Past Launches of the Shazbotdom Imperial Space Administration

Revision as of 02:30, 28 April 2024 by ShazBackup (talk | contribs) (→‎Mission Totals by Month)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Below is the complete list of past launches for the Shazbotdom Imperial Space Administration.

Mission Totals by Month

For the "Total" Number, BOLD means the year is completed, while ITALICS means the year is in progress.
DeOrbit Missions do not count towards the yearly or monthy counts.

  TOTAL Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec   DeOrbits
2022 56           1 7 11 5 8 13 11  
2
2023 156 7 10 15 13 17 11 16 14 10 12 10 21  
12
2024 51 14 15 9 13                  
8

2022

June '22

Mission Date Competion Description 1S 2S 3S SB NOTES:
OR-01 23 June, 2022 20:35 Orbital Test Flight of Low Lift Launch System without Capsule D-2 G-2      

July '22

Mission Date Competion Description 1S 2S 3S SB NOTES:
OR-02 9 July, 2022 14:40 Orbital Test Flight of Low Lift Launch System with Capsule D-2 G-2      
SSB-01 15 July, 2022 14:25 First 3 Segments of Orbital Science Space Station Assembly D-4 G-4      
SSB-02 18 July, 2022 17:55 Upper and Lower Orbital Science Space Station Assembly D-5 G-5      
SSB-03 22 July, 2022 13:35 Install Scientific Research Pods to Quadrant 2
of Orbital Science Space Station
D-6 G-6      
SSB-04 24 July, 2022 14:15 Install Scientific Research Pods to Quadrant 1
of Orbital Science Space Station
D-3 G-3     D-2 replaced with D-3
D-2 Retired.
SSB-05 28 July, 2022 12:35 Install Scientific Research Pods to Quadrant 3
of Orbital Science Space Station
D-7 G-8      
SSB-06 28 July, 2022 12:35 Install Scientific Research Pods to Quadrant 4
of Orbital Science Space Station
D-8 G-7      

August '22

Mission Date Competion Description 1S 2S 3S SB NOTES:
SSB-07 2 Aug, 2022 19:15 Install 1st set of Solar Panels on Orbital Science Space Station D-3 G-5      
SSB-08 5 Aug, 2022 14:55 Install 3rd set of Solar Panels on Orbital Science Space Station D-4 G-2      
CSF-01 7 Aug, 2022 13:55 Commerical Space Flight for Wan Gyeong National University (1 of 3) D-9 G-9      
SSB-09 13 Aug, 2022 15:25 Install 2nd set of Solar Panels on Orbital Science Space Station D-5 G-4      
SSB-10 14 Aug, 2022 13:25 Install 4th set of Solar Panels on Orbital Science Space Station D-6 G-6      
SSB-11 17 Aug, 2022 07:10 install the 1st Docking Arm on Orbital Science Space Station D-8 G-7      
SSB-12 19 Aug, 2022 19:50 install the 2nd Docking Arm on Orbital Science Space Station D-9 G-9      
SSB-13 23 Aug, 2022 14:35 install the Command Center on Orbital Science Space Station D-7 G-3      
ISR-02 24 Aug, 2022 17:20 Launch and Docking of 2nd Orbital Science Space Station Resupply Mission D-3 G-5      
CRW-01 25 Aug, 2022 15:35 1st Scientific Crewed Mission to Orbital Science Space Station D-4 G-8 E-2    
CSF-02 29 Aug, 2022 13:35 Commercial Space Flight for Wan Gyeong National University (2 of 3) D-5 G-3      

September '22

Mission Date Completion Description 1S 2S 3S SB NOTES:
CSF-03 8 Sep, 2022 18:50 Launch and Place 4 v1 Satellites into Earth orbit
for CosmoCast Shazbotdom
D-6 G-4      
CSF-04 10 Sep, 2022 15:30 Commercial Space Flight for Wan Gyeong
National University (3 of 3)
D-10 G-10      
CRW-01
DeOrbit
15 Sep, 2022 12:45 Mission to DeOrbit the 1st Scientific Crewed Mission
from the Orbital Science Space Station
    E-2    
LSSB-01 17 Sep, 2022 17:30 Implantation of Supersturcture for High Orbit Transfer Station D-4 G-3 S-2    
CSF-05 23 Sep, 2022 05:10 Launch and Place 4 v1 Satellites into Earth Orbit
for CosmoCast Shazbotdom
D-3 G-2      
ISR-02
DeOrbit
23 Sep, 2022 17:25 DeOrbit and Landing of 2nd Orbital Science
Space Station
Resupply Mission
         
LSSB-02 29 Sept, 2022 18:25 Mission to Launch and Install Main Hallway Section
onto High Orbit Transfer Station
D-5 G-5 S-3    

October '22

Mission Date Completion Description 1S 2S 3S SB NOTES:
OR-03 10 Oct, 2022 16:45 Orbital Test flight of Full Stack Heavy Launch System Z-1 O-1   L-1  
CRW-02 19 Oct, 2022 14:00 2nd Scientific Crewed Mission to Orbital Science Space Station D-6 G-2 E-1    
CSF-06 22 Oct, 2022 14:30 Mission to Launch and Place 4 v2 Satellites into Earth
Orbit for CosmoCast Shazbotdom
Z-2 A-3   L-2  
PFF-01 24 Oct, 2022 15:50 1st PATHOS Foundation Flight Z-3 T-1   L-3  
PFF-02 25 Oct, 2022 10:00 2nd PATHOS Foundation Flight Z-4 T-2   L-4  
PFF-03 26 Oct, 2022 13:30 3rd PATHOS Foundation Flight Z-5 T-3   L-5  
PFF-04 29 Oct, 2022 15:30 4th PATHOS Foundation Flight Z-6 T-4   L-6  
PFF-05 30 Oct, 2022 17:35 5th PATHOS Foundation Flight Z-7 T-5   L-7  

