West Monroe State Highway 125

Revision as of 16:50, 15 August 2022 by Jwill96 (talk | contribs)
Jump to navigation Jump to search
WM-125.png
Route information
Length397 mi (639 km)
Existed1922–present
Major junctions
South endWM-77.png in Carrington
 
  • I-25.svg
  • US 64.svg
  • US 59.svg
  • I-30.svg
  • I-25.svg
North endPT-2.png at Petra state line.

State Highway 125 (SH 125) is a highway that runs from SH-77 in Carrington, outside of Willmington to the Petra state line in Valley Mills. Prior to the Interstate Highway System, SH-125 was the primary route north from Willmington to Albany, Petra.

Route description

Major intersections

County Location Destination
Freemont Carrington WM-77.png - Scottsbluff
Shelby WM-21.png - Shelby, Pierce
Collins WMB-105A.png
I-25.svg - Willmington, Toledo
WM-105.png - Rockville, Shelby
Washington Sherwood WM-34.png - Chilton, Howard
Lee Leesville South WM-24.png - Taylor; Begin SH-24 Concurrency
US 64.svg To WM-31.png - Mercury, Sparta
Roosevelt North WM-24.png - Big Spring; End SH-24 Concurrency
Pierson WM-189.png - Sparta
Lee WM-153.png - Toledo
Alta WM-4.png - Fostoria, Turner
WM-301.png - Toledo
Beaverton US 59.svg - Abilene, Fostoria
Mansfield WM-130.png - Youngstown
I-30.svg - Youngstown, Frankfort
Brooks Richfield WM-201.png - Gladwin
Baylor Wilkesville WM-46.png - Plymouth, Piketon
Vinton WM-245.png - Radcliff
Walker Katy I-25.svg - Youngstown, Albany, Petra
WM-89.png - Washington, Stephenson
Valley Mills WM-5.png - Hamden, Simpson
PT-2.png to PT-5.png - New Church, Petra, Albany, Petra

See also