Atchison, Topeka and Santa Fe Railway: Difference between revisions

Jump to navigation Jump to search
No edit summary
No edit summary
Line 18: Line 18:
|predecessor_line  =  
|predecessor_line  =  
|successor_line    =  
|successor_line    =  
|gauge            = <!-- This needs to be able to handle two current gauges. -->
|old_gauge        = <!-- This needs a separate line -->
|old_gauge        = <!-- This needs a separate line -->
|electrification  =  
|electrification  =  
|length           =  
|gauge          = {{Track gauge|ussg|allk=on}}
|hq_city           =  
|length         = {{convert|13115|mi}}
|hq_city       = [[Chicago, Illinois]]<br />[[Kansas City, Missouri]]<br />[[Los Angeles, California]]
|website          = <!-- {{URL|example.com}} -->
|website          = <!-- {{URL|example.com}} -->
|embedded          = {{Infobox company
|embedded          = {{Infobox company

Revision as of 17:42, 22 February 2024

Atchison, Topeka and Santa Fe Railway
Atchison, Topeka and Santa Fe Railway Herald.svg
ATSF System Map.jpg
Dates of operationFebruary 11, 1859 (1859-02-11)–December 23, 1983 (1983-12-23)
Track gauge4 ft 8 12 in (1,435 mm) standard gauge
Length13,115 miles (21,107 km)
HeadquartersChicago, Illinois
Kansas City, Missouri
Los Angeles, California