November '22

Mission Date Completion Description 1S 2S 3S SB NOTES:
PFF-06 1 Nov, 2022 12:00 6th PATHOS Foundation Flight Z-8 T-6   L-8  
PFF-07 3 Nov, 2022 17:45 7th PATHOS Foundation Flight Z-9 T-7   L-9  
PFF-08 6 Nov, 2022 13:30 8th PATHOS Foundation Flight Z-10 T-8   L-10  
PFF-09 8 Nov, 2022 19:00 9th PATHOS Foundation Flight Z-1 T-9   L-1  
PFF-10 12 Nov, 2022 17:35 10th PATHOS Foundation Flight Z-2 T-10   L-2  
PFF-11 14 Nov, 2022 18:40 11th PATHOS Foundation Flight Z-3 T-11   L-3  
PFF-12 17 Nov, 2022 13:10 12th PATHOS Foundation Flight Z-4 T-12   L-4  
PFF-13 19 Nov, 2022 15:55 13th PATHOS Foundation Flight Z-5 T-13   L-5  
PFF-14 22 Nov, 2022 17:15 14th PATHOS Foundation Flight Z-6 T-14   L-6  
PFF-15 25 Nov, 2022 12:45 15th PATHOS Foundation Flight Z-7 T-15   L-7  
ISR-03 26 Nov, 2022 16:40 Launch and Docking of 3rd Orbital Science Space Station Resupply Mission D-7 G-6      
PFF-16 27 Nov, 2022 17:30 16th PATHOS Foundation Flight Z-8 T-16   L-8  
PFF-17 29 Nov, 2022 11:30 17th PATHOS Foundation Flight Z-9 T-17   L-9  

December '22

Mission Date Completion Description 1S 2S 3S SB NOTES:
PFF-18 1 Dec, 2022 15:00 18th PATHOS Foundation Flight Z-10 T-18   L-10  
PFF-19 4 Dec, 2022 18:00 19th PATHOS Foundation Flight Z-1 T-19   L-1  
PFF-20 8 Dec, 2022 13:15 20th PATHOS Foundation Flight Z-2 T-20   L-2  
LSSB-04A 10 Dec, 2022 11:10 Launch of 1st Portion of 1st Solar Panel Array
to High Orbit Transfer Station
Z-3 O-2   L-3  
LSSB-04B 10 Dec, 2022 19:20 Launch of 2nd Portion of 1st Solar Panel Array
to High Orbit Transfer Station
D-11 G-11 S-4    
CSF-07 14 Dec, 2022 14:50 Launch and Place 6 v1 Satellites into Earth Orbit
for CosmoCast Shazbotdom
Z-4 A-4   L-4  
CRW-03 16 Dec, 2022 12:10 3rd Scientific Crewed Mission to Orbital Science Space Station D-12 G-12 E-3    
LSSB-05A 22 Dec, 2022 18:30 Launch of 1st Portion of 2nd Solar Panel Array
to High Orbit Transfer Station
Z-5 O-3   L-5  
LSSB-05b 23 Dec, 2022 14:10 Launch of 2nd Portion of 2nd Solar Panel Array
to High Orbit Transfer Station
D-13 G-13 S-6    
LSSB-06 26 Dec, 2022 17:15 Launch of 1st Secondary Hallway to High Orbit Transfer Station D-14 G-14 S-7    
LSSB-07 29 Dec, 2022 19:30 Launch of 2nd Secondary Hallway to High Orbit Transfer Station D-3 G-3 S-8    

2023

January '23

Mission Date Completion Description 1S 2S 3S SB NOTES:
PFF-21 10 Jan, 2023 15:25 21st PATHOS Foundation Flight Z-6 T-1   L-6  
PFF-22 14 Jan, 2023 15:25 22nd PATHOS Foundation Flight Z-7 T-2   L-7  
PFF-23 16 Jan, 2023 17:30 23rd PATHOS Foundation Flight Z-8 T-3   L-8  
LSSB-08 19 Jan, 2023 16:50 Launch of 3rd Secondary Hallway to High Orbit Transfer Station D-4 G-4 S-1    
LSSB-09 23 Jan, 2023 18:35 Launch of 4th Secondary Hallway to High Orbit Transfer Station D-5 G-5 S-2    
PFF-24 25 Jan, 2023 14:30 24th PATHOS Foundation Flight Z-9 T-4   L-9  
PFF-25 29 Jan, 2023 15:00 25th PATHOS Foundation Flight Z-10 T-5   L-10  

February '23

Mission Date Completion Description 1S 2S 3S SB NOTES:
CSF-08 2 Feb, 2023 17:00 Launch and Place 6 v1 Satellites into Earth Orbit
for CosmoCast Shazbotdom
Z-1 A-5   L-1  
CSF-09 5 Feb, 2023 16:05 Launch and Place 6 v1 Satellites into Earth Orbit
for CosmoCast Shazbotdom
Z-2 A-6   L-2  
PFF-26 9 Feb, 2023 13:15 26th PATHOS Foundation Flight Z-3 T-6   L-3  
PFF-27 12 Feb, 2023 17:25 27th PATHOS Foundation Flight Z-4 T-7   L-4  
SML-21 15 Feb, 2023 19:20 Launch of Satellite for the Shazbotdom Military Z-5 O-4   L-5  
LSSB-10 17 Feb, 2023 18:20 Mission to Launch Corner Hallway Segments to
High Orbit Transfer Station
D-10 G-10 S-5    
PFF-28 21 Feb, 2023 16:25 28th PATHOS Foundation Flight Z-6 T-8   L-6  
RFL-01 22 Feb, 2023 18:15 Launch of First Refueling Tanker (Stage 2 Block 5 v2) into Orbit Z-7 I-1   L-7  
CSF-10 23 Feb, 2023 18:25 Commerical Space Flight for Sigma Noosphera Dyrrhonesia Z-9 O-5   L-9  
OR-04 26 Feb, 2023 14:30 Orbital Test Flight, W/ Docking, of
Stage 2 Block 4 Booster
Z-8 K-2   L-8  

