Zulvese-Aizjhur Railway: Difference between revisions

Jump to navigation Jump to search
No edit summary
No edit summary
 
(21 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{WIP}}
{{Infobox rail line
{{Infobox rail line
| box_width        =  
| box_width        =  
Line 6: Line 7:
| native_name_lang =  
| native_name_lang =  
| color            = Purple
| color            = Purple
| logo            = [[File:Screenshot 2022-05-25 5.25.35 PM.png|60px|thumb]]
| logo            = [[File:Screenshot 2022-05-25 5.25.35 PM.png|70px|frameless]]
| logo_width      =  
| logo_width      =  
| logo_alt        = [[File:Screenshot 2022-05-25 5.30.03 PM.png|60px|thumb]]
| logo_alt        =
| image            =
| image            = [[File:Screenshot 2022-05-25 5.30.03 PM.png|80px|frameless]]
| image_width      =  
| image_width      =  
| image_alt        =  
| image_alt        =  
Line 16: Line 17:
| system          =  
| system          =  
| status          = Operational
| status          = Operational
| locale          = [[Frarstizk]]
| locale          =  
| start            = Aizjhur, [[File:Screenshot 2022-05-06 7.20.51 PM.png|23px|link=|border]] [[Frarstizk]]
| start            = Aizjhur
| end              = Aizjhur, Strodedyk, Yeiskopp, Yel Zekk, Yenverlaaɣ, [[Frarstizk]]
| end              = Strodedyk, Yeiskopp, Yel Zekk, Yenverlaaɣ, [[Frarstizk]]
| stations        = 50
| stations        = 63
| routes          =  
| routes          =  
| daily_ridership  = About 1,000,000
| daily_ridership  = About 1,000,000
Line 25: Line 26:
| planopen        =  
| planopen        =  
| open            =  
| open            =  
| open            = {{plainlist|
| open            =  
*1992 (HGZ Ost<br>[[Mascylla]], [[Finstria]], [[Krumlau]], [[Dulebia]])
*1998 (HGZ Zentral<br>[[Mascylla]], [[Krumlau]], [[Dulebia]])
*2007 (HGZ West<br>[[Juznia]])
*2015 (HGZ West<br>[[Hytekia]])
}}
| event1label      =  
| event1label      =  
| event1          =  
| event1          =  
Line 37: Line 33:
| event3label      =  
| event3label      =  
| event3          =  
| event3          =  
| owner            = Individual governments and [[HGZ Alemannia#Ownership|various companies]]
| owner            = Government of [[Frarstizk]]
| operator        =  
| operator        =  
| character        =  
| character        =  
| depot            =  
| depot            =  
| stock            =  
| stock            =  
| linelength_km    = 3,178
| linelength_km    =  
| linelength_mi    =  
| linelength_mi    =  
| linelength      =  
| linelength      =  
| tracklength_km  = 7,651
| tracklength_km  =  
| tracklength_mi  =  
| tracklength_mi  =  
| tracklength      =  
| tracklength      =  
| tracks          = {{wp|Double track}}
| tracks          = {{wp|Double track}}
| gauge            = <!-- {{|sg|allk=on}} -->
| gauge            = [https://en.wikipedia.org/wiki/Standard-gauge_railway Standard gague] (formerly [https://en.wikipedia.org/wiki/Narrow-gauge_railway Narrow gague])
| old_gauge        =  
| old_gauge        =  
| load_gauge      =  
| load_gauge      =  
Line 59: Line 55:
| speed_km/h      =  
| speed_km/h      =  
| speed_mph        =  
| speed_mph        =  
| speed            = {{plainlist|
| speed            =  
*{{convert|315|km/h|mph|0|abbr=on}}}}
| signalling      =
| signalling      =
| elevation_m      =  
| elevation_m      =  
| elevation_ft    =  
| elevation_ft    =  
| elevation        =  
| elevation        =  
| website          =  
| website          = zar.gov
| map              = [[File:HGZ Map.png|400px]]
| map_name        =
| map_state        = collapsed
| embedded        =  
| embedded        =  
}}
}}
}}
The '''Zulvese-Aizjhur Railway''' (Frarstizkian: Zulvese-Aizjhur Treindurrvach) founded by [[Frarstizk Under Hiblundiiun Rule|East Hiblundiiuns]] soon after moving to the [[Hiblund|Hiblundiiun]] Territory that is now the country [[Frarstizk]]. The railway was originally built and established by a group of Zulvese men. To East Hiblundiiuns, work was especially important because food, water, and other daily needs were more expensive. The men built the railway to provide more jobs to unemployed people.
==History==
===Hiblund Area===
The Zulvese-Aizjhur Railway was at first operated and used by the [[Hiblund|Hiblundiiuns]]. The railway was cheap and gained popularity. Many more people were hired by the railway which allowed it to expand further throughout the area.
====Establishment====
====1914 Accident====
===Frarstizk Era===
===Establishment of the Z.A.R. Museum===
==Routes==
===Preserved Lines===
==Stations==
==Locomotives==
==Links
 
{{Template:Frarstizk navbox}}

Latest revision as of 12:44, 24 July 2022

Zulvese-Aizjhur Railway
Screenshot 2022-05-25 5.25.35 PM.png
Screenshot 2022-05-25 5.30.03 PM.png
Overview
Native nameZulvese-Aizjhur Treindurrvach
StatusOperational
TerminiAizjhur
Strodedyk, Yeiskopp, Yel Zekk, Yenverlaaɣ, Frarstizk
Stations63
Daily ridershipAbout 1,000,000
Websitezar.gov
Operation
OwnerGovernment of Frarstizk
Technical
Number of tracksDouble track
Track gaugeStandard gague (formerly Narrow gague)

The Zulvese-Aizjhur Railway (Frarstizkian: Zulvese-Aizjhur Treindurrvach) founded by East Hiblundiiuns soon after moving to the Hiblundiiun Territory that is now the country Frarstizk. The railway was originally built and established by a group of Zulvese men. To East Hiblundiiuns, work was especially important because food, water, and other daily needs were more expensive. The men built the railway to provide more jobs to unemployed people.

History

Hiblund Area

The Zulvese-Aizjhur Railway was at first operated and used by the Hiblundiiuns. The railway was cheap and gained popularity. Many more people were hired by the railway which allowed it to expand further throughout the area.

Establishment

1914 Accident

Frarstizk Era

Establishment of the Z.A.R. Museum

Routes

Preserved Lines

Stations

Locomotives

==Links