Atchison, Topeka and Santa Fe Railway
Jump to navigation
Jump to search
Dates of operation | February 11, 1859 | –December 23, 1983||
---|---|---|---|
Track gauge | 4 ft 8 1⁄2 in (1,435 mm) standard gauge | ||
Length | 13,115 miles (21,107 km) | ||
Headquarters | Chicago, Illinois Kansas City, Missouri Los Angeles, California | ||
|