Shazbotdom Imperial Space Administration
Jump to navigation
Jump to search
Abbreviation | ISA |
---|---|
Formation | 17 August, 1978 |
Headquarters | Joliet, Shazbotdom |
Official language | English, Shazonite |
Administrator | Dr. Gilbert Godwin |
George A. Loak Memorial Space Center | |
Parent organisation | Ministry of the Interior, The Shazbotdom Empire |
Budget | B$575 Billion |
- The Shazbotdom Imperial Space Administration is the only space launch organization that can be found within the Shazbotdom Empire. The Administration was founded more than forty (40) years ago, and it has been an exemplar of space travel for the public sector ever since its inception. Having just entered a new golden age of space travel, the Administration is working feverishly to make sure that the Empire remains at the forefront of space exploration in this new golden age as this sector enters a new golden age of space exploration.
History
- The Imperial Space Administration has not been around as long as most other Space Programs within the world, but since its inception has strived to be at the forefront of Space Exploration and Reserach.
Launches
Past Launches
SubOrbital Launches
Mission | Date | Completion | Description | Booster | NOTES: |
---|---|---|---|---|---|
SO-29 | 3 June, 2023 | 13:15 | SubOrbital Test Flight of a Prototype Lunar Lander | Psi-1 | Undergoing Post-Launch Checks |
SO-30 | 6 September, 2023 | 15:50 | SubOrbital Test Flight of a Prototype Martian Lander | ZZ-20 | Undergoing Post-Launch Checks |
SO-31 | 10 September, 2023 | 16:30 | SubOrbital Test Flight of a Prototype Martian Lander | ZZ-21 | Undergoing Post-Launch Checks |
Orbital Launches
Mission | Date | Completion | Description | 1S | 2S | 3S | SB | NOTES: |
---|---|---|---|---|---|---|---|---|
LSSB-16 | 2 Sept, 2023 | 17:20 | Launch Outer Hallway for 2nd Dorm Complex of High Orbit Transfer Station | D-6 | G-12 | S-4 | N/A | N/A |
LSSB-17 | 5 Sept, 2023 | 14:35 | Launch 1st Segment of 2nd Dorm Complex of High Orbit Transfer Station | Z-4 | O-1 | N/A | L-4 | N/A |
LSSB-18 | 6 Sept, 2023 | 18:45 | Launch 2nd Segment of 2nd Dorm Complex of High Orbit Transfer Station | Z-5 | O-2 | N/A | L-5 | N/A |
LSSB-19 | 9 Sept, 2023 | 19:55 | Launch 3rd Segment of 2nd Dorm Complex of High Orbit Transfer Station | Z-6 | O-3 | N/A | L-6 | N/A |
LSSB-20 | 11 Sept, 2023 | 11:35 | Mission to Reorient 2nd Dorm Complex of High Orbit Transfer Station | N/A | N/A | S-2 | N/A | N/A |
LSSB-21 | 13 Sept, 2023 | 09:25 | Mission to DeOrbit 3rd Stage Booster from LSSB-01 | N/A | N/A | S-2 | N/A | N/A |
Next Launch
SubOrbital Launch
SO-32
- The purpose of SubOrbital Test Flight 32 is a SubOrbital Flight of a Prototype Martian Lander. This mission will take off from SubOrbital Pad J-03 at the SubOrbital Rocket Launch Facility.
Booster
- This flight will utilize Experimental Booster ZZ-22 in its First Mission.
Launch Window
- The Launch Window will be on the 17th of September, 2023 between 07:00 and 19:30.
Orbital Launch
LSSB-22
- The purpose of Mission Large Space Station Build 22 is to Launch and Dock Corner Hallways Segment to High Orbit Transfer Station. This mission will launch from Space Launch Complex 21 at Marine Air Corps Station Delta 3.
1st Stage Booster
- This flight will utilize First Stage Booster Delta-7 in its 5th Mission.
1st Stage Side Boosters
- This flight will not utilize First Stage Side Boosters.
2nd Stage Booster
- This flight will utilize Second Stage Booster Gamma-6 in its 4th Mission.
3rd Stage Booster
- This flight will utilize Third Stage Booster Sigma-3 in its 3rd Mission.
Primary Window
- The primary window is on the 16th of September, 2023 between 08:15 and 17:35.
Secondary Window
- If the Parimary Window is scrubbed, the Secondary Window will on the 17th of September, 2023 between 09:45 and 18:30.