March '23

Mission Date Completion Description 1S 2S 3S SB NOTES:
PFF-29 1 Mar 14:30 29th PATHOS Foundation Flight Z-10 T-9   L-10  
PFF-30 5 Mar 17:20 30th PATHOS Foundation Flight Z-1 T-10   L-1  
PFF-31 7 Mar 18:40 31st PATHOS Foundation Flight Z-2 T-11   L-2  
ROV-01 10 Mar, 2023 19:30 Mission to Launch 1st Rover - Mars Z-3 T-12   L-3  
CRW-02
DeOrbit
12 Mar, 2023 06:45 Mission to DeOrbit the 2nd Scientific Crewed Mission
from the Orbital Science Space Station
    E-1    
CRW-03
DeOrbit
12 Mar, 2023 09:30 Mission to DeOrbit the 3rd Scientific Crewed Mission
from the Orbital Science Space Station
    E-3    
ISR-03
DeOrbit
12 Mar, 2023 13:45 DeOrbit and Landing of
3rd Orbital Science Space Station Resupply Mission
         
SSB-14 12 Mar, 2023 18:40 Launch and Install of new Docking
Section to Orbital Science Space Station
D-11 G-11      
PFF-32 14 Mar, 2023 17:30 32nd Mission for PATHOS Foundation Z-4 T-13   L-4  
LSSB-11 16 Mar, 2023 19:40 Mission to Put Middle Segment of 1st Sleeping
Quarters Section into Orbit for High Orbit Transfer Station
Z-5 O-6   L-5  
LSSB-12 17 Mar, 2023 16:33 Mission to Put 1st Side Segment of 1st Sleeping
Quarters Section into Orbit for High Orbit Transfer Station
Z-6 O-7   L-6  
LSSB-13 18 Mar, 2023 20:45 Mission to Put 2nd Side Segment of 1st Sleeping
Quarters Section into Orbit for High Orbit Transfer Station
Z-7 O-8   L-7  
LSSB-14 19 Mar, 2023 18:10 Mission to Combine 3 Segments of the 1st Sleeping
Quarters Section. Install onto High Orbit Transfer Station
occurs afterwards and not broadcasted
D-12 G-12 S-3    
PFF-33 22 Mar, 2023 18:25 33rd PATHOS Foundation Flight Z-8 T-14   L-8  
PFF-34 24 Mar, 2023 19:30 34th PATHOS Foundation Flight Z-9 T-15   L-9  
CSF-11 26 Mar, 2023 20:15 Launch and Place 13 v3 Satellites into Lunar Orbit
for CosmoCast Shazbotdom
Z-10 O-9   L-10  
PFF-35 27 Mar, 2023 19:30 35th PATHOS Foundation Flight Z-1 T-16   L-1  
PFF-36 30 Mar, 2023 16:05 36th PATHOS Foundation Flight Z-2 T-17   L-2  

April '23

Mission Date Completion Description 1S 2S 3S SB NOTES:
PFF-37 3 Apr, 2023 14:25 37th PATHOS Foundation Flight Z-3 T-18   L-3  
PFF-38 5 Apr, 2023 16:40 38th PATHOS Foundation Flight Z-4 T-19   L-4  
PFF-39 8 Apr, 2023 20:55 39th PATHOS Foundation Flight Z-5 T-20   L-5  
CSF-12 10 Apr, 2023 20:05 Launch and Place 4 v2 Satellites into Earth Orbit
for CosmoCast Shazbotdom
Z-6 A-7   L-6  
CSF-13 11 Apr, 2023 14:15 Launch and Place 4 v2 Satellites into Earth Orbit
for CosmoCast Shazbotdom
Z-7 A-8   L-7  
CSF-14 13 Apr, 2023 18:55 Launch and Place 4 v2 Satellites into Earth Orbit
for CosmoCast Shazbotdom
Z-8 A-9   L-8  
CSF-15 15 Apr, 2023 17:55 Launch and Place 4 v2 Satellites into Earth Orbit
for CosmoCast Shazbotdom
Z-9 A-10   L-9  
LSSB-15 15 Apr, 2023 17:55 Mission to Launch and Install the Corner Hallway Section
onto the High Orbit Transfer Station
D-13 G-13 S-4    
CRW-04 19 Apr, 2023 18:20 4th Scientific Crewed Mission to Orbital Science Space Station D-14 G-14 E-4    
FMBB-01 22 Apr, 2023 16:55 Launch of 1st Solar Array for First Lunar Colony Z-10 O-10   L-10  
OR-04
DeOrbit
25 Apr, 2023 10:35 DeOrbit of Test Flight of Stage 2 Block 4 Booster N/A K-2      
FMBB-02 26 Apr, 2023 19:35 Launch of 1st Battery Array for First Lunar Colony Z-1 O-1   L-1  
FMBB-03 28 Apr, 2023 15:25 Launch of 2nd Solar Array for First Lunar Colony Z-2 O-2   L-2  
PFF-40 31 Apr, 2023 20:10 40th PATHOS Foundation Flight Z-3 T-1   L-3  

