File:Stwlan.dam.jpg
Jump to navigation
Jump to search
Stwlan.dam.jpg (750 × 483 pixels, file size: 110 KB, MIME type: image/jpeg)
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 14:00, 13 August 2005 | 750 × 483 (110 KB) | wikimediacommons>Hellisp | The upper reservoir (Llyn Stwlan) and dam of the Ffestiniog Pumped Storage Scheme in north Wales. The four water turbines at the power station can generate 360 MW of electricity within 60 seconds of the need arising.<br> Taken by Adrian Pingstone in 1988 |
File usage
There are no pages that use this file.