Shazbotdom Imperial Space Administration: Difference between revisions

Jump to navigation Jump to search
Line 313: Line 313:
|-
|-
| 1MCB-06* || <small>TBD</small> || <small>14 August, 2024</small> || <small>15 August, 2024</small> || <small>Mission to Launch 2nd Battery Array <small>(w/ Atmospheric<br>ReEntry Cover)</small> to Mars Colony Transfer Vessel</small> || <small>TBD</small> || <small>TBD</small> || &nbsp;
| 1MCB-06* || <small>TBD</small> || <small>14 August, 2024</small> || <small>15 August, 2024</small> || <small>Mission to Launch 2nd Battery Array <small>(w/ Atmospheric<br>ReEntry Cover)</small> to Mars Colony Transfer Vessel</small> || <small>TBD</small> || <small>TBD</small> || &nbsp;
|-
| SBB-15* || <small>TBD</small> || <small>17 August, 2024</small> || <small>18 August, 2024</small> || <small>Mission to Launch New Housing Unit w/ Internet Connectivity Hubs to [[Space_Stations_of_the_Shazbotdom_Imperial_Space_Administration#Orbital_Science_Space_Station|Orbital Science Space Station]]</small> || <small>TBD</small> || <small>TBD</small> || &nbsp;
|}
|}



Revision as of 05:38, 11 April 2024

The Shazbotdom Imperial Space Administration, the only space launch organization within the Shazbotdom Empire, is responsible for launch functions for the entire Shazbotdom Space Environment. It has been more than forty years since the Administration was founded, and it has been an exemplary setter of public space travel ever since it was established more than forty (40) years ago. The administration has just entered a new golden age of space travel, and it is working feverishly to ensure that the Empire remains at the forefront of space exploration in this new golden age of space exploration. The administration is working feverishly to make sure that the Empire remains at the forefront of space exploration in this new golden age.

Official Administration Appication Website || Official Administration Website
Imperial Space Administration
RHCpbut.png
VbeoWiK.png
Launch of Mission 1st
Lunar Farm Build 25
AbbreviationISA
Formation17 August, 1978
HeadquartersJoliet, Shazbotdom
Official language
English, Shazonite
Administrator
Dr. Gilbert Godwin
George A. Loak Memorial Space Center
Parent organisation
Ministry of the Interior, The Shazbotdom Empire
Budget
B$575 Billion

History

The Imperial Space Administration (ISA) was founded in 1978 to use telescopes to observe the cosmos. It expanded to 8 different telescope arrays and the first director was appointed by the Original Emperor, Shaz Bot, on the 29th of August, 1978. The ISA played a pivotal role in the exploration of space during the 1980s, leading to numerous groundbreaking initiatives. The 4534-class Rocket System was a key feature of the ISA's commitment to pushing the limits of space travel. It was designed to transport both crewed and unmanned missions into Earth orbit, with a primary focus on exploration of Luna and Earth. The most notable mission was the launch of Imperial Lab 1 in 1981, which was the first orbital laboratory for the Shazbotdom Empire. The Lab 1 facilitated groundbreaking research that contributed to advancements in space technology and expanded our understanding of the universe. However, despite its remarkable contributions, the Lab 1 was unexpectedly decommissioned in 1985 after only 4 years into its 8 year mission.

Launches

Year End Totals

   2022 2023
Orbital 56 156
SubOrbital 14 24
DeOrbits 2 12
TOTAL 72 192

SubOrbital

Past SubOrbital Launches

Mission Date Completion Description Booster NOTES:

Next SubOrbital Launch

SRL-01

The purpose of Sound Rocket Launch 01 is a SubOrbital Flight of a Sounding Rocket with an Unknown MicroGravity Experiment. This Mission will take off from SubOrbital Pad J-01 at the SubOrbital Rocket Launch Facility.

Booster

This flight will utilize Booster SR-01 in its Only Mission.

Launch Window

The Launch Window will be on the ##th of April, 2024 between 07:00 and 19:30.