May '23

Mission Date Completion Description 1S 2S 3S SB NOTES:
FMBB-04 1 May, 2023 18:35 Launch of Power Transfer Conduit for First Lunar Colony Z-4 O-3   L-4  
FMBB-05 4 May, 2023 19:15 Launch of 2nd Battery Segment for First Lunar Colony Z-5 O-4   L-5  
FMBB-06 5 May, 2023 11:20 Launch of Primary Airlock for First Lunar Colony D-3 G-2      
FMBB-07 5 May, 2023 19:45 Launch of First Vertical Segment for First Lunar Colony Z-6 O-5   L-6  
CRW-05 7 May, 2023 21:35 5th Scientific Crewed Mission to Orbital Science Space Station D-8 G-11 E-5    
FMBB-08 10 May, 2023 15:40 Launch of Second Vertical Segment
for First Lunar Colony into Orbit for Integration
Z-7 O-6   L-7  
FMBB-09 11 May, 2023 11:40 Launch of Two Habitat Modules for
First Lunar Colony into Orbit for Integration
Z-8 O-7   L-8  
FMBB-10 11 May, 2023 17:40 Launch of Two Habitat Modules for
First Lunar Colony into Orbit for Integration
Z-9 O-8   L-9  
FMBB-11 12 May, 2023 16:15 Launch of Two Habitat Modules for
First Lunar Colony into Orbit for Integration
Z-10 O-9   L-10  
FMBB-12 13 May, 2023 14:50 Launch of Two Habitat Modules for
First Lunar Colony into Orbit for Integration
Z-1 O-10   L-1  
CRW-06 14 May, 2023 19:45 6th Scientific Crewed Mission to Orbital Science Space Station D-9 G-12 E-6    
FMBB-13 17 May, 2023 18:30 Mission to Integrate 1st Vertical Section and
Habitat Modules to First Lunar Colony
  O-6      
PFF-41 20 May, 2023 19:35 41st PATHOS Foundation Flight Z-2 T-2   L-2  
PFF-42 21 May, 2023 17:55 42nd PATHOS Foundation Flight Z-3 T-3   L-3  
RBF-01 24 May, 2023 19:35 1st Launch for Reino de Brazil Space Agency Z-4 A-1   L-4  
PFF-43 27 May, 2023 19:15 43rd PATHOS Foundation Flight Z-5 T-4   L-5  
RBF-02 30 May, 203 22:30 2nd Launch for Reino de Brazil Space Agency Z-6 O-10   L-6  

June '23

Mission Date Completion Description 1S 2S 3S SB NOTES:
FMBB-14 2 June, 2023 20:15 Mission to Launch 3rd Vertical Section for
First Lunar Colony into Orbit for Integration
Z-2 O-4   L-2  
FMBB-15 5 June, 2023 13:15 Mission to Launch 4 First Lunar Colony
Habitat Modules into Orbit for Integration
Z-3 O-3   L-3 Catastrophic Damage to
Z-3 - Undergoing Rebuild
PFF-44 7 June, 2023 16:55 44th PATHOS Foundation Flight Z-7 T-5   L-7 Minor Damage to Z-7 -
Undergoing Repairs
FMBB-16 9 June, 2023 11:25 Mission to Launch 4th Vertical Section for
First Lunar Colony into orbit for Integration
Z-8 O-7   L-8  
ROV-02 12 June, 2023 10:30 Mission to Launch 2nd Rover - Mars Z-9 T-6   L-9 Catastrophic Damage to
T-6 - Undergoing Rebuild
RBF-03 15 June, 2023 17:20 3rd Launch for Reino de Brazil Space Agency Z-10 O-8   L-10 Minor damage to
Z-10 - Undergoing Repairs
PFF-45 17 June, 2023 10:30 45th PATHOS Foundation Flight Z-1 T-7   L-1  
ROV-01
DeOrbit
20 June, 2023 20:35 DeOrbit and Landing of 1st Rover Mission - Mars 1          
FMBB-17 23 June, 2023 06:45 Mission to Integrate combined missons FMBB-14
through FMBB-16 to First Lunar Colony
  O-4
O-7
     
CRW-07 25 June, 2023 17:05 7th Scientific Crewed Mission to Orbital
Science Space Station
D-10 G-7 E-7    
ISR-04 27 June, 2023 08:30 Launch and Docking of 4th Orbital
Science Space Station
Resupply Mission
D-11 G-8      
ISR-05 27 June, 2023 18:45 Launch and Docking of 5th Orbital
Science Space Station
Resupply Mission
D-12 G-9      

July '23

Mission Date Completion Description 1S 2S 3S SB NOTES:
PFF-46 2 July, 2023 17:30 46th PATHOS Foundation Flight Z-2 T-8   L-2  
PFF-47 2 July, 2023 17:30 47th PATHOS Foundation Flight Z-4 T-9   L-4  
PFF-48 7 July, 2023 19:35 48th PATHOS Foundation Flight Z-6 T-10   L-6  
RBF-04 10 July, 2023 17:15 4th Mission for the Reino de Brazil Space Agency Z-8 O-9   L-8  
FMBB-18 12 July, 2023 11:15 Launch of Middle Hydroponics Segment for First Lunar Colony Z-9 O-5   L-9  
FMBB-19 15 July, 2023 15:15 Launch of Side A Hydroponics Segment for First Lunar Colony D-13 G-11      
FMBB-18
DeOrbit
15 July, 2023 19:35 DeOrbit of 2nd Stage Booster from FMBB-18   O-5      
FMBB-20 19 July, 2023 13:10 Launch of Side B Hydroponics Segment for First Lunar Colony D-14 G-13      
FMBB-21 23 July, 2023 07:35 Mission to Integrate Combined Missions
FMBB-18 through FMBB-20 to First Lunar Colony
         
