U1 (Newstead Underground): Difference between revisions

Jump to navigation Jump to search
(Created page with "{{wip}} {{Infobox rail line | name = U1 | color = CE1628 | logo = | logo_width = | logo_alt = | image = File:U-Bahnhof Stadthaus 04.jpg | imag...")
 
mNo edit summary
 
(3 intermediate revisions by the same user not shown)
Line 13: Line 13:
| system      = [[Newstead Underground]]
| system      = [[Newstead Underground]]
| status      = Operational
| status      = Operational
| locale      =  
| locale      = [[Newstead]]
| start      = Spandaw S
| start      = Spandaw S
| end        = Teltaw S
| end        = Teltaw S
Line 32: Line 32:
| elevation  =  
| elevation  =  
| website    =
| website    =
| map        = {{U1 (Newstead Underground)}}
| map        =
| map_state   = collapsed
{{Routemap
|title= Newstead Underground Line U1
|map =
tKS+BHFa~~ ~~Spandaw
tBHF~~ ~~Towerplat
tBHF~~ ~~Aldenspandaw Centrum
tBHF~~ ~~Breade Strate
tBHF~~ ~~Markstrate
tBHF~~ ~~Newet Feld
tS+BHF~~ ~~Steanfeld
tBHF~~ ~~Buskstrate
tS+BHF~~ ~~Langenfeld
tBHF~~ ~~Yunge Strate
tBHF~~ ~~Willemsplat
tBHF~~ ~~Lange Strate
tBHF~~ ~~Raadshous
tBHF~~ ~~Amteshous
tS+BHF~~ ~~Centralstatië
BHF!~PORTALg~~ ~~Lieþbrigge
hKRZWae~~ ~~ ~~[[wikipedia:River|River Leith]]
BHF!~PORTALf~~ ~~Lieþ
tBHF~~ ~~Oststrate
tS+BHF~~ ~~Universitÿt
tBHF~~ ~~ ~~Zoologisker Garden <small>(closed)</small>
BHF!~PORTALg~~ ~~Botanisker Garden
BHF!~PORTALf~~ ~~Yoost-Þingsbuy-Strate
tBHF~~ ~~Rÿkshall Market
tBHF~~ ~~Þurchstrate
tBHF~~ ~~Husstrate
tS+BHF~~ ~~Rÿkshall
tBHF~~ ~~Þornstrate
tBHF~~ ~~Teltaw Kerke
tBHF~~ ~~Aldenteltaw
tBHF~~ ~~Frontstrate
tKS+BHFe~~ ~~Teltaw
|map_state = collapsed
}}<noinclude>
}}
}}


The '''U1''' is an [[wikipedia:Rapid transit|rail rapid transit]] [[wikipedia:Transit line|line]] of the [[Newstead Underground|underground system]] in [[Newstead]]. The line is 22.6 km long and has 30 stations. It runs from Spandaw through the city centre to Teltaw, crossing the city from west to east.
The '''U1''' is an [[wikipedia:Rapid transit|rail rapid transit]] [[wikipedia:Transit line|line]] of the [[Newstead Underground|underground system]] in [[Newstead]]. The line is 22.6 km long and has 30 stations. It runs from Spandaw through the city centre to Teltaw, crossing the city from west to east. The U1 is the oldest line of the network, first opening for some public tests in June 1948 before beginning regular passenger service as line A on 3 December 1949. The line is known by its present name since 1960.
 
Between ''Raadshous'' and ''Universitÿt'', it runs alongside the [[U3 (Newstead Underground)|U3]]. It crosses the [[U2 (Newstead Underground)|U2]] at ''Centralstatië'' and ''Universitÿt'', and the [[U4 (Newstead Underground)|U4]] at ''Centralstatië''.
 
==History==
 
A line crossing the city centre from northeast to northwest was included in some of the very first plans for an underground railway in Newstead in the 1900s. In 1940, one of the lines that was planned went from ''Willemsplat'' to the northwest of the city centre to ''Þurchstrate'' in Rÿkshall (Rixhall), with later plans extending this line to the new developments in Spandaw in the west and in Teltaw in the east. A section from ''Willemsplat'' to ''Zoologisker Garden'' was chosen as the first section to be built, with construction starting in 1942 and being mostly finished by the spring of 1948. On 11 June 1948, the first train ran from ''Willemsplat'', carrying the mayor of Newstead alongside some journalists, with limited passenger service starting on the section the next day. However, it took until 3 December 1949 for regular passenger service to begin. By 1958, line A had reached its present termini on both ends.
 