Upcoming SubOrbital Launches

Mission Test Launch
Complex
Launch Window Description Booster
SRL-02 J-05 # May, 2024 Launch of Sounding Rocket SR-02
SRL-03 J-03 # Jun, 2024 Launch of Sounding Rocket SR-03
SRL-04 J-02 # Jul, 2024 Launch of Sounding Rocket SR-04
SRL-05 J-04 # Aug, 2024 Launch of Sounding Rocket SR-05

Orbital Launches

Past Orbital Launches

Mission Date Completion Description 1S 2S 3S NOTES:
PFF-64 2 April, 2024 15:15 64th PATHOS Foundation Fight Z-8 T-9    
PFF-65 4 April, 2024 13:05 65th PATHOS Foundation Fight Z-9 T-10    
PFF-66 7 April, 2024 15:30 66th PATHOS Foundation Fight Z-10 T-11    
PFF-67 10 April, 2024 12:30 67th PATHOS Foundation Fight Z-11 T-12    

Next Orbital Launch

Strike Out Text means that the Primary Window was Scrubbed.

CRW-08-D

The purpose of Mission Crew 8 DeOrbit is the DeOrbit and Landing of the 8th Crewed O.S.S.S. Mission.

1st Stage Booster

This flight will not utilize a First Stage Booster.

2nd Stage Booster

This flight will not utilize a Second Stage Booster.

3rd Stage Booster

This flight will utilize Third Stage Booster Epsilon-8 Completing its 1st Mission.

Primary Window

The Primary Window is on the 11th of April, 2024 between 08:00 and 21:00.

Secondary Window

This mission will not utilize a Secondary Window.

ROV-05-D

The purpose of Mission Rover 5 DeOrbit is the DeOrbit and Landing of the 5th Rover Mission (Destination Venus).

1st Stage Booster

This flight will not utilize a First Stage Booster.

2nd Stage Booster

This flight will not utilize a Second Stage Booster.

3rd Stage Booster

This flight will not utilize a Third Stage Booster.

Primary Window

The Primary Window is on the 12th of April, 2024 between 08:00 and 21:00.

Secondary Window

This mission will not utilize a Secondary Window.

PFF-68

The purpose of Mission PATHOS Foundation Flight 68 is to Launch the 68th Mission for the PATHOS Foundation. This mission will take off from Launch Complex #2 at the George A. Loak Memorial Space Center.

1st Stage Booster

This flight will utilize First Stage Booster Zeta-12 in its 7th Mission.

2nd Stage Booster

This flight will utilize Second Stage Booster Theta-13 in its 4th Mission.

3rd Stage Booster

This flight will not utilize a Third Stage Booster.

Primary Window

The Primary Window is on the 12th of April, 2024 between 08:00 and 21:00.

Secondary Window

If there is a complication for the Primary Window and it is scrubbed, the Secondary Window will be on the 13th of April, 2024 between 08:00 and 16:00.

WST-02

The purpose of Mission Weather Station Test 2 is to Test the ReEntry of the Extraplanetary Weather Stations. This mission will take off from Launch Complex #21 at Marine Air Corps Station Delta 3.

1st Stage Booster

This flight will utilize First Stage Booster Delta-13 in its 5th Mission.

2nd Stage Booster

This flight will utilize Second Stage Booster Gamma-13 in its 5th Mission.

3rd Stage Booster

This flight will not utilize a Third Stage Booster.

Primary Window

The Primary Window is on the 13th of April, 2024 between 08:00 and 21:00.