LTB-01 24 July, 2023 06:00 Mission to Launch Primary Segment of Lunar Orbit Transfer Station Z-1 O-1   L-1  
LTB-02 24 July, 2023 14:20 Mission to Launch and Integrate Transfer Arm 1
to Lunar Orbit Transfer Station
Z-2 O-2   L-2  
LTB-03 24 July, 2023 19:35 Mission to Launch and Integrate Transfer Arm 2
to Lunar Orbit Transfer Station
Z-6 O-3   L-6  
LTB-04 25 July, 2023 11:45 Mission to Launch and Integrate Temp. Engine
1 to Lunar Orbit Transfer Station
D-8        
LTB-05 25 July, 2023 20:10 Mission to Launch and Integrate Temp. Engine
2 to Lunar Orbit Transfer Station
D-9        
CSF-16 28 July, 2023 17:35 Launch and Place 4 v2 Satellites into Earth Orbit
for CosmoCast Shazbotdom
Z-4 A-2   L-4  
LTB-06 29 July, 2023 23:40 Mission to Ascend the Lunar Orbit Transfer Station to Lunar Orbit          
CSF-17 30 July, 2023 18:25 Launch and Place 13 v3 Satellites into Lunar Orbit
for CosmoCast Shazbotdom
Z-5 O-10   L-5  

August '23

Mission Date Completion Description 1S 2S 3S SB NOTES:
PFF-49 2 Aug, 2023 19:55 49th PATHOS Foundation Flight Z-3 T-11   L-3  
OR-05 4 Aug, 2023 17:45 Orbital Flight Test of updated 4534-class Launch Platform H-65765 J-3234      
PFF-50 6 Aug, 2023 15:20 50th PATHOS Foundation Flight Z-7 T-12   L-7  
PFF-51 10 Aug, 2023 11:35 51st PATHOS Foundation Flight Z-10 T-13   L-10  
PFF-52 13 Aug, 2023 15:30 52nd PATHOS Foundation Flight Z-5 T-14   L-5  
PFF-53 14 Aug, 2023 20:05 53rd PATHOS Foundation Flight Z-1 T-15   L-1  
FMBB-22 17 Aug, 2023 18:45 Mission to Launch Adapter section into orbit
for First Lunar Colony Landing Complex
D-8 G-10      
FMBB-23 18 Aug, 2023 17:30 Mission to Launch and Dock 1st Vertical Segment
of First First Lunar Colony Landing Complex
Z-11 T-5   L-11  
FMBB-22
DeOrbit
18 Aug, 2023 19:30 Mission to deorbit 2nd Stage Booster from FMBB-22   G-10      
FMBB-24 19 Aug, 2023 15:35 Mission to Launch and Dock Landing Deck
for First Lunar Colony Landing Complex
Z-12 O-8   L-12  
FMBB-25 19 Aug, 2023 19:00 Mission to Launch and Dock Check-In/Walking
Hallway for First Lunar Colony Landing Complex
Z-13 O-9   L-13  
PFF-54 14 Aug, 2023 20:05 54th PATHOS Foundation Flight Z-14 T-16   L-14  
FMBB-26 24 Aug, 2023 19:00 Mission to launch the 2nd Vertical Segment into
Orbit for the First Lunar Colony Landing Complex
Z-15 O-4   L-15  
FMBB-27 26 Aug, 2023 17:45 Mission to launch the 2nd Adapter Segment into Orbit
for the First Lunar Colony Landing Complex
D-9 G-14      
FMBB-28 29 Aug, 2023 19:15 Mission to Integrate Combined missions
FMBB-22 through MBB-27 onto the First Lunar Colony
  O-4
O-5
     

September '23

Mission Date Completion Description 1S 2S 3S SB NOTES:
LSSB-16 2 Sept, 2023 17:20 Launch Outer Hallway for 2nd Dorm Complex
of High Orbit Transfer Station
D-6 G-12 S-4    
LSSB-17 5 Sept, 2023 14:35 Launch 1st Segment of 2nd Dorm Complex
of High Orbit Transfer Station
Z-4 O-1   L-4  
LSSB-18 6 Sept, 2023 18:45 Launch 2nd Segment of 2nd Dorm Complex
of High Orbit Transfer Station
Z-5 O-2   L-5  
LSSB-19 9 Sept, 2023 19:55 Launch 3rd Segment of 2nd Dorm Complex
of High Orbit Transfer Station
Z-6 O-3   L-6  
LSSB-20 11 Sept, 2023 11:35 Mission to Reorient 2nd Dorm Complex of
High Orbit Transfer Station
    S-2    
LSSB-21 13 Sept, 2023 09:25 Mission to DeOrbit 3rd Stage Booster from LSSB-01     S-2    
LSSB-22 16 Sept, 2023 17:35 Misson to Dock Corner Hallway Segment
onto High Orbit Transfer Station
D-7 G-6 S-3    
FMBB-29 19 Sept, 2023 18:30 Misson to Launch and Dock 1st Dorm Segment to First Lunar Colony Z-2 O-6   L-2  
FMBB-30 22 Sept, 2023 14:45 Misson to Launch and Dock 2nd Dorm Segment to First Lunar Colony Z-8 O-7   L-8  
FMBB-31 25 Sept, 2023 18:15 Misson to Launch and Dock 3rd Solar Panel Array to First Lunar Colony Z-9 O-10   L-9  
PFF-55 28 Sept, 2023 14:45 55th PATHOS Foundation Flight Z-10 T-17   L-10  