Upcoming Launches
SubOrbital Launches
September - SO
Mission | Test Launch Complex |
Launch Window | Description | Booster |
---|---|---|---|---|
SO-33 | J-03 | To Be Determined | SubOrbital Test Flight of preliminary prototype of Martian Lander | ZZ-22 |
SO-34 | J-01 | To Be Determined | SubOrbital Test Flight of preliminary prototype of Martian Lander | ZZ-22 |
Orbital Launches
September
Mission | LC | Primary Window |
Secondary Window |
Description | 1S | 2S | 3S | SB |
---|---|---|---|---|---|---|---|---|
LSSB-22 | #21 | 16 September, 2023 | 17 September, 2023 | Mission to Launch and Dock Corner Hallway Section at High Orbit Transfer Station |
D-7 | G-6 | S-3 | N/A |
FMBB-29 | #3 | 19 September, 2023 | 20 September, 2023 | Mission to Launch and Dock 1st Dorm Segment to Lunar Colony |
Z-2 | O-6 | N/A | L-2 |
FMBB-30 | #1 | 22 September, 2023 | 23 September, 2023 | Mission to Launch and Dock 2nd Dorm Segment to Lunar Colony |
Z-8 | O-7 | N/A | L-8 |
FMBB-31 | #4 | 25 September, 2023 | 26 September, 2023 | Mission to Launch and Dock 3rd Solar Panel Array to Lunar Colony |
Z-9 | O-10 | N/A | L-9 |
PFF-55 | #7 | 27 September, 2023 | 28 September, 2023 | 55th PATHOS Foundation Flight | Z-10 | T-17 | N/A | L-10 |
October
Mission | LC | Primary Window |
Secondary Window |
Description | 1S | 2S | 3S | SB |
---|---|---|---|---|---|---|---|---|
FMBB-32 | #2 | 1 October, 2023 | 2 October, 2023 | Mission to Launch and Dock 3rd Battery Segment to unar Colony |
Z-11 | O-5 | N/A | L-11 |
TRA-01 | #1 | 4 October, 2023 | 5 October, 2023 | Mission to Launch and Dock Lunar Lander Psi-1 to Lunar Orbital Transfer Station |
Z-12 | O-8 | N/A | L-12 |
ROV-02 DeOrbit |
7 October, 2023 | DeOrbit and Landing of 2nd Rover Mission to Mars | N/A | N/A | N/A | N/A | ||
CRW-08 | #4 | 9 October, 2023 | 10 October, 2023 | 8th Scientific Crewed Mission to Orbital Science Space Station |
D-6 | G-7 | N/A | N/A |
ROV-03 | #3 | 12 October, 2023 | 13 October, 2023 | Launch of 3rd Rover Mission - Ganymede | Z-15 | R-1 | N/A | L-15 |
ROV-04 | #7 | 13 October, 2023 | 14 October, 2023 | Launch of 4th Rover Mission - Europa | Z-14 | R-2 | N/A | L-14 |
TRA-02 | #5 | 16 October, 2023 | 17 October, 2023 | Mission to Launch and Dock Lunar Lander Psi-2 to Lunar Orbital Transfer Station |
Z-13 | O-4 | N/A | L-13 |
CRW-04 DeOrbit |
19 October, 2023 | DeOrbit and Landing of 4th Crewed Mission from the Orbital Science Space Station |
N/A | N/A | N/A | N/A | ||
FMBB-33 | #6 | 22 October, 2023 | 23 October, 2023 | Mission to Launch and Dock 4th Solar Pannel Array to Lunar Colony |
Z-3 | O-6 | N/A | L-3 |
FMBB-34 | #21 | 23 October, 2023 | 24 October, 2023 | Mission to Launch and Dock 4th Battery Array to Lunar Colony |
Z-4 | O-9 | N/A | L-4 |
COL-01 | #8 | 26 October, 2023 | 27 October, 2023 | Mission to Launch The First Colonists to the Lunar Colony |
Z-7 | K-3 | N/A | L-7 |
FMBB-35 | #10 | 28 October, 2023 | 29 October, 2023 | Mission to Launch and Dock 3rd Dorm Segment to Lunar Colony |
Z-11 | O-10 | N/A | L-11 |
FMBB-36 | #9 | 30 October, 2023 | 31 October, 2023 | Mission to Launch and Dock 4th Dorm Segment to Lunar Colony |
Z-1 | O-2 | N/A | L-1 |
November
Mission | LC | Primary Window |
Secondary Window |
Description | 1S | 2S | 3S | SB |
---|---|---|---|---|---|---|---|---|
COL-01 DeOrbit |
8 Nov, 2023 | DeOrbit of 2nd Stage Booster for COL-01 | N/A | K-3 | N/A | N/A | ||
ROV-05 | #5 | 9 Nov, 2023 | 10 Nov, 2023 | 5th Rover Mission - Venus | Z-9 | O-1 | N/A | L-9 |
ROV-06 | #2 | 12 Nov, 2023 | 13 Nov, 2023 | 6th Rover Mission - Venus | Z-10 | O-3 | N/A | L-10 |
TRA-03 | # | 15 Nov, 2023 | 16 Nov, 2023 | Mission to Launch and Dock Lunar Lander Psi-3 to L.O.T.S. | Z-8 | O-4 | P-3 | L-8 |