Secondary Window

This mission will not utilize a Secondary Window

Upcoming Orbital Launches

April 2024

Mission LC Primary
Window
Secondary
Window
Description 1S 2S 3S
PFF-69 #3 15 Apr, 2024 16 Apr, 2024 69th Mission for the PATHOS Foundation Z-13 T-14  
CRW-13 #4 16 Jan, 2024 17 Jan, 2024 13th Scientific Crewed Mission to Orbital
Science Space Station
D-4 G-3 E-5
PFF-70 #5 17 Apr, 2024 18 Apr, 2024 70th Mission for the PATHOS Foundation Z-14 T-15  
ISR-04
DeOrbit
  19 Apr, 2024   DeOrbit and Landing of 4th Orbital
Science Space Station
Resupply Mission
    O-4
ISR-05
DeOrbit
  19 Apr, 2024   DeOrbit and Landing of 5th Orbital
Science Space Station
Resupply Mission
    O-5
PFF-71 #6 20 Apr, 2024 21 Apr, 2024 71st Mission for the PATHOS Foundation Z-15 T-16  
ISR-06 #7 21 Apr, 2024 22 Apr, 2024 Launch and Docking of 6th Orbital Science
Space Station
Resupply Mission
D-11 G-10 O-1
ROV-06
DeOrbit
  22 Apr, 2024   DeOrbit of 6th Rover Mission (Destination Venus)      
BCF2-01 #8 23 Apr, 2024 24 Apr, 2024 1st Mission from 2nd Contract of B.R.I.T.S.A.A.A. from
Great Britain and Irelandia
Z-1 O-8  
BCF2-02 #9 26 Apr, 2024 27 Apr, 2024 2nd Mission from 2nd Contract of B.R.I.T.S.A.A.A. from
Great Britain and Irelandia
Z-2 O-9  

May 2024

Mission LC Primary
Window
Secondary
Window
Description 1S 2S 3S
PFF-72 #10 2 May, 2024 3 May, 2024 72nd PATHOS Foundation Flight Z-3 T-17  
PFF-73 #1 4 May, 2024 5 May, 2024 73rd PATHOS Foundation Flight Z-4 T-18  
PFF-74 #2 7 May, 2024 8 May, 2024 74th PATHOS Foundation Flight Z-5 T-19  
PFF-75 #3 10 May, 2024 11 May, 2024 75th PATHOS Foundation Flight Z-6 T-20  
PFF-76 #4 13 May, 2024 14 May, 2024 76th PATHOS Foundation Flight Z-7 T-1  
PFF-77 #5 16 May, 2024 17 May, 2024 77th PATHOS Foundation Flight Z-8 T-2  
ISR-07 #23 17 May, 2024 18 May, 2024 Launch and Docking of 7th Orbital Science
Space Station
Resupply Mission
D-12 G-11 O-2
BCF2-03 #6 19 May, 2024 20 May, 2024 3rd Mission from 2nd Contract of B.R.I.T.S.A.A.A. from
Great Britain and Irelandia
Z-9 O-1  
BCF2-04 #7 21 May, 2024 22 May, 2024 4th Mission from 2nd Contract of B.R.I.T.S.A.A.A. from
Great Britain and Irelandia
Z-10 O-10  
1LFB-30 #21 24 May, 2024 25 May, 2024 Mission to Launch and Dock Internet Connectivity Hub to
1st Lunar Hydroponics Farm
Z-11 O-2  
FMBB-41 #22 26 May, 2024 27 May, 2024 Mission to Launch and Dock Internet Connectivity Hub to
First Lunar Colony
Z-12 O-3  
AGL1-01 #8 28 May, 2024 29 May, 2024 1st Mission of Contract for The Arkloydis Group from Lysiennia D-5 G-4  
MBTB-01 #9 30 May, 2024 31 May, 2024 Mission to Begin Building Mars Colony Transfer Vessel Z-13 O-6  