October '23

Mission Date Completion Description 1S 2S 3S SB NOTES:
FMBB-32 1 Oct, 2023 20:45 Mission to Launch and Dock 3rd Battery Segment to First Lunar Colony Z-11 O-5   L-11  
TRA-01 4 Oct, 2023 18:30 Mission to Launch and Dock 1st Lunar Lander to Lunar Orbit Transfer Station Z-12 O-8 P-1 L-12  
ROV-02
DeOrbit
4 Oct, 2023 18:30 Mission to DeOrbit and Land 2nd Rover Mission - Destination Mars          
CRW-08 10 Oct, 2023 13:15 8th Scientific Crewed Mission to Orbital Science Space Station D-6 G-7 E-8    
ROV-03 12 Oct, 2023 10:45 Mission to Launch 3rd Rover - Destination Ganymede Z-15 R-1   L-15  
ROV-04 13 Oct, 2023 15:30 Mission to Launch 4th Rover - Destination Europa Z-14 R-2   L-14  
TRA-02 17 Oct, 2023 17:15 Mission to Launch and Dock 2nd Lunar Lander to Lunar Orbit Transfer Station Z-13 O-4 P-2 L-13  
CRW-04
DeOrbit
19 Oct, 2023 09:45 Mission to DeOrbit the 4th Scientific Crewed Mission from the Orbital Science Space Station     E-4    
CSF-18 17 Oct, 2023 15:15 Mission to Launch Commercial Flight for X.P.L.R from The Constitutional Federal Republic of ViZion Z-8 T-18   L-8  
FMBB-33 22 Oct, 2023 17:45 Launch and Dock the 4th Solar Panel Array to the First Lunar Colony Z-3 O-6   L-3  
FMBB-34 23 Oct, 2023 19:30 Launch and Dock the 4th Battery Segment to the First Lunar Colony Z-4 O-9   L-4  
COL-01 27 Oct, 2023 17:35 Launch of the 1st Colonization Mission to the First Lunar Colony Z-7 K-1   L-7  
FMBB-35 29 Oct, 2023 15:10 Launch and Dock the 3rd Dorm Segment to the First Lunar Colony Z-11 O-10   L-11  
FMBB-36 30 Oct, 2023 19:25 Launch and Dock the 4th Dorm Segment to the First Lunar Colony Z-1 O-2   L-1  

November '23

Mission Date Completion Description 1S 2S 3S SB NOTES:
COL-01
DeOrbit
8 Nov, 2023 10:30 DeOrbit of 1st Colonization Mission from the First Lunar Colony   K-3      
ROV-05 10 Nov, 2023 18:30 Launch of 5th Rover Mission - Destination Venus Z-9 O-1   L-9  
ROV-06 13 Nov, 2023 13:05 Launch of 6th Rover Mission - Destination Venus Z-10 O-6   L-10  
TRA-03 13 Nov, 2023 15:45 Mission to Launch and Dock Lunar Lander Psi-3 to Lunar Orbit Transfer Station. Z-8 O-4 P-3 L-8  
TRA-04 18 Nov, 2023 18:15 Mission to Launch and Dock Lunar Lander Psi-4 to Lunar Orbit Transfer Station Z-2 O-5 P-4 L-2  
PFF-56 20 Nov, 2023 13:30 56th PATHOS Foundation Flight Z-5 T-19   L-5  
PFF-57 22 Nov, 2023 15:30 57th PATHOS Foundation Flight Z-3 T-20   L-3  
PFF-58 25 Nov, 2023 10:30 58th PATHOS Foundation Flight Z-6 T-1   L-6  
PFF-59 26 Nov, 2023 18:00 59th PATHOS Foundation Flight Z-12 T-2   L-12  
PFF-60 28 Nov, 2023 13:10 60th PATHOS Foundation Flight Z-13 T-3   L-13  
PFF-61 29 Nov, 2023 17:15 61st PATHOS Foundation Flight Z-14 T-4   L-14  

December '23

Mission Date Completion Description 1S 2S 3S SB NOTES:
SPL-01 1 Dec, 2023 10:15 1st Solar Probe Launch Z-15 T-5   L-15  
PFF-62 4 Dec, 2023 16:45 62nd PATHOS Foundation Flight Z-1 T-6   L-1  
PFF-63 7 Dec, 2023 17:30 63rd PATHOS Foundation Flight Z-7 T-7   L-7  
MTB-01 9 Dec, 2023 09:30 Mission to Launch Primary Docking Segment of Mars Orbital Transfer Station Z-11 T-2   L-11  
MTB-02 9 Dec, 2023 12:30 Mission to Launch 2nd Primary Segment of Mars Orbital Transfer Station Z-2 O-7   L-2  
MTB-03 9 Dec, 2023 17:15 Mission to Launch 3rd Primary Segment of Mars Orbital Transfer Station Z-5 O-8   L-5  
MTB-04 10 Dec, 2023 13:15 Mission to Launch First Secondary Hallway of Mars Orbital Transfer Station Z-6 O-9   L-6  
MTB-05 10 Dec, 2023 18:45 Mission to Launch Second Secondary Hallway of Mars Orbital Transfer Station Z-10 O-10   L-10  
MTB-06 11 Dec, 2023 08:45 Mission to Launch 1st Docking Wing Segments of Mars Orbital Transfer Station Z-4 O-1   L-4  
MTB-07 11 Dec, 2023 17:00 Mission to Launch 2nd Docking Wing Segments of Mars Orbital Transfer Station Z-1 O-2   L-1  
1LFB-01 14 Dec, 2023 17:00 Mission to Launch Primary Superstructure of 1st Lunar Hydroponics Farm Z-12 O-3   L-12  
1LFB-02 17 Dec, 2023 13:45 Mission to Launch and Dock 1st Two Small Hydroponics Segments onto 1st Lunar Hydroponics Farm Z-14 O-4   L-14  
1LFB-03 18 Dec, 2023 17:00 Mission to Launch and Dock 2nd Two Small Hydroponics Segments onto 1st Lunar Hydroponics Farm Z-15 O-5   L-15  
1LFB-04 19 Dec, 2023 14:15 Mission to Launch and Dock 1st Large Hydroponics Segment onto 1st Lunar Hydroponics Farm Z-2 O-6   L-2  
1LFB-05 20 Dec, 2023 18:15 Mission to Launch and Dock 2nd Large Hydroponics Segment onto 1st Lunar Hydroponics Farm Z-5 O-9   L-5  
1LFB-06 22 Dec, 2023 13:00 Mission to Launch and Dock 3rd Large Hydroponics Segment onto 1st Lunar Hydroponics Farm Z-7 O-8   L-7  
CRW-09 23 Dec, 2023 12:25 9th Scientific Crewed Mission to Orbital Science Space Station D-10 G-9 E-1    
1LFB-07 24 Dec, 2023 15:15 Mission to Launch and Dock 4th Large Hydroponics Segments onto 1st Lunar Hydroponics Farm Z-8 O-7   L-8  
1LFB-08 25 Dec, 2023 19:15 Mission to Launch and Dock 1st Side Hallway Segments onto 1st Lunar Hydroponics Farm Z-6 O-10   L-6  
CRW-05
DeOrbit
23 Dec, 2023 12:25 Mission to DeOrbit the 5th Scientific Crewed Mission from the Orbital Science Space Station     E-5    
1LFB-09 27 Dec, 2023 16:00 Mission to Launch and Dock 2nd Side Hallway Segments onto 1st Lunar Hydroponics Farm Z-3 O-7   L-3  
1LFB-10 30 Dec, 2023 12:30 Mission to Launch Side Connector and Primary Airlock to the 1st Lunar Hydroponics Farm Z-9 O-1   L-9  

