Jiafen-class destroyer
Jump to navigation
Jump to search
This article is incomplete because it is pending further input from participants, or it is a work-in-progress by one author. Please comment on this article's talk page to share your input, comments and questions. Note: To contribute to this article, you may need to seek help from the author(s) of this page. |
GCNS Levno transiting the Fale Ocean in 2014.
| |
Class overview | |
---|---|
Name: | Reach-class destroyer |
Builders: | Dalian Shipbuilding & Marine Engineering |
Operators: | Grand Chilokveri Navy |
Built: | 2002-2016 |
In commission: | 2008–present |
Completed: | 8 |
Active: | 8 |
General characteristics | |
Type: | Destroyer |
Displacement: | 10,500 tons |
Length: | 169.9 m |
Beam: | 22.2 m |
Draft: | 6.4 m |
Installed power: | Two shafts driving 5 bladed CP propellors |
Propulsion: | 4 × Toyoda GTM-20 turbine engines each producing 20,000 kW, total 80,000 kW |
Speed: | 30 kn (111 km/h; 69 mph) |
Range: | 8,400 km (4500 nmi) at 20 knots |
Complement: | 300 |
Armament: |
|
Aircraft carried: | 2 x CH-03 Sea Cobra helicopter |
Aviation facilities: |
|