK]] | ||
| transit_type = Rapid transit | | transit_type = Rapid transit | ||
| lines = 9 (plus 3 under construction) | | lines = 9 (plus 3 under construction) | ||
Line 16: | Line 16: | ||
| annual_ridership = 685 million (2018) | | annual_ridership = 685 million (2018) | ||
| website = metro.con.ra | | website = metro.con.ra | ||
| began_operation = | | began_operation = 1910 | ||
| operator = ASK | | operator = ASK | ||
| marks = | | marks = | ||
Line 30: | Line 30: | ||
}} | }} | ||
The '''Constantinoupoli Metro''' ({{lang|el|Μετρό Κωνσταντινούπολης}}, romanized: ''Metrò Konstantinùpolis'') is a rapid transit system in [[Constantinoupoli]] operated by [[ASK]]. As of 2023, the system comprises nine lines. | The '''Constantinoupoli Metro''' ({{lang|el|Μετρό Κωνσταντινούπολης}}, romanized: ''Metrò Konstantinùpolis'') is a rapid transit system in [[Constantinoupoli]] operated by [[ASK]]. As of 2023, the system comprises nine lines. It is mostly underground, and is TBD kilometres (TBD mi) long. It has TBD stations, of which TBD have transfers between lines. There are 9 lines (with an additional three under construction), numbered 1 to 9. Lines 8 and Line 9 are automated. Lines are identified on maps by number and colour, with the direction of travel indicated by the terminus. | ||
== Lines == | == Lines == | ||
Line 43: | Line 43: | ||
! Avg. station<br />distance (km) | ! Avg. station<br />distance (km) | ||
|- | |- | ||
|width=50px align=center| [[File:Metro con line1.png|30px]] || Acherne || Platia Aidonias || | |width=50px align=center| [[File:Metro con line1.png|30px]] || Acherne || Platia Aidonias || 1910 || 2022 || TBD || TBD || TBD | ||
|- | |- | ||
|align=center| [[File:Metro con line2.png|30px]] || Peripatos ton Iaonion || Platia Efsevias || | |align=center| [[File:Metro con line2.png|30px]] || Peripatos ton Iaonion || Platia Efsevias || 1917 || 2011 || TBD || TBD || TBD | ||
|- | |- | ||
|align=center| [[File:Metro con line3.png|30px]] || Konstantiniani || Attalias Odos || | |align=center| [[File:Metro con line3.png|30px]] || Konstantiniani || Attalias Odos || 1931 || 2011 || TBD || TBD || TBD | ||
|- | |- | ||
|align=center| [[File:Metro con line4.png|30px]] || Ethniko Stadio || Livadia-Aerolimenas || 1980 || 2006 || TBD || TBD || TBD | |align=center| [[File:Metro con line4.png|30px]] || Ethniko Stadio || Livadia-Aerolimenas || 1980 || 2006 || TBD || TBD || TBD | ||
Line 54: | Line 54: | ||
|- | |- | ||
|align=center| [[File:Metro con line6.png|30px]] || Parathalassio || Omonia || 2019 || 2022 || TBD || TBD || TBD | |align=center| [[File:Metro con line6.png|30px]] || Parathalassio || Omonia || 2019 || 2022 || TBD || TBD || TBD | ||
|- | |||
|align=center| [[File:Metro con line7.png|30px]] || TBD || TBD || 2019 || 2022 || TBD || TBD || TBD | |||
|- | |||
|align=center| [[File:Metro con line8.png|30px]] || TBD || TBD || 2019 || 2022 || TBD || TBD || TBD | |||
|- | |||
|align=center| [[File:Metro con line9.png|30px]] || TBD || TBD || 2019 || 2022 || TBD || TBD || TBD | |||
|- | |- | ||
|} | |} | ||
{{Constantinoupoli_transport_network}} | {{Constantinoupoli_transport_network}} |
Revision as of 09:23, 28 April 2023
This article is incomplete because it is pending further input from participants, or it is a work-in-progress by one author. Please comment on this article's talk page to share your input, comments and questions. Note: To contribute to this article, you may need to seek help from the author(s) of this page. |
Overview | |
---|---|
Native name | Μετρό Κωνσταντινούπολης |
Owner | ASK |
Locale | Constantinoupoli, Apollonia, Romaia |
Transit type | Rapid transit |
Number of lines | 9 (plus 3 under construction) |
Number of stations | 136 |
Daily ridership | 2.35 million (2018 average weekday) |
Annual ridership | 685 million (2018) |
Website | metro.con.ra |
Operation | |
Began operation | 1910 |
Operator(s) | ASK |
Technical | |
System length | 138 km (86 mi) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
Electrification | 750 V DC third rail |
The Constantinoupoli Metro (Μετρό Κωνσταντινούπολης, romanized: Metrò Konstantinùpolis) is a rapid transit system in Constantinoupoli operated by ASK. As of 2023, the system comprises nine lines. It is mostly underground, and is TBD kilometres (TBD mi) long. It has TBD stations, of which TBD have transfers between lines. There are 9 lines (with an additional three under construction), numbered 1 to 9. Lines 8 and Line 9 are automated. Lines are identified on maps by number and colour, with the direction of travel indicated by the terminus.