2024

January '24

Mission Date Completion Description 1S 2S 3S SB NOTES:
1LFB-11 5 Jan, 2024 14:15 Mission to Ascend and Land 1st Lunar Hydroponics Farm onto Lunar Surface   O-3      
1LFB-12 7 Jan, 2024 16:45 Mission to Launch Primary Power Conduit into Orbit for 1st Lunar Hydroponics Farm D-13 G-13      
CRW-06
DeOrbit
8 Jan, 2024 13:15 Mission to DeOrbit the 6th Scientific Crewed Mission from the Orbital Science Space Station     E-6    
1LFB-13 9 Jan, 2024 12:45 Mission to Launch Solar Panel Array 1 for 1st Lunar Hydroponics Farm
into Orbit and Dock with Power Conduit
Z-12 O-6   L-12  
1LFB-14 11 Jan, 2024 18:30 Mission to Elevate Solar Panel Array 1 and Power Conduit to
the Moon and dock with 1st Lunar Hydroponics Farm
  O-6      
1LFB-15 13 Jan, 2024 10:00 Mission to Launch and Dock Solar Panel Array 2 to 1st Lunar Hydroponics Farm Z-14 O-8   L-14  
1LFB-16 16 Jan, 2024 16:00 Mission to Launch and Dock Solar Panel Array 3 to 1st Lunar Hydroponics Farm Z-15 O-9   L-15  
1LFB-17 18 Jan, 2024 15:30 Mission to Launch and Dock Battery Segment to 1st Lunar Hydroponics Farm Z-1 O-2   L-1  
CRW-10 20 Jan, 2024 15:30 10th Scientific Crewed Mission to Orbital Science Space Station D-11 G-11 G-2     
FMBB-37 21 Jan, 2024 19:15 Mission to Launch Primary Segment of Crop Transfer facility for First Lunar Colony Z-2 O-1     L-2  
FMBB-38 24 Jan, 2024 11:30 Mission to Launch Secondary Segments of Crop Transfer facility for First Lunar Colony D-11 G-10        
FMBB-37
DeObrit
24 Jan, 2024 16:30 Mission to Launch Primary Segment of Crop Transfer facility for First Lunar Colony   O-1        
FMBB-39 26 Jan, 2024 13:30 Mission to Launch and Dock Crop Storage Facility and Store for First Lunar Colony Z-5 O-4    L-5  
FMBB-40 28 Jan, 2024 14:30 Mission to Move Completed Crop Transfer Station and Dock with First Lunar Colony           
1LFB-18 31 Jan, 2024 14:30 Mission to Launch and Dock 1st Crop Storage Facility to 1st Lunar Hydroponics Farm Z-11 O-3    L-11  

February '24

Mission Date Completion Description 1S 2S 3S SB NOTES:
CRW-07
DeOrbit
1 Feb, 2024 11:30 Mission to DeOrbit the 7th Scientific Crewed Mission
from the Orbital Science Space Station
    E-7    
1LFB-19 4 Feb, 2024 13:15 Mission to Launch and Dock 2nd Crop
Storage Facility to 1st Lunar Hydroponics Farm
Z-12 O-7   L-12  
1LFB-20 6 Feb, 2024 17:15 Mission to Launch 1st 3 Segments of Crop
Landing Facility for 1st Lunar Hydroponics Farm
Z-7 O-5    L-7  
1LFB-21 8 Feb, 2024 14:00 Mission to Launch and Dock 4th Segment of
Crop Landing Facility for 1st Lunar Hydroponics Farm
Z-8 O-6   L-8  
1LFB-22 11 Feb, 2024 17:30 Mission to Launch Secondary Docking Lander
of Crop Landing Facility for 1st Lunar Hydroponics Farm
Z-9 O-8   L-9  
OR-06 13 Feb, 2024 18:15 Orbital Test Fight of new Medium Lift Launch System XPR1-1 XPR2-1      
1LFB-23 15 Feb, 2024 15:15 Mission to Dock Crop Landing Facility
to 1st Lunar Hydroponics Farm
         
