Luerkraft Semiconductors: Difference between revisions

Jump to navigation Jump to search
m (fixed Wikipedia links)
 
(4 intermediate revisions by the same user not shown)
Line 41: Line 41:
==Fabrication facilities==
==Fabrication facilities==
===Fabrik 1===
===Fabrik 1===
Fabrik 1, located within the Municipality of Luerkraft, produces 300 mm wafers utilizing the {{wp|65_nanometer|65 nm}}, {{wp|45_nanometer|45 nm]], and [[wp|32_nanometer|32 nm}} manufacturing processes.
Fabrik 1, located within the Municipality of Luerkraft, produces 300 mm wafers utilizing the [[wikipedia:65_nm_process|65 nm]], [[wikipedia:45_nm_process|45 nm]], and [[wikipedia:32_nm_process|32 nm]] manufacturing processes.
 
===Fabrik 2===
===Fabrik 2===
Fabrik 2, located just outside the municipal borders of Luerkraft in the Speyer Department, produces 300 mm wafers utilizing 32 nm and {{wp|22_nanometer|22 nm}} technology.  
Fabrik 2, located just outside the municipal borders of Luerkraft in the Speyer Department, produces 300 mm wafers utilizing 32 nm and {{wp|22_nanometer|22 nm}} technology.
 
===Fabrik 3===
Fabrik 3 is under construction adjacent to the existing Fabrik 2. Fabrik 3 is expected to become operation in 2025 and will produce integrated circuits down to the [[wikipedia:14_nm|14 nm]] node.
 
==See also==
==See also==
*[[Capital Semiconductors]], domestic competitor.
*[[Capital Semiconductors]], domestic competitor.
*[[Virtuelle Designs]], Radictistani fabless semiconductor company
[[Category:Companies of Radictistan]]
[[Category:Companies of Radictistan]]

Latest revision as of 06:56, 9 September 2023

Luerkraft Semiconductors
Public
Traded asNSE: LKSC
Headquarters,
Number of locations
Two semiconductor fabrication plants
Key people
Igor Bodyinsky
CEO
Number of employees
4,200
Websitehttp://www.lksc.co.rd

Luerkraft Semiconductors is a semiconductor foundry located in Luerkraft, Radictistan. Luerkraft Semiconductors manufactures integrated circuits solely under contract from other companies making it a pure-play semiconductor foundry. The company has two fabrication facilities, the first in Luerkraft and the second just outside the municipal boundaries.

Business model

Luerkraft Semiconductors operates according to the foundry model of semiconductor fabrication as a "pure-play" manufacturer, producing only the designs of other companies. Its customers include both foreign and domestic semiconductor companies which do not maintain their own production facilities or who require additional capacity.

Fabrication facilities

Fabrik 1

Fabrik 1, located within the Municipality of Luerkraft, produces 300 mm wafers utilizing the 65 nm, 45 nm, and 32 nm manufacturing processes.

Fabrik 2

Fabrik 2, located just outside the municipal borders of Luerkraft in the Speyer Department, produces 300 mm wafers utilizing 32 nm and 22 nm technology.

Fabrik 3

Fabrik 3 is under construction adjacent to the existing Fabrik 2. Fabrik 3 is expected to become operation in 2025 and will produce integrated circuits down to the 14 nm node.

See also