Lüderitz Class Carrier: Difference between revisions

Jump to navigation Jump to search
(added category)
No edit summary
 
(3 intermediate revisions by the same user not shown)
Line 9: Line 9:
| Builders= [[Germaniawerft|Germaniawerft Schiffbau]]
| Builders= [[Germaniawerft|Germaniawerft Schiffbau]]
| Operators= {{navy|Engleberg}}
| Operators= {{navy|Engleberg}}
| Class before= [[Kaiserreich Class Carrier|Kaiserreich Class]]
| Class before= [[Schildhauer Class Carrier|Schildhauer Class]]
| Class after= [[Graf von Kluge Class Carrier|Graf von Kluge Class]]
| Class after= [[Fuerst Faulstich Class Carrier|''Fürst Faulstich'' Class]]
| Subclasses=
| Subclasses=
| Built range= 1980-2005
| Built range= 1980-2005
Line 52: Line 52:
|}
|}


The ''Lüderitz'' class is a set of nuclear-powered aircraft carriers currently in service in the [[Kaiserliche-Marine]]. These three carriers make up the primary force-projection capabilities of the Kaiserliche-Marine, succeeding the [[Kaiserreich Class Carrier|Kaiserreich class]] that was retired in 2003. These vessels were planned as carriers that would cost less than the ''Kaiserreich'' class, and were planned over the years of 1968-1978 until the first carrier was ordered in early 1980. In the 21st Century, these ships serve as the pillar of carrier design in Corentia and are expected to be in service until the completion of the SMS ''Graf von Kluge'' in 2025-2030.  
The ''Lüderitz'' class is a set of nuclear-powered aircraft carriers currently in service in the [[Kaiserliche-Marine]]. These three carriers make up the primary force-projection capabilities of the Kaiserliche-Marine, succeeding the [[Kaiserreich Class Carrier|Kaiserreich class]] that was retired in 2003. These vessels were planned as carriers that would cost less than the ''Kaiserreich'' class, and were planned over the years of 1968-1978 until the first carrier was ordered in early 1980. In the 21st Century, these ships serve as the pillar of carrier design in Corentia and are expected to be in service until the completion of the SMS ''Fürst Faulstich'' in 2025-2030.  


__TOC__ {{TOC right}}
__TOC__ {{TOC right}}


==Development==
==Development==
==Design and Construction==
==Service==
==Planned Replacement==




Line 69: Line 75:
|-
|-
| FZTN-01 || [[SMS Lüderitz|''Lüderitz'']] || 15 June 1980 || 9 December 1984 || 23 April 1989 || [[Wilhelmshafen]]
| FZTN-01 || [[SMS Lüderitz|''Lüderitz'']] || 15 June 1980 || 9 December 1984 || 23 April 1989 || [[Wilhelmshafen]]
|-
| FZTN-02 || [[SMS von Donnersmarck|''von Donnersmarck'']] || 4 July 1992 || 30 August 1995 || 18 April 1997 || [[Kreil]]
|-
|-
| FZTN-03 || [[SMS Greißler|''Greißler'']] || 30 January 1998 || 30 August 2003 || 9 November 2005 || [[Seenemünde]]   
| FZTN-03 || [[SMS Greißler|''Greißler'']] || 30 January 1998 || 30 August 2003 || 9 November 2005 || [[Seenemünde]]   

Latest revision as of 18:29, 5 September 2019

Charles De Gaulle nuclear-powered aircraft carrier
SMS Lüderitz in 2011
Class overview
Builders: Germaniawerft Schiffbau
Operators:  Kaiserliche-Marine
Preceded by: Schildhauer Class
Succeeded by: Fürst Faulstich Class
Built: 1980-2005
In commission: 1989-present
Planned: 3
Completed: 3
Active: 3
Retired: 0
General characteristics
Type: Nuclear Carrier
Displacement: 42,500 tons full load
Length: 271 m (889 ft)
Beam: 67 m (220 ft)
Draught: 10 m (33 ft)
Propulsion: 2 x Schönberg FZ8S(e) Nuclear Reactors
Speed: 27 knots (50 km/h; 31 mph)
Complement: 1,350
Armament:
Aircraft carried: 40-49 Aircraft
Notes: SMS von Donnersmarck converted to gas-turbine engines during construction.

The Lüderitz class is a set of nuclear-powered aircraft carriers currently in service in the Kaiserliche-Marine. These three carriers make up the primary force-projection capabilities of the Kaiserliche-Marine, succeeding the Kaiserreich class that was retired in 2003. These vessels were planned as carriers that would cost less than the Kaiserreich class, and were planned over the years of 1968-1978 until the first carrier was ordered in early 1980. In the 21st Century, these ships serve as the pillar of carrier design in Corentia and are expected to be in service until the completion of the SMS Fürst Faulstich in 2025-2030.

Development

Design and Construction

Service

Planned Replacement

Ships of the class

Pennant no. Name Laid down Launched Commissioned Homeport
FZTN-01 Lüderitz 15 June 1980 9 December 1984 23 April 1989 Wilhelmshafen
FZTN-03 Greißler 30 January 1998 30 August 2003 9 November 2005 Seenemünde