TRA-04 | # | 18 Nov, 2023 | 19 Nov, 2023 | Mission to Launch and Dock Lunar Lander Psi-4 to L.O.T.S. | Z-2 | O-5 | P-4 | L-2 |
PFF-56 | # | 20 Nov, 2023 | 21 Nov, 2023 | 56th PATHOS Foundation Flight | Z-5 | T-18 | N/A | L-5 |
PFF-57 | # | 22 Nov, 2023 | 23 Nov, 2023 | 57th PATHOS Foundation Flight | Z-3 | T-19 | N/A | L-3 |
PFF-58 | # | 24 Nov, 2023 | 25 Nov, 2023 | 58th PATHOS Foundation Flight | Z-6 | T-20 | N/A | L-6 |
PFF-59 | # | 26 Nov, 2023 | 27 Nov, 2023 | 57th PATHOS Foundation Flight | Z-12 | T-1 | N/A | L-12 |
PFF-60 | # | 28 Nov, 2023 | 29 Nov, 2023 | 60th PATHOS Foundation Flight | Z-13 | T-2 | N/A | L-13 |
PFF-61 | # | 29 Nov, 2023 | 30 Nov, 2023 | 61st PATHOS Foundation Flight | Z-14 | T-3 | N/A | L-14 |
December
Mission | LC | Primary Window |
Secondary Window |
Description | 1S | 2S | 3S | SB |
---|---|---|---|---|---|---|---|---|
SPL-01 | # | 1 Nov, 2023 | 2 Nov, 2023 | 1st Solar Probe Launch | Z-15 | T-4 | N/A | L-15 |
PFF-62 | # | 4 Nov, 2023 | 5 Nov, 2023 | 62nd PATHOS Foundation Flight | Z-1 | T-5 | N/A | L-1 |
PFF-63 | # | 7 Nov, 2023 | 8 Nov, 2023 | 63rd PATHOS Foundation Flight | Z-7 | T-6 | N/A | L-7 |
Commercial Partners
Shazonian Aerodynamics
- The main supplier and builder of the Rocket Engines utilized in all Imperial Space Administration rockets, including the new Delta and Gamma lines of rockets. Shazonian Aerodynamics used to build aircraft for various small-time airlines within the Empire until those went belly-up with the formation of ShazAir and it's subsidiary. They hold the main contract to SISA for building Rocket Engines, but also hold the contract for ShazAir for maintenance of their aircraft, making them the 6th Largest Employer within the Empire.
Rocket Engine Models
Grants Metal Supply
- Originally selected to supply the metals and alloys for the Shuttle program, the contract was renewed in the late 2010s for the first reusable rockets. SISA is their sole contract for their business and they offer top quality metals that have not failed.
Space Launch Facilities
- As of the current time, the Shazbotdom Imperial Space Administration has a total of 2 Orbital Launch Facilities and 1 SubOrbital Test Launch Facility. There is 1 Orbital Launch Facility under Site Planning within the Imperial Colony of Alraibris.
Equipment
Space Stations
- The Imperial Space Agency utilizes a variety of Orbital Stations for its operations. This includes the Orbital Science Space Station, which is set to have a lifespan of 60 years due to it's ability to be updated and have modules replaced with newer equipment, the upcoming High Orbit Transfer Station, which will be utilized in the transfer of people and equipment for the self-sustaining colonies that will be setup on Mars and Venus, and the upcomming Lunar Transfer Station, which will be utilized for the transfer of people and equipment for the self-sustaining colony on Luna.
Launch Platforms
- The Imperial Space Agency utilizes a variety of Launch Platforms for its operations. This includes the Low to Mid Orbit Launch System and the Heavy Launch System. These platforms are to be utilized for launching of Satellites into orbit, the Construction and maintenance of the Space Stations, and the construction of the Lunar and Mars Colonial equipment.
Space Suits
- The Shazbotdom Imperial Space Administration utilizes a total of Three (3) Space Suits for varried uses. Two of these (the Class-1 and Class-2) are currently in use while the Class-3 is awaiting it's first use for when the Colonial Posessions on Mars and Venus are established.
Solar System Colonial Posessions
- The Shazbotdom Empire and Imperial Space Agency are planning on beginning the perminant colonization of the Lunar, Venus and Martian Surfaces.