1LFB-24 16 Feb, 2024 16:30 Mission to Launch Crop Transport Tau-1 to be used for
Movement Assist to move Crop Landing Facility
for 1st Lunar Hydroponics Farm
Z-14 O-2 T-1 L-14  
1LFB-25 19 Feb, 2024 11:15 Mission to Launch and Dock 1st
Housing Unit for 1st Lunar Hydroponics Farm
Z-10 O-10   L-10  
1LFB-26 22 Feb, 2024 15:15 Mission to Launch and Dock 2nd
Housing Unit for 1st Lunar Hydroponics Farm
Z-15 O-9   L-15  
CRW-11 23 Feb, 2024 16:00 11th Scientific Crewed Mission to Orbital Science Space Station D-14 G-14 E-3    
CRW-12 24 Feb, 2024 17:15 12th Scientific Crewed Mission to Orbital Science Space Station D-3 G-2 E-4    
OR-07 25 Feb, 2024 14:45 Orbital Test Fight of new Medium Lift Launch System XPR1-1 XPR2-1      
1LFB-27 25 Feb, 2024 18:00 Launch 1st Segment of Human
Landing Pad for the 1st Lunar Hydroponics Farm
Z-3 O-4   L-3  
1LFB-28 26 Feb, 2024 14:15 Launch 1st Side Segment of Human
Landing Pad for the 1st Lunar Hydroponics Farm
Z-4 O-5   L-4  
1LFB-29 29 Feb, 2024 15:30 Launch 2nd Side Segment of Human
Landing Pad for the 1st Lunar Hydroponics Farm
Z-5 O-7   L-5  

March '24

Mission Date Completion Description 1S 2S 3S NOTES:
OR-08 7 March, 2024 11:25 Orbital Test Flight of the new Medium Lift Launch System XPR1-02 XPR2-02    
TRA-05 15 March, 2024 15:10 Mission to Launch Lander Chi-1 to Earth Orbit
for Mars Orbital Transfer Station
Z-1 O-1 C-1  
BCF1-01 18 March, 2024 16:20 Launch of 1st Flight of the 1st Contract for B.R.I.T.S.A.A.A. Z-2 O-2    
BCF1-02 20 March, 2024 13:10 Launch of 2nd Flight of the 1st Contract for B.R.I.T.S.A.A.A. Z-3 O-3   Z-3 Landing
Leg Damaged
BCF1-03 22 March, 2024 17:45 Launch of 3rd Flight of the 1st Contract for B.R.I.T.S.A.A.A. Z-4 O-4   Z-4 toppled over
PCF-01 24 March, 2024 11:15 Launch of Contracted flight for PANTOPES Surveillance
and Telecommunications Incorporated from Alleana
Z-5 O-5    
BCF1-04 27 March, 2024 10:45 Launch of 4th Flight of the 1st Contract for B.R.I.T.S.A.A.A. Z-6 O-6    
WST-01 28 March, 2024 16:30 Test Atmospheric ReEntry of a Prototype Martian Weather Station D-3 G-12    
TRA-06 29 March, 2024 16:55 Mission to Launch Lander Chi-2 into Earth Orbit Z-7 O-7 C-2  

April '24

Mission Date Completion Description 1S 2S 3S NOTES:
PFF-64 2 April, 2024 15:15 64th PATHOS Foundation Fight Z-8 T-9    
PFF-65 4 April, 2024 13:05 65th PATHOS Foundation Fight Z-9 T-10    
PFF-66 7 April, 2024 15:30 66th PATHOS Foundation Fight Z-10 T-11    
PFF-67 10 April, 2024 12:30 67th PATHOS Foundation Fight Z-11 T-12    
CRW-08
DeOrbit
11 April, 2024 10:35 DeOrbit of 8th Crewed Mission to
Orbital Science Space Station
    E-8  
ROV-05
DeOrbit
11 April, 2024 20:45 DeOrbit of 5th Rover Mission (Destination Venus)        
PFF-68 12 April, 2024 17:10 68th PATHOS Foundation Fight Z-12 T-13    
WST-02 13 April, 2024 18:15 Test ReEntry Capabilities of Extra Planetary
Ground Weather Station
D-13 G-13   Landing Successful
PFF-69 15 April, 2024 17:25 69th PATHOS Foundaton Flight Z-13 T-14    
CRW-13 16 April, 2024 14:40 Launch of 13th Crewed Mission to
Orbital Science Space Station
D-4 G-3 E-5  
PFF-70 18 April, 2024 16:45 70th PATHOS Foundaton Flight Z-14 T-15    
ISR-04
DeOrbit
19 April, 2024 10:40 Landing of 4th Orbital Science
Space Station
ReSuppier Mission
    O-4  
ISR-05
DeOrbit
19 April, 2024 15:30 Landing of 5th Orbital Science
Space Station
ReSupplier Mission
    O-5  
PFF-71 20 April, 2024 14:25 71st PATHOS Foundaton Flight Z-15 T-16    
ISR-06 21 April, 2024 19:45 Launch of 6th Space Station ReSupplier Mission D-11 G-10 O-1  
ROV-06
DeOrbit
22 April, 2024 17:45 DeOrbit and Landing of 6th Rover Mission (Destination Venus)        
BCF2-01 24 April, 2024 13:15 B.R.I.T.S.A.A.A. Contract 2, Flight 1 Z-1 O-8    
BCF2-02 26 April, 2024 16:35 B.R.I.T.S.A.A.A. Contract 2, Flight 2 Z-2 O-9