This is an Astyrian Featured Article.
This article belongs to the lore of Astyria.

SNR: Difference between revisions

Jump to navigation Jump to search
No edit summary
Line 1: Line 1:
{{wip}}
{{Astyrian Featured Article}}{{Region_icon_Astyria}}
{{Astyrian Featured Article}}{{Region_icon_Astyria}}
{{Infobox rail
{{Infobox rail

Revision as of 04:04, 18 December 2021

Suurnopeusrauta
SNRlogo.png
THSR TR15 at Taichung Station 20070709.jpg
LocaleValkea, with services extending to Ostrothia, Nynorsk Ostlijord, and Caledonia
Dates of operation1986–present
Track gauge1,435 mm (Standard gauge)

Suurnopeusrauta (SNR; Valkean, "high-speed rail") is Valkea's intercity high-speed rail service. It is operated by the state-owned Valkean Railways Group, and regularly operates at speeds between 250 and 330 km/h. The SNR network currently carries 90 million passengers every year.

Plans for a high-speed rail network began as early as 1970, with proposals being submitted to the Valkean government. However, funding for the project was delayed due to the collapse of the Kansallist regime in 1975, but eventually Valkean National Railways (VNR) was granted funding from Paavo Itkonen's administration in 1978. In 1980, VNR ordered 70 high-speed trains from VTK, and the first line was inaugurated in 1986, connecting the cities of Våren Livet and Novika. Since then, it has expanded to connect major cities throughout Valkea.

The SNR network extends to surrounding countries, with lines connecting it with Ostrothia, Nynorsk Ostlijord, and Caledonia. Several future lines are planned, including a new coastal corridor between Dagsmark and Brantevik, as well as spur lines to link the Central and Eastern corridors.

History

Development

Valkea was experiencing a rapid growth in infrastructure during the 1960s, mainly through the expansion of air travel and the Valkean highway network. At the time, the Valkean government was looking to revitalize its rail infrastructure, which had been in a state of disrepair since the 1940s. Valkean National Railways was tasked with studying the viability of a rail network that would connect Valkea's major cities, along with the kind of trains that would operate on it.

Initially, the plan was to construct a passenger and freight line between Dagsmark, Våren Livet, and Novika that used diesel-electric locomotives with a top speed of 200 km/h (120 mph). However, with growing evidence of the feasability of high-speed rail, it was decided that the new line will have a high-speed train of their own, featuring electric-powered trains that can travel at much greater speeds. VNR submitted these plans in 1970 to the Ministry of Transportation.

At first there was some resistance from government officials, but eventually VNR was able to gain support, with funding slated for 1975. This was delayed due to the Kansallist Party's collapse that same year. VNR resubmitted their proposal to the new government in 1976, and it was finally granted funding in 1978.

Construction of the Våren Livet-Novika line began in March 1979. The project was called Uusirautahanke (New Rail Line Project). Alongside construction, VNR ordered 30 high-speed trains from Valkean Industrial Consortium (VTK) in June 1980. Over the next few years, VTK built the first prototype in 1981, clocking over 1,000,000 km in testing. The first production train, designated the SNR-1, was delivered to VNR on 7 August 1985.

Service

The SNR was inaugurated on 26 May 1986, connecting the cities of Våren Livet and Novika. This made it one of Astyria's earliest commercial high-speed trains to enter service. To promote the new rail network, VNR launched a major publicity campaign promoting its speed, comfort, frequency, practicality, and accessibility. The trains instantly became popular with the Valkean public, proving to be considerably faster than competing forms of transport such as conventional trains, cars, and airplanes. Trains on the Våren Livet-Novika Line reached speeds of up to 275 km/h (171 mph), a number that would increase over the years with newer models.

The network's success brought about plans to expand the network to other cities in Valkea. However, VNR began to run into financial troubles as costs spiralled out of control. The company declared bankruptcy in 1994 and was restructured as Valkean Railways Group in 1995.

In 2005, a modified SNR train achieved a top speed of 568.249 km/h (353.094 mph) on the Våren Livet-Mustakivi line, making it the fastest conventional train in Astyria.

Future

A high-speed maglev train called the SNR-M1 is in development. Valkean Railways Group is planning to use the new train on the Våren Livet-Dagsmark New Line, which is currently under construction. It set the record on 3 September 2017 for the fastest unconventional train, reaching a top speed of 602.184 km/h (374.180 mph).