June 2024

Mission LC Primary
Window
Secondary
Window
Description 1S 2S 3S
MBTB-02 #10 2 June, 2024 3 June, 2024 Mission to Launch 2nd Core Segment for Mars
Colony Transfer Vessel
Z-14 O-7  
MBTB-03 #1 4 June, 2024 5 June, 2024 Mission to Launch 3rd Core Segment for Mars
Colony Transfer Vessel
Z-15 O-8  
MBTB-04 #21 7 June, 2024 8 June, 2024 Mission to Launch 4th Core Segment for Mars
Colony Transfer Vessel
Z-1 O-9  
MBTB-05 #22 9 June, 2024 10 June, 2024 Mission to Launch 1st set of 4 Side Attachment Segments for
Mars Colony Transfer Vessel
D-6 G-5  
MBTB-06 #23 12 June, 2024 13 June, 2024 Mission to Launch 2nd set of 4 Side Attachment Segments for
Mars Colony Transfer Vessel
D-7 G-6  
1MCB-01 #2 14 June, 2024 15 June, 2024 Mission to Launch 1st Solar Panel Array
(w/ Atmospheric ReEntry Cover) to Mars Colony Transfer Vessel
Z-2 O-5  
PFF-78 #3 17 June, 2024 18 June, 2024 78th PATHOS Foundation Flight Z-3 T-3  
PFF-79 #4 19 June, 2024 20 June, 2024 79th PATHOS Foundation Flight Z-4 T-4  
CRW-09
DeOrbit*
  20 June, 2024   Mission to DeOrbit the 9th Scientific Crewed Mission
from the Orbital Science Space Station
    E-1
PFF-80 #5 22 June, 2024 23 June, 2024 80th PATHOS Foundation Flight Z-5 T-6  
AGL1-02 #6 25 June, 2024 26 June, 2024 2nd Mission of Contract for The Arkloydis Group from Lysiennia D-8 G-7  
AGL1-03 #7 27 June, 2024 28 June, 2024 3rd Mission of Contract for The Arkloydis Group from Lysiennia D-9 G-8  
AGL1-04 #8 29 June, 2024 30 June, 2024 4th Mission of Contract for The Arkloydis Group from Lysiennia D-10 G-9  

July 2024

Mission LC Primary
Window
Secondary
Window
Description 1S 2S 3S
PFF-81 #9 2 July, 2024 3 July, 2024 81st PATHOS Foundation Flight Z-6 T-7  
MTB-01
DeOrbit
  4 July, 2024   DeOrbit of 2nd Stage Booster from Mission Mars Orbital
Transfer Station
Build 1 (MTB-01)
  T-8  
TRA-07 #10 6 July, 2024 7 July, 2024 Mission to Launch Lander Chi-3 into Earth Orbit to Mars
Orbital Transfer Station
Z-7 O-4 C-3
TRA-08 #1 9 July, 2024 10 July, 2024 Mission to Launch Lander Chi-4 into Earth Orbit to Mars
Orbital Transfer Station
Z-8 O-10 C-4
CSF-19 #2 11 July, 2024 12 July, 2024 Launch of 20 v3 Mini Satellites into Earth Orbit
for CosmoCast Shazbotdom
U-1 P-1  
CSF-20 #3 13 July, 2024 14 July, 2024 Launch of 20 v3 Mini Satellites into Earth Orbit
for CosmoCast Shazbotdom
U-2 P-2  
1MCB-02 #4 16 July, 2024 17 July, 2024 Mission to Launch 2nd Solar Panel Array (w/ Atmospheric
ReEntry Cover)
to Mars Colony Transfer Vessel
Z-9 O-1  
1MCB-03 #21 18 July, 2024 19 July, 2024 Mission to Launch 3rd Solar Panel Array (w/ Atmospheric
ReEntry Cover)
to Mars Colony Transfer Vessel
Z-10 O-2  
CRW-10
DeOrbit*
  20 July, 2024   Mission to DeOrbit the 10th Scientific Crewed Mission
from the Orbital Science Space Station
    E-2
MTB-08 #22 21 July, 2024 22 July, 2024 Launch and Docking of 1st Temporary Engine
Segment onto Mars Orbital Transfer Station
Z-11 O-3  
ISR-06
DeOrbit*
  23 Jul, 2024   DeOrbit of 6th Space Station Supply Mission     O-1
MTB-09 #5 24 July, 2024 25 July, 2024 Launch and Docking of Cross Brace for in between
Engines onto Mars Orbital Transfer Station
Z-12 O-4  
NTC1-01 #6 27 July, 2024 28 July, 2024 1st Launch in 1st Contract for Nauanganni
Tuuni Aerospace and Underwater Association
Z-13 T-9  
MTB-10 #7 28 July, 2024 29 July, 2024 Launch and Docking of 2nd Temporary Engine
Segment onto Mars Orbital Transfer Station
Z-14 O-5  
MTB-11   31 July, 2024   Mission to Begin sending the Mars Orbital Transfer Station on
its Journey out of Earth's Orbit and towards Martian Orbit.
     

