Adunis to Mambiza Railway: Difference between revisions

Jump to navigation Jump to search
(Created page with "{{Infobox rail line |name=Adunis-Mambiza Railway |type=High-speed rail<br>Heavy rail |locale= |status=Operational |linelength_km= |start=Adunis, Tsabara |end=[...")
 
No edit summary
Line 1: Line 1:
{{Infobox rail line
{{Infobox rail line
|name=Adunis-Mambiza Railway
|name=Adunis-Mambiza Railway
|type=[[High-speed rail]]<br>[[Heavy rail]]
|type={{wp|High-speed rail}}<br>{{wp|Heavy rail}}
|locale=
|locale=
|status=Operational
|status=Operational

Revision as of 01:27, 21 December 2019

Adunis-Mambiza Railway
Overview
TypeHigh-speed rail
Heavy rail
StatusOperational
TerminiAdunis, Tsabara
Mambiza, Garambura
Technical
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Electrification25 kV 50/60 Hz AC

The Adunis to Mambiza Railway, also known as the Trans-Bahian Railway and historically known as either the 'Adunis to Sainte-Germaine Railway' or the 'Imperial Rail', is a semi-complete railway linking eastern and western Bahia by way of the Ténéré desert. The construction of the railway began in the late 19th century under the supervision of Grégoire Cuvillier, Governor of Atudée. The main line was completed by 1922, with a planned modification and second line halting due to the Great War.