Pioneer Program
Jump to navigation
Jump to search
The Pioneer Program, initially known as 'Project Pioneer', is the fifth human spaceflight program started by the Space Technologies and Aeronautical Research Administration (STAR) for manned exploration of the moon.
Background
Lunar Habitation studies
Spacecraft reusability studies
Spacecraft
Lunar transit Vehicle
Lunar Gateway Station
Reusable Lunar Lander
Taurus Service Module
Launch Vehicles
Vinci III
Vinci IV
Athena V
Base Structure
Assembly and Construction
Pressurised modules
Unpressurised modules
Expedition sites
Crew Missions
Launch Number | Mission Name/Expedition Number | Mission | Crew | Notes |
---|---|---|---|---|
1. | Gateway One | Taurus I ACV Launch: October 12 2004 Time docked: 2 weeks 4 days 1h |
(MC) |
Conducted fitting out of Lazio module |
2. | Expedition One | Taurus I ACV Launch: January 5 2005 Hab time: 15 days 4h |
Martinus Octobrius (EC) |
Finalised construction of Pioneer habitat First expedition to Copernicus Crater |
3. | Expedition Two | Taurus I ACV Launch: 2006 Hab time: TBA |
TBA | TBA |
12. | Gateway Five | Taurus II ACV Launch: September 9 2016 Time docked: 3 weeks 1 day 5h |
TBA (MC) |
Maintenance conducted on Lunar Gateway station and Lander One Collection of samples left behind by Expedition Ten Final installation of Solar Array Three |
13. | Expedition Eleven | Taurus IIA ACV Launch: March 5 2017 Hab time: 5 months 4 days 3h |
TBA | TBA |
14. | Expedition Twelve | Taurus IIA ACV Launch: January 15 2018 Hab time: Ongoing Planned: 6 months |
Nicobulus Senna (EC) TBA |
Repairs conducted to ASCR-05 'Mongoose' First moon landing of an Eesti |
Unmanned missions
Launch Number | Mission Name | Mission | Cargo | Notes |
---|---|---|---|---|
1. | Gateway Startup | Atlas IIA Second Stage September 14 2004 |
Lazio Module | First stage of Gateway station Final orbital pattern made with onboard engines |