August 2024

Mission LC Primary
Window
Secondary
Window
Description 1S 2S 3S
WSL-01 #8 3 August, 2024 4 August, 2024 Mission to Launch 12 Ground Weather Stations to Mars Z-15 T-8  
1MCB-04 #9 5 August, 2024 6 August, 2024 Mission to Launch 4th Solar Panel Array (w/ Atmospheric
ReEntry Cover)
to Mars Colony Transfer Vessel
Z-1 O-6  
NTC1-02* #10 7 August, 2024 8 August, 2024 2nd Launch in 1st Contract for Nauanganni
Tuuni Aerospace and Underwater Association
Z-2 T-10  
CSF-21* TBD 9 August, 2024 10 August, 2024 Launch of 12 v3 Mini Satellites into Earth Orbit
for CosmoCast Shazbotdom
U-3 P-3  
1MCB-05* TBD 11 August, 2024 12 August, 2024 Mission to Launch 1st Battery Array (w/ Atmospheric
ReEntry Cover)
to Mars Colony Transfer Vessel
TBD TBD  
1MCB-06* TBD 14 August, 2024 15 August, 2024 Mission to Launch 2nd Battery Array (w/ Atmospheric
ReEntry Cover)
to Mars Colony Transfer Vessel
TBD TBD  
SBB-15* TBD 17 August, 2024 18 August, 2024 Mission to Launch New Housing Unit w/ Internet Connectivity Hubs to Orbital Science Space Station TBD TBD  

