Yuanshi-class submarine: Difference between revisions

Jump to navigation Jump to search
No edit summary
No edit summary
Line 4: Line 4:
{{Infobox ship image
{{Infobox ship image
|Ship image= [[File:Hms_churchill_s46.jpg|300px]]
|Ship image= [[File:Hms_churchill_s46.jpg|300px]]
|Ship caption= ''Yuanshi'' (SSN-0X) at sea in 1970
|Ship caption= ''Yuanshi'' (SSN-04) at sea in 1970
}}
}}
{{Infobox ship class overview
{{Infobox ship class overview
Line 15: Line 15:
|Subclasses=  
|Subclasses=  
|Cost= ¥XX.XX billion [[Huliean yuan]] <small>(FY1971)</small>
|Cost= ¥XX.XX billion [[Huliean yuan]] <small>(FY1971)</small>
|Built range= 19XX–19
|Built range= 1967–1970
|In commission range= 1970–1992
|In commission range= 1970–19XX
|Total ships building=  
|Total ships building=  
|Total ships planned= 3
|Total ships planned= 3
Line 45: Line 45:
|Ship ramps=
|Ship ramps=
|Ship ice class=
|Ship ice class=
|Ship power= 1 x [[Fushan Atomics]] SS3 nuclear reactor producing 15,000 shp (11 MW)
|Ship power= 1 x [[Fushan Atomics]] SS3 nuclear reactor producing XX,000 shp (XX MW)
|Ship propulsion= 1 x shaft, pump-jet propulsor
|Ship propulsion= 1 x shaft, pump-jet propulsor
|Ship sail plan=
|Ship sail plan=
Line 97: Line 97:
| SSN-04
| SSN-04
|rowspan=6| [[Yanmei Shipyard Co.]], [[Yanmei]]
|rowspan=6| [[Yanmei Shipyard Co.]], [[Yanmei]]
| 26 June 1967
| 30 June 1967
| 7 December 1968
| 17 May 1969
| 4 February 1970
| 1 April 1970
| Decommissioned 13 January 1995
| Decommissioned 13 January 1995
|-  
|-  
| Lingbao
| Lingbao
| SSN-05
| SSN-05
| 27 October 1967
| 28 October 1967
| 10 June 1972
| 27 September 1969
| 26 January 1974
| 1 August 1970
| Decommissioned 5 October 1995
| Decommissioned 5 October 1995
|-
|-
| Daode
| Daode
| SSN-06
| SSN-06
| 8 January 1972
| 13 March 1968
| 6 April 1974
| 10 January 1970
| 13 November 1976
| 1 January 1971
| Decommissioned 19 August 2001
| Decommissioned 19 August 2001
|}
|}

Revision as of 13:44, 24 March 2019

Yuanshi-class submarine
Hms churchill s46.jpg
Yuanshi (SSN-04) at sea in 1970
Class overview
Name: Yuanshi-class attack submarine
Builders: Yanmei Shipyard Co.
Operators:
Preceded by: Jörmungandr class
Succeeded by: Jupiter class
Cost: ¥XX.XX billion Huliean yuan (FY1971)
Built: 1967–1970
In commission: 1970–19XX
Planned: 3
Completed: 3
Retired: 3
General characteristics
Type: Nuclear attack submarine
Displacement: 4,900 tonnes (standard)
Length: 86.9 m (285 ft)
Beam: 10.1 m (33 ft)
Draft: 8.2 m (27 ft)
Installed power: 1 x Fushan Atomics SS3 nuclear reactor producing XX,000 shp (XX MW)
Propulsion: 1 x shaft, pump-jet propulsor
Speed: 28 knots (56 km/h) submerged
Range: Unlimited
Crew: 103
Armament: 6 × 21 inch (533 mm torpedo tubes for:

Development

Design

General characteristics

Power & propulsion

Armament

Sensors & countermeasures

Service history

Boats

Name Hull No. Builder Laid down Launched Commissioned Status
Yuanshi SSN-04 Yanmei Shipyard Co., Yanmei 30 June 1967 17 May 1969 1 April 1970 Decommissioned 13 January 1995
Lingbao SSN-05 28 October 1967 27 September 1969 1 August 1970 Decommissioned 5 October 1995
Daode SSN-06 13 March 1968 10 January 1970 1 January 1971 Decommissioned 19 August 2001

See also