Batu Bergigi line (Noules metro)

Revision as of 13:12, 1 November 2023 by Ceryana (talk | contribs) (Created page with "{{Infobox rail line |name = <span style="color:#95BD7B">BB</span><br>Batu Bergigi line<br><span style="font-size:80%">Ligne Batu Bergigi<br>Laluan Batu Bergigi<br>牙...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
BB
Batu Bergigi line
Ligne Batu Bergigi
Laluan Batu Bergigi
牙尖石綫
Metro Noules Logo.png
Overview
TypeRapid transit
SystemNoules Metro
LocaleNoules
TerminiBattery Point metro station
Naserani metro station
Stations8
Ridership201,900 daily average (weekdays, August 2019)
Operation
Opened29 June 2012
Operator(s)Metro Noules Corporation
Rolling stockMetro Cammell EMU
Technical
Line length55.2 km
Track gauge1,435 mm
Operating speedUp to 90 km/h
Harbour East line route map
BB01 Battery Point 炮台角
BB02 Bukit Kubu 武吉邱埠
BB03 Ulu Terawang 烏魯早灣
BB04 Marina Bay 小塢灣
BB05 Auhai 後海
BB06 Balmain 波曼
HE07 Batu Bergigi 牙尖石
HE07 Naserani 納薩雷