Contracted Launches not Slated to a Month

New Chinese Space Program 1
These Missions require Medium Lift.
Mission LC Primary
Window
Secondary
Window
Description 1S 2S 3S
NCS1-01 TBD ## Month, 2024 ## Month, 2024 1st Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-02 TBD ## Month, 2024 ## Month, 2024 2nd Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-03 TBD ## Month, 2024 ## Month, 2024 3rd Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-04 TBD ## Month, 2024 ## Month, 2024 4th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-05 TBD ## Month, 2024 ## Month, 2024 5th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-06 TBD ## Month, 2024 ## Month, 2024 6th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-07 TBD ## Month, 2024 ## Month, 2024 7th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-08 TBD ## Month, 2024 ## Month, 2024 8th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-09 TBD ## Month, 2024 ## Month, 2024 9th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-10 TBD ## Month, 2024 ## Month, 2024 10th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-11 TBD ## Month, 2024 ## Month, 2024 11th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-12 TBD ## Month, 2024 ## Month, 2024 12th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-13 TBD ## Month, 2024 ## Month, 2024 13th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-14 TBD ## Month, 2024 ## Month, 2024 14th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-15 TBD ## Month, 2024 ## Month, 2024 15th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-16 TBD ## Month, 2024 ## Month, 2024 16th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-17 TBD ## Month, 2024 ## Month, 2024 17st Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-18 TBD ## Month, 2024 ## Month, 2024 18th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-19 TBD ## Month, 2024 ## Month, 2024 19th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-20 TBD ## Month, 2024 ## Month, 2024 20th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-21 TBD ## Month, 2024 ## Month, 2024 21st Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-22 TBD ## Month, 2024 ## Month, 2024 22nd Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-23 TBD ## Month, 2024 ## Month, 2024 23rd Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-24 TBD ## Month, 2024 ## Month, 2024 24th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-25 TBD ## Month, 2024 ## Month, 2024 25th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-26 TBD ## Month, 2024 ## Month, 2024 26th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-27 TBD ## Month, 2024 ## Month, 2024 27th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-28 TBD ## Month, 2024 ## Month, 2024 28th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-29 TBD ## Month, 2024 ## Month, 2024 29th Launch in 1st Contract for New Chinese Space Program TBD TBD  
NCS1-30 TBD ## Month, 2024 ## Month, 2024 30th Launch in 1st Contract for New Chinese Space Program TBD TBD  
New Chinese Space Program 2
These Mission require Heavy Lift.
Mission LC Primary
Window
Secondary
Window
Description 1S 2S 3S
NCS2-01 TBD ## Month, 2024 ## Month, 2024 1st Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-02 TBD ## Month, 2024 ## Month, 2024 2nd Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-03 TBD ## Month, 2024 ## Month, 2024 3rd Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-04 TBD ## Month, 2024 ## Month, 2024 4th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-05 TBD ## Month, 2024 ## Month, 2024 5th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-06 TBD ## Month, 2024 ## Month, 2024 6th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-07 TBD ## Month, 2024 ## Month, 2024 7th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-08 TBD ## Month, 2024 ## Month, 2024 8th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-09 TBD ## Month, 2024 ## Month, 2024 9th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-10 TBD ## Month, 2024 ## Month, 2024 10th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-11 TBD ## Month, 2024 ## Month, 2024 11th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-12 TBD ## Month, 2024 ## Month, 2024 12th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-13 TBD ## Month, 2024 ## Month, 2024 13th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-14 TBD ## Month, 2024 ## Month, 2024 14th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-15 TBD ## Month, 2024 ## Month, 2024 15th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-16 TBD ## Month, 2024 ## Month, 2024 16th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-17 TBD ## Month, 2024 ## Month, 2024 17st Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-18 TBD ## Month, 2024 ## Month, 2024 18th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-19 TBD ## Month, 2024 ## Month, 2024 19th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-20 TBD ## Month, 2024 ## Month, 2024 20th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-21 TBD ## Month, 2024 ## Month, 2024 21st Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-22 TBD ## Month, 2024 ## Month, 2024 22nd Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-23 TBD ## Month, 2024 ## Month, 2024 23rd Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-24 TBD ## Month, 2024 ## Month, 2024 24th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-25 TBD ## Month, 2024 ## Month, 2024 25th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-26 TBD ## Month, 2024 ## Month, 2024 26th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-27 TBD ## Month, 2024 ## Month, 2024 27th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-28 TBD ## Month, 2024 ## Month, 2024 28th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-29 TBD ## Month, 2024 ## Month, 2024 29th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-30 TBD ## Month, 2024 ## Month, 2024 30th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-31 TBD ## Month, 2024 ## Month, 2024 31st Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-32 TBD ## Month, 2024 ## Month, 2024 32nd Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-33 TBD ## Month, 2024 ## Month, 2024 33rd Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-34 TBD ## Month, 2024 ## Month, 2024 34th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-35 TBD ## Month, 2024 ## Month, 2024 35th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-36 TBD ## Month, 2024 ## Month, 2024 36th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-37 TBD ## Month, 2024 ## Month, 2024 37th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-38 TBD ## Month, 2024 ## Month, 2024 38th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-39 TBD ## Month, 2024 ## Month, 2024 39th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-40 TBD ## Month, 2024 ## Month, 2024 40th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-41 TBD ## Month, 2024 ## Month, 2024 41st Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-42 TBD ## Month, 2024 ## Month, 2024 42nd Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-43 TBD ## Month, 2024 ## Month, 2024 43rd Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-44 TBD ## Month, 2024 ## Month, 2024 44th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-45 TBD ## Month, 2024 ## Month, 2024 45th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-46 TBD ## Month, 2024 ## Month, 2024 46th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-47 TBD ## Month, 2024 ## Month, 2024 47th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-48 TBD ## Month, 2024 ## Month, 2024 48th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-49 TBD ## Month, 2024 ## Month, 2024 49th Launch in 2nd Contract for New Chinese Space Program TBD TBD  
NCS2-50 TBD ## Month, 2024 ## Month, 2024 50th Launch in 2nd Contract for New Chinese Space Program TBD TBD  

