Search results

Jump to navigation Jump to search
  • New rolling stock was required for this railroad as no existing trainsets were capable of reaching the maximum projected speeds. Due to the developin ...ng speeds along the WCTL. Tests and design work continued using three test trainsets from 2006 to 2012 with a focus on developing a fully operational vehicle fo
    23 KB (3,503 words) - 21:08, 29 September 2019
  • ...ed with two cabins: Economy & Business. All Economy class seats across all trainsets are non-reserved in nature, meaning while a ticket is required for boarding
    8 KB (1,267 words) - 22:14, 22 July 2024
  • ...-1960's) and begin an aggressive program of procuring new electric-powered trainsets and locomotives. * Continue to purchase electric multiple unit trainsets for most passenger services, leaving locomotive-linked trains to specific s
    7 KB (981 words) - 02:44, 21 March 2023
  • ...en high-floor lines use [[Rabensberg Heavy Industries]] SBV15 dual-voltage trainsets. Each set is made up of four [[wikipedia:Articulated_car|articulated]] sect
    4 KB (524 words) - 11:25, 4 October 2022
  • ...ervice lines. ''Sage'' lines are serviced by {{wp|Fuxing (train)|Blitz 4}} trainsets, with a service speed of 380km/h making it the fastest HSR service provided The East Line is currently operates two types of rolling stock trainsets:
    14 KB (1,793 words) - 14:13, 4 September 2024
  • ...peed_rail|high-speed rail]] service of [[Royal Radictistan Railways]]. ICE trainsets operate on the [[Nuxenstat-Hartfer Main Line|Nuxenstat-Hartfer]] and [[Nuxe
    5 KB (627 words) - 03:46, 19 August 2024
  • | numberbuilt = XXX Trainsets | numberservice = XXX Trainsets
    12 KB (1,624 words) - 16:43, 24 January 2021
  • ...s, and Intercity trains are pulled by locomotives while Regional and Local trainsets tend to be comprised of multiple units. Most rail vehicles used by Royal Ra
    8 KB (1,030 words) - 05:45, 13 February 2024
  • ...e made domestically by [[Albion Locomotive Works]], with only the electric trainsets being made by [[Hundredstar]] based [[HURA Speedrail]].
    8 KB (1,193 words) - 17:25, 1 July 2024
  • [[File:NTV_ETR575_R01.jpg|left|thumb|200px|The Class 520 high speed EMU trainsets entered service in 2012.]]
    11 KB (1,282 words) - 14:58, 6 October 2024
  • ...rically ranged from 4 to 16 cars, but currently there are 8-car and 16-car trainsets in operation. With cars measuring on average about 25 meters, the longest t ...y being used to study and create technology for the next generation of HHT trainsets. Entered service in 2018.
    36 KB (5,441 words) - 03:47, 25 May 2022
  • ...CRH380A-2670@BJX_(20151217090702).jpg|300px|thumb|right|Two linked MGY-501 trainsets outside Dongrŭng Main Station.]] ...ve, and which have a top speed of at least 250 kilometers per hour (most G trainsets built after 2010 have a top speed of 350 km/h). Except where otherwise indi
    52 KB (7,922 words) - 02:56, 11 July 2020
  • ...dditional fee. They finally disappeared between 1990 and 1993, when those trainsets were withdrawn. ...his problem by leaving at night and arriving by the next morning. Two K10 trainsets were constructed as sleeper trains, and as legally required, First, Second,
    43 KB (6,560 words) - 04:22, 17 January 2022
  • ...high-speed trainsets, and complimentary wi-fi is present on all high-speed trainsets built after 2010. These amenities are factored into the ticket price. Addit
    55 KB (8,537 words) - 12:26, 1 July 2021
  • ...ache which had a distributed mode of power collection and driving. The MU6 trainsets did not break any top or average speed records in testing or operation, but ...ence on the high-speed line also brought the {{wp|electric multiple-unit}} trainsets or EMUs to conventional lines. Since the Inland Mainline's express passenge
    112 KB (16,999 words) - 08:41, 25 July 2024
  • ...f parameters and recording the events onboard the train. In AVK-2-equipped trainsets, older paper-strip recording equipment has been replaced by a digital recor
    43 KB (7,170 words) - 16:45, 5 April 2024
  • ...f Hakata-Minami Station 3.jpg|225px|thumb|left|N700A series Høyhastikettog trainsets lined up at a yard.]]
    100 KB (15,319 words) - 16:57, 17 November 2023