Trains

These are the current series of high-speed trains running on the SNR network:

  • SNR-1 - entered service in 1986, withdrawn in 2013
  • SNR-2 - entered service in 1993, withdrawn in 2017
  • SNR-D1 - entered service in 1995, features bi-level carriages
  • SNR-3 - entered service in 1999
  • SNR-D2 - entered service in 2000, features bi-level carriages
  • SNR-4 - entered service in 2007
  • SNR-5 - entered service in 2015

Network

Current map of the SNR network

The SNR Network is comprised ten main lines and four spur lines. These lines are grouped into seven corridors radiating from Våren Livet.

Line Route description Opened Top speed
Northwestern Corridor
SNR Novika-Pikkala
  • Novika
  • Kovanen
  • Maarinnat
2010 300 km/h (186 mph)
  • Maarinnat
  • Isokorpi
  • Andelmaa
  • Niemisjoki
  • Pikkala
2014 250 km/h (155 mph)
Northern Corridor
SNR Novika-Orrenkylä
  • Novika
  • Muittari
  • Harjattula
  • Suotalo
  • Orrenkylä
2003 300 km/h (186 mph)
SNR Novika-Tuorlahti
  • Novika
  • Muittari
  • Harjattula
2009 300 km/h (186 mph)
  • Harjattula
  • Sammaljoki
  • Karhi
  • Tuorlahti
2015 250 km/h (155 mph)
Northeastern Corridor
SNR Novika-Tuuri
  • Novika
  • Paasola
  • Kaunisto
2000 300 km/h (186 mph)
  • Kaunisto
  • Orivesi
  • Kokousaali
  • Tuuri
2005
SNR Tuuri-Raudur
  • Tuuri
  • Raudur*
2015 300 km/h (186 mph)
Central Corridor
SNR Våren Livet-Novika
1986 275 km/h (171 mph)
1986 330 km/h (205 mph)
SNR Våren Livet-Siippoo
  • Våren Livet
  • Hintta
  • Siippoo
2001 330 km/h (205 mph)
Eastern Corridor
SNR Våren Livet-Leposija
  • Våren Livet
  • Barö
  • Kukaskyla
  • Mustakivi
1998 330 km/h (205 mph)
  • Mustakivi
  • Kurvinen
  • Leposija
2007
SNR Våren Livet-Pederså
  • Våren Livet
  • Barö
  • Kukaskyla
  • Mustakivi
1999 330 km/h (205 mph)
  • Mustakivi
  • Kuutsalo
  • Pederså
2013 300 km/h (186 mph)
SNR Våren Livet-Hopsu
  • Våren Livet
  • Hopsu
2018 275 km/h (171 mph)
Southern Corridor
SNR Våren Livet-Osterlund
  • Våren Livet
  • Sorvisto
  • Utraslahti
  • Ervasti
  • Osterlund
2001 300 km/h (186 mph)
SNR Osterlund-Dunaroch
  • Osterlund
  • Dunaroch*
2015 300 km/h (186 mph)
SNR Våren Livet-Brantevik
  • Våren Livet
  • Sorvisto
  • Utraslahti
  • Ervasti
2001 300 km/h (186 mph)
  • Ervasti
  • Helgeboda
  • Raatti
  • Skeppsholm
  • Brantevik
2006
SNR Brantevik-Haku
  • Brantevik
  • Malmby
  • Haku*
2007 300 km/h (186 mph)
Southwestern Corridor
SNR Våren Livet-Dagsmark
  • Våren Livet
  • Sorvisto
  • Utraslahti
  • Ervasti
1996 300 km/h (186 mph)
  • Ervasti
  • Pokela
  • Korsholm
  • Limapaa
  • Solhelm
  • Tuuvalo
2004
  • Tuuvalo
  • Vintala
  • Karvio
  • Kalkstrand
  • Paloinen
  • Dagsmark
2001
SNR Våren Livet-Sontu
  • Våren Livet
  • Sorvisto
  • Utraslahti
  • Ervasti
2001 300 km/h (186 mph)
  • Ervasti
  • Pokela
  • Korsholm
2004
  • Korsholm
  • Onkamo
  • Kiesimä
  • Sontu
2011
*station accessed through a cross-border connection.

Lines under construction

The following lines are under construction.

  • Coastal Corridor from Dagsmark to Brantevik via Hedlund. Construction began in 2014 and is scheduled to open in late 2022. In addition, a connection will be built to link the Våren Livet-Sontu line to the new corridor.
  • A spur line is currently being constructed between Kursalo and Hintta, which will be opened in late 2022.
  • Northwestern Corridor extension from Pikkala to Vaivio, scheduled to open in 2023.
  • A maglev line connecting Dagsmark, Våren Livet, and Novika is planned. The Dagsmark-Våren Livet segment is scheduled to be completed in 2028 while the Våren Livet-Novika segment will have a target date of 2034.