Commercial Partners

Shazonian Aerodynamics

Shazonian Aerodynamics is a renowned company specializing in building rocket engines for the Shazbotdom Imperial Space Agency. With their cutting-edge technology and expertise, they have played a crucial role in propelling the Shazbotdom's space exploration missions to new heights.
The significance of Shazonian Aerodynamics can be seen in their contribution to the economy of Shazbotdom. Being the 6th largest employer in the country, they provide valuable job opportunities to a significant number of individuals. Their workforce consists of highly skilled engineers, technicians, and support staff who work tirelessly to ensure the success of their projects.
The success of Shazonian Aerodynamics can be attributed to their relentless pursuit of innovation and excellence. Their research and development department constantly pushes the boundaries of aerodynamics, striving to create more efficient and powerful rocket engines. By staying at the forefront of technological advancements, they have cemented their position as a leader in the industry.
As the primary company responsible for the maintenance of ShazAir, Shazonian Aerodynamics has established itself as a trusted partner in the aerospace industry. Their dedication to quality and safety has made them an integral part of ShazAir's operations, ensuring that the fleet remains in optimal condition.
In addition to their work with the Shazbotdom Imperial Space Agency and ShazAir, Shazonian Aerodynamics also collaborates with other international space agencies and aerospace companies. This collaboration not only enhances their expertise but also fosters the exchange of knowledge and ideas, pushing the boundaries of what is possible in the field of aerodynamics.
When it comes to safety, Shazonian Aerodynamics leaves no room for compromise. They adhere to strict safety standards and regulations, ensuring that their rocket engines and maintenance practices meet the highest level of reliability. This commitment to safety has earned them a reputation for delivering products and services that are dependable and trustworthy.

Rocket Engine Models

  Voltrai-class
Ion Engine
Kelabri-class Grego-class Bald Eagle-class Bird of Prey-class v2 Broadsword-class
Photo
Voltrai-class.png
Kelabri-class.png
Grego-class.png
BaldEagle-class Engine.png
BirdOfPreyV2-Engine.png
Broadsword-class Engine.png
Weight 0.5 Tons 0.5 Tons 6 Tons 1 Ton 10 Tons 2 Tons
Thrust 1.9 Tons 16 Tons 115 Tons 10 Tons 80 Tons 45 Tons
 
  Eagle Tres-class Eagle-class v1
Expandable Engine
Eagle-class v2 OWL-class Wizzard-class Hendra-class
Photo
EagleTres-class Engine.png
EagleV1-class Expandable Engine.png
Eaglev2-class Engine.png
OWL-Class Engine.png
Wizzard-class Engine.png
Hendra-class.png
Weight 1.15 Tons 1.5 Tons 1.1 Tons 0.5 Tons 3 Tons 2 Ton
Thrust 11 Tons 11.25 Tons 10.9 Tons 2.6 Tons 47 Tons 45 Ton
 
  Frecra-class Titan-class Bird of Prey-class v1 Dyno-class Frontier-class Phoenix-class
Photo
Frecra-class.png
Titan-Class.png
BirdOfPreyV1-class Engine.png
Dyno-class Engine.png
Frontier-clas Engine.png
Phoenix-class Engine.png
Weight 3.5 Tons 12 Tons 7 Tons 6 Tons 0.5 Tons 3.5 Tons
Thrust 140 Tons 450 Tons 230 Tons 120 Tons 99 Tons 124 Tons
 
  Raptor-class v1 Raptor-class v2 T1-class Triangulum-class
Aerospike v1.0
Triangulum-class
Aerospike v1.5
Photo
RaptorV1ClassEngine.png
RaptorV2ClassEngine.png
T1-class Engine.png
TriangulumAerospike-class Engine.png
TriangulumAerospike-class Engine.png
Weight 8 Tons 12 Tons 15 Tons 5 Tons 3 Tons
Thrust 250 Tons 450 Tons 400 Tons 185 Tons 160 Tons

