SSV 011-class submarine: Difference between revisions
(Created page) |
(Updated) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{|{{Infobox ship begin}} | {|{{Infobox ship begin}} | ||
{{Infobox ship image | {{Infobox ship image | ||
| Ship image= | | Ship image= Hakuryu-130412-N-LS794-166.jpg | ||
| Ship caption= SSV | | Ship caption= SSV 013 in 2016 | ||
}} | }} | ||
{{Infobox ship class overview | {{Infobox ship class overview | ||
| Builders= *[[Kachi Shipyards]] | | Builders= *[[Kachi Shipyards]] | ||
*[[Tao United Shipbuilding Corporation]] | *[[Tao United Shipbuilding Corporation]] | ||
| Operators= {{navy|UST}} | | Operators= *{{navy|UST}} | ||
*{{navy|Taoist Empire}} | |||
| Class before= [[SSV 001-class submarine|SSV 001-class]] | | Class before= [[SSV 001-class submarine|SSV 001-class]] | ||
| Class after= [[SSV 025-class submarine|SSV 025-class]] (planned) | | Class after= [[SSV 025-class submarine|SSV 025-class]] (planned) | ||
| Subclasses= | | Subclasses= | ||
| Built range= 2003–2010 | | Built range= 2003–2010 | ||
| In commission range= | | In commission range= 2007-present | ||
| Total ships building= | | Total ships building= | ||
| Total ships planned= 10 | | Total ships planned= 10 | ||
Line 53: | Line 53: | ||
| Ship notes= | | Ship notes= | ||
}} | }} | ||
|} | |||
The '''''SSV 011''-class submarine''' is a class of {{wp|attack submarine}}s constructed for the [[UST Navy|United States of the Tao Navy]] (USTN), and operated by the [[Imperial Taoist Navy]] (ITN) . It is one of two {{wp|attack submarine}} classes in active service with the [[Imperial Taoist Navy|ITN]]. It was originally conceived of in the 1983 "next-gen" fleet plan. | |||
__TOC__ {{TOC right}} | |||
==Development== | |||
The SSV 011 class {{wp|submarine}}s were originally envisioned in the 1983 "next-gen" fleet project. By 1985 the plan had been ready for implementation and called for at least two new classes of conventionally powered {{wp|attack submarine}}s (SSV 001 and SSV 011). While the plan considered a class of {{wp|nuclear submarine|nuclear attack submarines}} the [[UST Navy|USTN]] was too split on whether or not it was a good use of resources, especially considering how many ships they were planning on building in the coming years. The result of this was that the decision on the {{wp|nuclear submarine}} concept was delayed until construction on the conventional submarines had begun, to make sure the Navy got the minimum of 20 submarines they had wanted. | |||
The SSV 011 took some of the basic systems and warfare features from the [[SSV 001-class submarine|SSV 001 class]] and improved them quite a bit. It isn't known exactly what the largest upgrades were, however, as details about the class' development and construction are classified. It is speculated that the {{wp|sonar}}, {{wp|radar}}, and {{wp|fire control system|FCS}} all received major upgrades, while being based on the same platform. | |||
==List of vessels== | |||
{|class="wikitable" | |||
!Hull no. | |||
!Laid down | |||
!Launched | |||
!Commissioned | |||
!Status | |||
|- | |||
| [[SSV-011]] || 16 March 2003 || 11 December 2005 || 16 May 2007 || In active service | |||
|- | |||
| [[SSV-012]] || 29 July 2003 || 7 February 2006 || 3 July 2007 || In active service | |||
|- | |||
| [[SSV-013]] || 6 January 2004 || 2 November 2006|| 25 April 2008 || In active service | |||
|- | |||
| [[SSV-014]] || 25 November 2004 || 30 August 2007 || 22 January 2009 || In active service | |||
|- | |||
| [[SSV-015]] || 5 April 2005 || 2 January 2008 || 13 June 2009 || In active service | |||
|- | |||
