Crescent
Jump to navigation
Jump to search
Crescent in Jade Harbor, 2019
| |
History | |
---|---|
Janapa | |
Name: | Crescent |
Owner: | Belette Cruise Lines |
Ordered: | 12 June 2015 |
Cost: | 931 million |
Laid down: | 8 November 2017 |
Launched: | 25 February 2019 |
Christened: | 3 June 2019 |
Maiden voyage: | 18 April 2019 |
In service: | 2019—present |
Status: | In Service |
General characteristics | |
Class and type: | Crescent-class cruise ship |
Tonnage: | 169,379 GT |
Length: | 347.11 m (1,139 ft) |
Beam: |
|
Draught: | 8.8 m (29 ft) |
Decks: | 16 (14 passenger-accessible) |
Speed: | 22 knots (41 km/h; 25 mph) |
Capacity: |
|
The Crescent is a cruise ship and the lead ship in the Crescent-class. She is currently operated by Belette Cruise Lines. She primarily operates in northwest Euronia, namely in Horseshoe Bay, the Tarin and Kasuum Seas, and the Olympic Ocean.