Scheduled Maintenance
The wiki will be going down for routine maintenance on Friday, October 4th, 2024, at approximately 3:30 PM Central Time (15:30) or 1:30 PM Pacific Time. The site may be inaccessible during this time and the database will be locked from editing. We expect the maintenance to take about thirty minutes. We strongly encourage joining our Discord for updates.
Constantinoupoli Metro
Jump to navigation
Jump to search
This article is incomplete because it is pending further input from participants, or it is a work-in-progress by one author. Please comment on this article's talk page to share your input, comments and questions. Note: To contribute to this article, you may need to seek help from the author(s) of this page. |
Overview | |
---|---|
Native name | Μετρό Κωνσταντινούπολης |
Owner | ASK |
Locale | Constantinoupoli, Apollonia, Romaia |
Transit type | Rapid transit |
Number of lines | 9 (plus 3 under construction) |
Number of stations | 136 |
Daily ridership | 2.35 million (2018 average weekday) |
Annual ridership | 685 million (2018) |
Website | metro.con.ra |
Operation | |
Began operation | 1910 |
Operator(s) | ASK |
Technical | |
System length | 138 km (86 mi) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
Electrification | 750 V DC third rail |
The Constantinoupoli Metro (Μετρό Κωνσταντινούπολης, romanized: Metrò Konstantinùpolis) is a rapid transit system in Constantinoupoli operated by ASK. As of 2023, the system comprises nine lines. It is mostly underground, and is TBD kilometres (TBD mi) long. It has TBD stations, of which TBD have transfers between lines. There are 9 lines (with an additional three under construction), numbered 1 to 9. Lines 8 and Line 9 are automated. Lines are identified on maps by number and colour, with the direction of travel indicated by the terminus.