Grants Metal Supply

Grants Metal Supply is a vital partner corporation for the Shazbotdom Imperial Space Administration (SISA). With their exceptional expertise in metal supply, Grants Metal Supply plays a crucial role in the success of SISA's rocket missions. As the sole supplier of metals required for all rockets, Grants Metal Supply ensures the highest quality materials are used in the construction of SISA's space vehicles.
The collaboration between Grants Metal Supply and SISA dates back to the inception of the space agency. Recognizing the importance of reliable and durable materials in rocket manufacturing, SISA sought out Grants Metal Supply as their trusted partner. Grants Metal Supply's impeccable reputation for delivering top-notch products made them an obvious choice.
One of the primary reasons SISA chose Grants Metal Supply is their extensive range of metal offerings. Grants Metal Supply provides a wide variety of metals, including aluminum, titanium, steel, and alloys specifically designed for space applications. This comprehensive selection allows SISA to select the most suitable materials for each component of their rockets, ensuring optimal performance and safety.
Furthermore, Grants Metal Supply is an organization that excels at meeting tight deadlines in addition to offering a diverse range of metals. Due to the fact that space missions often have a tight delivery schedule, it is essential for SISA to have a partner who can deliver materials on time. Grants Metal Supply's efficient supply chain management ensures that SISA receives the required metals in a timely manner, minimizing any potential delays in the rocket manufacturing process.
There is no doubt that quality control plays an important part in the aerospace industry, and Grants Metal Supply is well aware of this. They have implemented stringent quality assurance protocols to ensure that the metals they supply meet the highest industry standards. Through rigorous testing and inspection procedures, Grants Metal Supply guarantees that the materials are free from defects and possess the necessary properties for space travel.
Additionally, Grants Metal Supply recognizes the importance of environmental responsibility and sustainability. As part of the company's commitment to minimizing the impact on the environment, they actively promote the use of recycled metals. By incorporating recycled materials into their offerings, Grants Metal Supply contributes to SISA's commitment to sustainable space exploration.
Grants Metal Supply and SISA have formed a strategic partnership that extends far beyond the provision of metals. SISA's engineering teams also receive technical assistance and guidance from Grants Metal Supply as part of their technical support. As a result of their knowledge and experience in the field of material selection, the engineering teams at SISA are able to provide valuable insights on how to improve the design and performance of the rockets they build.

Space Launch Facilities

As of the current time, the Shazbotdom Imperial Space Administration has a total of 2 Orbital Launch Facilities and 1 SubOrbital Test Launch Facility. There is 1 Orbital Launch Facility under Site Development within the Imperial Colony of Alraibris.

Equipment

Space Stations

The Imperial Space Agency utilizes a variety of Orbital Stations for its operations. This includes the Orbital Science Space Station, which is set to have a lifespan of 60 years due to it's ability to be updated and have modules replaced with newer equipment, the upcoming High Orbit Transfer Station, which will be utilized in the transfer of people and equipment for the self-sustaining colonies that will be setup on Mars and Venus, and the upcomming Lunar Transfer Station, which will be utilized for the transfer of people and equipment for the self-sustaining colony on Luna.

Launch Platforms

The Imperial Space Agency utilizes a variety of Launch Platforms for its operations. This includes the Low to Mid Orbit Launch System and the Heavy Launch System. These platforms are to be utilized for launching of Satellites into orbit, the Construction and maintenance of the Space Stations, and the construction of the Lunar and Mars Colonial equipment.

Space Suits

The Shazbotdom Imperial Space Administration utilizes a total of Three (3) Space Suits for varried uses. Two of these (the Class-1 and Class-2) are currently in use while the Class-3 is awaiting it's first use for when the Colonial Posessions on Mars and Venus are established.

Solar System Colonial Posessions

The Shazbotdom Empire and Imperial Space Agency are planning on beginning the perminant colonization of the Lunar, Venus and Martian Surfaces.