User:Montecara/Sandbox/Aurean Tunnels: Difference between revisions

Jump to navigation Jump to search
No edit summary
Line 6: Line 6:
| caption      =  
| caption      =  
| official_name =  
| official_name =  
| other_name    =  
| other_name    =
| line          =  
| line          =  
| location      = {{flag|Montecara}} to {{flag|Paretia}}
| location      = {{flag|Montecara}} to {{flag|Paretia}}
Line 45: Line 45:
| extra        =  
| extra        =  
}}
}}
The '''Aurean Tunnel''' is a twin-bore rail {{wp|Underwater tunnel|undersea tunnel}} traversing the [[Aurean Straits|Western Aurean Strait]] between [[Montecara]] and [[Paretia]]. Planned and built between 1960 and 1967, it was at the time of its completion one of the most expensive engineering projects in world history.
The '''Aurean Tunnel''' ([[Montecaran language|Montecaran]]: ''Trafóro Aureà''; {{wp|Portuguese language|Luzelese}}: ''Túnel Áureo'') is a twin-bore rail {{wp|Underwater tunnel|undersea tunnel}} traversing the [[Aurean Straits|Western Aurean Strait]] between [[Montecara]] and [[Paretia]]. Planned and built between 1960 and 1967, it was at the time of its completion one of the most expensive engineering projects in world history.


The tunnel runs under the island of [[Madona]], which is home to much of its ventilation, maintenance, and firefighting infrastructure.
The tunnel runs under the island of [[Madona]], which is home to much of its ventilation, maintenance, and firefighting infrastructure.

Revision as of 17:00, 26 July 2023

Aurean Tunnel
Overview
Location Montecara to  Paretia
Coordinates39°43′27″N
83°31′52″W
CrossesWestern Aurean Strait
StartMontecara
Endnear Mavoa, Luzela
Operation
OperatorTrenalia
Technical
Length6.88 kilometers (4.28 mi)
No. of tracks
Track gauge1,500 mm (4 ft 11 116 in)
Electrified25 kV / 50 Hz AC overhead lines

The Aurean Tunnel (Montecaran: Trafóro Aureà; Luzelese: Túnel Áureo) is a twin-bore rail undersea tunnel traversing the Western Aurean Strait between Montecara and Paretia. Planned and built between 1960 and 1967, it was at the time of its completion one of the most expensive engineering projects in world history.

The tunnel runs under the island of Madona, which is home to much of its ventilation, maintenance, and firefighting infrastructure.

Planning

  • Tunnel versus bridge, road versus rail
  • Funding model
  • Engineering
  • Geology
  • Railway design
    • Loading gauge
    • Signaling
    • Power
    • Track system
    • Ventilation and drainage

Construction

Operation

  • Services
  • Passenger numbers
  • Economics
  • Security
  • Border controls

Impact

Incidents and accidents

Other services

  • Electric interconnector
  • Internet cabling