==Stations==
 
The U1 has 30 stations.
 
==Operation==
 
As most of the Underground, the U1 has 24/7 operation. However, the capacity is lower off-peak due to changes in [[wikipedia:Headway|headways]] and train length.
 
Between 00:30 and 04:30, trains operate every 30 minutes. Mondays to Saturdays, trains operate every 10 minutes from 04:30 to 06:00, followed by operations every 5 minutes from 06:00 to 19:00. On weekends, the 10 minute headways instead last until 08:00. Between 19:00 and 22:30, trains operate every 10 minutes and between 22:30 and 00:30, they operate every 15 minutes. As it operates alongside the U3 between ''Raadshous'' and ''Universitÿt'', the frequency is effectively doubled on this section of the line.
 
The U1 has small depots at both ends of the line, though it is primarily served by the depots A (Zoo) and B (Central).


[[Category:Borland (Kylaris)]]
[[Category:Borland (Kylaris)]]
[[Category:Transport in Borland (Kylaris)]]
[[Category:Transport in Borland (Kylaris)]]

Latest revision as of 11:12, 24 October 2022

U1
U-Bahnhof Stadthaus 04.jpg
U1 train at Aldenspandaw Centrum
Overview
TypeRapid transit
SystemNewstead Underground
StatusOperational
LocaleNewstead
TerminiSpandaw S
Teltaw S
Stations30
Operation
Opened3 December 1949 (1949-12-03)
Operator(s)Newstead City Transit (NST)
Technical
Line length22.6 km (14.0 mi)
Track gauge1,500 mm (4.9 ft)
standard gauge
Electrification750 V DC overhead wire
Operating speedup to 100 km/h
Route map
Newstead Underground Line U1
Spandaw
Towerplat
Aldenspandaw Centrum
Breade Strate
Markstrate
Newet Feld
Steanfeld
Buskstrate
Langenfeld
Yunge Strate
Willemsplat
Lange Strate
Raadshous
Amteshous
Centralstatië
Lieþbrigge
Lieþ
Oststrate
Universitÿt
Zoologisker Garden (closed)
Botanisker Garden
Yoost-Þingsbuy-Strate
Rÿkshall Market
Þurchstrate
Husstrate
Rÿkshall
Þornstrate
Teltaw Kerke
Aldenteltaw
Frontstrate
Teltaw

The U1 is an rail rapid transit line of the underground system in Newstead. The line is 22.6 km long and has 30 stations. It runs from Spandaw through the city centre to Teltaw, crossing the city from west to east. The U1 is the oldest line of the network, first opening for some public tests in June 1948 before beginning regular passenger service as line A on 3 December 1949. The line is known by its present name since 1960.

Between Raadshous and Universitÿt, it runs alongside the U3. It crosses the U2 at Centralstatië and Universitÿt, and the U4 at Centralstatië.

History

A line crossing the city centre from northeast to northwest was included in some of the very first plans for an underground railway in Newstead in the 1900s. In 1940, one of the lines that was planned went from Willemsplat to the northwest of the city centre to Þurchstrate in Rÿkshall (Rixhall), with later plans extending this line to the new developments in Spandaw in the west and in Teltaw in the east. A section from Willemsplat to Zoologisker Garden was chosen as the first section to be built, with construction starting in 1942 and being mostly finished by the spring of 1948. On 11 June 1948, the first train ran from Willemsplat, carrying the mayor of Newstead alongside some journalists, with limited passenger service starting on the section the next day. However, it took until 3 December 1949 for regular passenger service to begin. By 1958, line A had reached its present termini on both ends.

Stations

The U1 has 30 stations.

Operation

As most of the Underground, the U1 has 24/7 operation. However, the capacity is lower off-peak due to changes in headways and train length.

Between 00:30 and 04:30, trains operate every 30 minutes. Mondays to Saturdays, trains operate every 10 minutes from 04:30 to 06:00, followed by operations every 5 minutes from 06:00 to 19:00. On weekends, the 10 minute headways instead last until 08:00. Between 19:00 and 22:30, trains operate every 10 minutes and between 22:30 and 00:30, they operate every 15 minutes. As it operates alongside the U3 between Raadshous and Universitÿt, the frequency is effectively doubled on this section of the line.

The U1 has small depots at both ends of the line, though it is primarily served by the depots A (Zoo) and B (Central).