User:Montecara/Sandbox/Aurean Tunnels

Jump to navigation Jump to search
Aurean Tunnel
Overview
Coordinates28°32′4.9″N 6°21′37.6″E
CrossesWestern Aurean Strait
Operation
OperatorTrenalia
Technical
Length6,882 metres (4.276 mi)
Track gauge1,500 mm (4 ft 11 116 in)
Electrified25 kV / 50 Hz AC overhead lines