| [[SSV-016]] || 26 December 2005 || 7 September 2008 || 9 February 2010 || In active service | |||
|- | |||
| [[SSV-017]] || 13 January 2006 || 30 August 2008 || 24 January 2010 || In active service | |||
|- | |||
| [[SSV-018]] || 1 December 2006 || 10 August 2009 || 14 January 2011 || In active service | |||
|- | |||
| [[SSV-019]] || 20 May 2007 || 7 February 2010 || 27 July 2011 || In active service | |||
|- | |||
| [[SSV-020]] || 14 October 2007 || 17 July 2010 || 18 December 2011 || In active service | |||
|- | |||
|} | |} | ||
{{UST Topics}} | {{UST Topics}} | ||
[[Category:Sunalaya]] | |||
[[Category:Military equipment on Sunalaya]] | |||
[[Category:United States of the Tao]] | |||
[[Category:Active naval ships of the UST]] | |||
[[Category:Yellow-Class Sunalaya articles]] |
Latest revision as of 02:53, 28 July 2019
SSV 013 in 2016
| |
Class overview | |
---|---|
Builders: | |
Operators: | |
Preceded by: | SSV 001-class |
Succeeded by: | SSV 025-class (planned) |
Built: | 2003–2010 |
In commission: | 2007-present |
Planned: | 10 |
Completed: | 10 |
Active: | 10 |
General characteristics | |
Type: | Attack submarine |
Displacement: | 4,200 tons (submerged) |
Length: | 84.0 m (275.6 ft) |
Beam: | 9.1 m (30 ft) |
Draught: | 8.5 m (28 ft) |
Propulsion: |
|
Speed: |
|
Endurance: | 6,100 nmi (11,300 km; 7,000 mi) |
Complement: | 65 enlisted and officers |
Armament: |
|
The SSV 011-class submarine is a class of attack submarines constructed for the United States of the Tao Navy (USTN), and operated by the Imperial Taoist Navy (ITN) . It is one of two attack submarine classes in active service with the ITN. It was originally conceived of in the 1983 "next-gen" fleet plan.
Development
The SSV 011 class submarines were originally envisioned in the 1983 "next-gen" fleet project. By 1985 the plan had been ready for implementation and called for at least two new classes of conventionally powered attack submarines (SSV 001 and SSV 011). While the plan considered a class of nuclear attack submarines the USTN was too split on whether or not it was a good use of resources, especially considering how many ships they were planning on building in the coming years. The result of this was that the decision on the nuclear submarine concept was delayed until construction on the conventional submarines had begun, to make sure the Navy got the minimum of 20 submarines they had wanted.
The SSV 011 took some of the basic systems and warfare features from the SSV 001 class and improved them quite a bit. It isn't known exactly what the largest upgrades were, however, as details about the class' development and construction are classified. It is speculated that the sonar, radar, and FCS all received major upgrades, while being based on the same platform.
List of vessels
Hull no. | Laid down | Launched | Commissioned | Status |
---|---|---|---|---|
SSV-011 | 16 March 2003 | 11 December 2005 | 16 May 2007 | In active service |
SSV-012 | 29 July 2003 | 7 February 2006 | 3 July 2007 | In active service |
SSV-013 | 6 January 2004 | 2 November 2006 | 25 April 2008 | In active service |
SSV-014 | 25 November 2004 | 30 August 2007 | 22 January 2009 | In active service |
SSV-015 | 5 April 2005 | 2 January 2008 | 13 June 2009 | In active service |
SSV-016 | 26 December 2005 | 7 September 2008 | 9 February 2010 | In active service |
SSV-017 | 13 January 2006 | 30 August 2008 | 24 January 2010 | In active service |
SSV-018 | 1 December 2006 | 10 August 2009 | 14 January 2011 | In active service |
SSV-019 | 20 May 2007 | 7 February 2010 | 27 July 2011 | In active service |
SSV-020 | 14 October 2007 | 17 July 2010 | 18 December 2011 | In active service |