SSV 021-class submarine
This article is incomplete because it is pending further input from participants, or it is a work-in-progress by one author. Please comment on this article's talk page to share your input, comments and questions. Note: To contribute to this article, you may need to seek help from the author(s) of this page. |
An SSV 021-class in 2014
| |
Class overview | |
---|---|
Builders: | Dajime Shipbuilding Co. |
Operators: | UST Navy |
Succeeded by: | SSV 023-class |
Built: | 2004-2006 |
In commission: | 2007-presnet |
Planned: | 2 |
Completed: | 2 |
Active: | 2 |
General characteristics | |
Type: | Nuclear submarine |
Displacement: | 7,000 tons (submerged) |
Length: | 110 m (360 ft) |
Beam: | 11 m (36 ft) |
Draft: | 7.5 m (25 ft) |
Propulsion: | Nuclear reactor |
Speed: | 30 knots (56 km/h; 35 mph) |
Range: | Unlimited |
Armament: |
|
The SSV-021-class submarine is a class of nuclear attack submarines constructed for the United States of the Tao Navy. It is the only class of nuclear attack submarines in the USTN. It is a part of the "next-gen" fleet plan created in 1983.
Development
In 1983 the USTN began preliminary work on what is now known as the "next-gen" fleet project. This project would require a gradual evolution from ships using generally outdated equipment to ships using state of the art equipment. The plan called for at least two new classes of attack submarines. (SSV 001-class, SSV 011-class) While the possibility of a third, nuclear-powered submarine was considered, it was ultimately delayed until 1998, when the USTN officially ordered the class.
The propulsion system for these vessels is not like other submarines in the USTN's lineup. What sets the SSV 021 class apart is its nuclear reactors, which heats pressurized water into steam, which is then used to spin turbines. This creates a large amount of power, but most importantly, it runs off of uranium, which small amounts of can run the reactors for years. This, in theory, makes the only limitation to the vessels endurance, food.
List of vessels
Hull no. | Laid down | Launched | Commissioned | Status |
---|---|---|---|---|
SSV-021 | 29 October 2004 | 23 December 2005 | 4 May 2007 | In active service |
SSV-022 | 13 January 2005 | 8 February 2006 | 20 July 2007 | In active service |