Tofino bid for the 2026 Summer Olympics: Difference between revisions

Jump to navigation Jump to search
No edit summary
No edit summary
Line 4: Line 4:


The bid has garnered high profile celebrity and political endorsements from notable Tofinoites.  
The bid has garnered high profile celebrity and political endorsements from notable Tofinoites.  
==Bid details==
===Venues===
====Olympic Park====
The 2026 bid plan emphasized use of existing facilities in [[Olympic Park, Tofino|Olympic Park]]. Most of the facilities would be renovated and updated at an estimated cost of ℤ6.1-billion.
====Outlying====
===Olympic Village===
The Olympic Village that was constructed for the 2004 Games had since been converted into condominium units, so a newly-allotted Olympic Village would be constructed. The Olympic Village for housing athletes during the games would be a ℤ1.1-billion series of newly constructed riverside buildings that would have been converted to rental and condominium units after the games. The village was to be located on the southern bank of the [[Zian River]] in [[North Coome, Tofino|North Coome]] on a current truck parking lot directly north of the Olympic Park. This location is meant to enable 88% of the Olympic athletes to be within 15 minutes of their competition venue.


[[Category:Coalition of Crown Albatross]][[Category:Sports (Coalition of Crown Albatross)]][[Category:Zamastan]]
[[Category:Coalition of Crown Albatross]][[Category:Sports (Coalition of Crown Albatross)]][[Category:Zamastan]]

Revision as of 20:00, 20 August 2024

The Tofino bid for the 2026 Summer Olympics is a bid by Tofino to host the Summer Olympic Games. Tofino previously hosted the 1958 and 2004. In Tofino's bid, the games would be held from July 22 to August 7th. The bid plan emphasized use of existing facilities in Olympic Park and around the city, and celebration locations with high-definition LED screens for unticketed visitors. The bid notes that there are a very high concentration of event locations and training facilities close to each other and that the majority of event sites were clustered together. Thus, the vast majority of athletes would be close to their competitions.

The bid has garnered high profile celebrity and political endorsements from notable Tofinoites.

Bid details

Venues

Olympic Park

The 2026 bid plan emphasized use of existing facilities in Olympic Park. Most of the facilities would be renovated and updated at an estimated cost of ℤ6.1-billion.

Outlying

Olympic Village

The Olympic Village that was constructed for the 2004 Games had since been converted into condominium units, so a newly-allotted Olympic Village would be constructed. The Olympic Village for housing athletes during the games would be a ℤ1.1-billion series of newly constructed riverside buildings that would have been converted to rental and condominium units after the games. The village was to be located on the southern bank of the Zian River in North Coome on a current truck parking lot directly north of the Olympic Park. This location is meant to enable 88% of the Olympic athletes to be within 15 minutes of their competition venue.