Enigma Soulutions: Difference between revisions

Jump to navigation Jump to search
(Created page with "{{Infobox company | name = United Enigma Soulutions | logo = | logo_size = | logo_alt = | logo_caption = Reconized Company Offical | image = | image_size = | image_alt = | image_caption = | trading_name = Enigma | native_name = | native_name_lang = <!-- Use ISO 639-1 code, e.g. "fr" for French. For multiple names in different languages, use {{Lang|[code]|[name]}}. --> | romanized_name = | former_name = Frontline Releif LLC | type = Privately held company|Priv...")
 
No edit summary
Line 1: Line 1:
{{Infobox company
'''United Enigma Soulutions''' (or Enigma Soulutions, or Enigma LLC) is a Teprorian power and technological development company made and ran by Lucious I. Abbot Ramos. Enigma Soulutions is the primary power producer in Herwa and Tepror. {{Infobox company
| name = United Enigma Soulutions  
| name = United Enigma Soulutions  
| logo =  
| logo =  
Line 63: Line 63:
| footnotes =  
| footnotes =  
}}
}}
== History ==
Enigma LLC in its early  stages was simply a development company after the Skimtari Panic Wars commissioned by the Teprorian Provisional Government in order to secure external funding for reconstruction and aiding internal economic growth. Enigma was founded by Lucious I. Abbot Ramos, Enigma Corporation branched off into different fields of revenue when the Tepror began to recover from the Panic Wars.
=== The Silent Energy Crisis ===
While the major Teprorian crisis was coming to a close, other problems started to arise. The Silent Energy Crisis was a series of rolling blackouts in major population and manufacturing zones throughout Tepror. The blackouts happen at random interviews and often went completely unnoticed by the general population. But the rolling blackouts caused millions of dollars of loss of product and food stores, when the Department of Energy Management detected the silent blackouts they began to send out subsidies to power companies to encourage more power production.
Enigma LLC was one of the companies that began to utilize the power subsidies. Enigma LLC opened its first power plant in 1597 AD and was opened with limited approval. The Blackstone springs power plant was the first Mass fusion reactor plant Tepror had opened, and held many risks that most Teprorians refused to accept
== Operations ==
== Sponsors ==
== Controversies ==
== Departments ==
Enigma LLC has 4 Primary wings of its company. These wings facilitate and run Enigma Corp and its many different power production plants and research facilities.
=== Enigma Production Management. ===
=== Enigma Technological Management ===
=== Enigma Public Relations ===
=== Enigma Central Control ===
=== Enigma Executive Command ===

Revision as of 17:20, 4 April 2024

United Enigma Soulutions (or Enigma Soulutions, or Enigma LLC) is a Teprorian power and technological development company made and ran by Lucious I. Abbot Ramos. Enigma Soulutions is the primary power producer in Herwa and Tepror.

United Enigma Soulutions
Enigma
Formerly
Frontline Releif LLC
Private
IndustryPower and Technological Conglomerate
PredecessorFrontline Releif LLC
Founded1605 in Tepror
FounderDr. Lucious I. Abbot Ramos.
HeadquartersTepror,
Blackstone Springs
Area served
Tepror, Herwa.
Key people
Services
DivisionsCentral Production Command. Central Command. Saftey Command. Containment Command.

History

Enigma LLC in its early stages was simply a development company after the Skimtari Panic Wars commissioned by the Teprorian Provisional Government in order to secure external funding for reconstruction and aiding internal economic growth. Enigma was founded by Lucious I. Abbot Ramos, Enigma Corporation branched off into different fields of revenue when the Tepror began to recover from the Panic Wars.

The Silent Energy Crisis

While the major Teprorian crisis was coming to a close, other problems started to arise. The Silent Energy Crisis was a series of rolling blackouts in major population and manufacturing zones throughout Tepror. The blackouts happen at random interviews and often went completely unnoticed by the general population. But the rolling blackouts caused millions of dollars of loss of product and food stores, when the Department of Energy Management detected the silent blackouts they began to send out subsidies to power companies to encourage more power production.


Enigma LLC was one of the companies that began to utilize the power subsidies. Enigma LLC opened its first power plant in 1597 AD and was opened with limited approval. The Blackstone springs power plant was the first Mass fusion reactor plant Tepror had opened, and held many risks that most Teprorians refused to accept

Operations

Sponsors

Controversies

Departments

Enigma LLC has 4 Primary wings of its company. These wings facilitate and run Enigma Corp and its many different power production plants and research facilities.

Enigma Production Management.

Enigma Technological Management

Enigma Public Relations

Enigma Central Control

Enigma Executive Command