Sistine-class aircraft carrier: Difference between revisions
No edit summary |
No edit summary |
||
(18 intermediate revisions by the same user not shown) | |||
Line 6: | Line 6: | ||
{{Infobox ship class overview | {{Infobox ship class overview | ||
|Name= | |Name= | ||
|Builders= | |Builders= Marchetti Shipyards Alexandria, {{Flag|Meridon}} | ||
|Operators= {{flag|Meridonian Navy}} | |Operators= {{flag|Meridonian Navy}} | ||
|Class before= | |Class before= {{wpl|USS Enterprise (CVN-65)|''Atlantia''-class}} | ||
|Class after= | |Class after= | ||
|Subclasses= | |Subclasses= | ||
Line 16: | Line 16: | ||
|In commission range= | |In commission range= | ||
|Total ships building= | |Total ships building= | ||
|Total ships planned= | |Total ships planned= | ||
|Total ships completed= | |Total ships completed= 11 | ||
|Total ships cancelled= | |Total ships cancelled= | ||
|Total ships active= | |Total ships active= 11 | ||
|Total ships laid up= | |Total ships laid up= | ||
|Total ships lost= | |Total ships lost= | ||
Line 31: | Line 31: | ||
|Ship type= | |Ship type= | ||
|Ship tonnage= | |Ship tonnage= | ||
|Ship displacement= | |Ship displacement= 110,000 tons, full load | ||
|Ship tons burthen= | |Ship tons burthen= | ||
|Ship length= Overall: 330 meters | |Ship length= Overall: 330 meters | ||
Line 70: | Line 70: | ||
* Nixie decoys | * Nixie decoys | ||
|Ship armament= | |Ship armament= | ||
4x M21 | 4x M21 [[Common Air Defense System|CADS]] Launching Mounts, 8x CADS-S missiles each | ||
x3 | x3 Goalkeeper Mark 40 25mm CIWS<br> | ||
''Kohaku'' subclass: <br> | ''Kohaku'' subclass: <br> | ||
4x 16-cell [[ANVIL Vertical Launching System#Variants|Type 1 VLS]], with capacity for: | |||
-CADS | -[[Common Air Defense System|CADS-S]] | ||
-MSU-14 antisubmarine rocket-propelled torpedo | -MSU-14 antisubmarine rocket-propelled torpedo | ||
3x | 3x Goalkeeper 40 25mm CIWS | ||
|Ship armour= Kevlar over vital spaces | |Ship armour= Kevlar over vital spaces | ||
|Ship armor= | |Ship armor= | ||
|Ship aircraft= | |Ship aircraft= 90 fixed wing and helicopter | ||
|Ship aircraft facilities= |Ship notes= | |Ship aircraft facilities= |Ship notes= | ||
Line 85: | Line 85: | ||
|} | |} | ||
The '''Sistine-class''' is a class of {{wpl|Nuclear propulsion|nuclear powered}} {{wpl|Aircraft carrier|aircraft carriers}} in service with the [[Meridonian Navy]]. The ships are named after large Meridonian cities, and are the largest warships ever built for the Meridonian navy. They succeeded the {{wpl|Forrestal-class aircraft carrier|Atlantia-class}} of aircraft carriers. They were built starting in late 1990, and the first ship. ''Sistine'', was commissioned in 1996, with the final ship of the class, '' | The '''Sistine-class''' is a class of {{wpl|Nuclear propulsion|nuclear powered}} {{wpl|Aircraft carrier|aircraft carriers}} in service with the [[Meridonian Navy]]. The ships are named after large Meridonian cities, and are the largest warships ever built for the Meridonian navy. They succeeded the {{wpl|Forrestal-class aircraft carrier|Atlantia-class}} of aircraft carriers. They were built starting in late 1990, and the first ship. ''Sistine'', was commissioned in 1996, with the final ship of the class, ''Saratosa'', set to commision in mid 2024. | ||
Replacements for the aging ''Atlantia''-class carriers had been planned since at least the early 1980s, but were delayed a multitude of time due to a mixture of budget constraints and emerging design requirements- most notably the integration of the new [[Common Air Defense Missile]] system, which was replacing a medley of other air defense missile systems across the Navy by the early 2000s. The Liberal government of | Replacements for the aging ''Atlantia''-class carriers had been planned since at least the early 1980s, but were delayed a multitude of time due to a mixture of budget constraints and emerging design requirements- most notably the integration of the new [[Common Air Defense Missile]] system, which was replacing a medley of other air defense missile systems across the Navy by the early 2000s. The Liberal government of 1984 was planning on cancelling the project and replacing the carriers instead with large missile cruisers as the centerpiece capital ship of the Navy, which were seen as cheaper and an effective way to limit long-term military expenditures. This caused an uproar in both Navy command and public opinion when said plans were made public. When five senior admirals and half of the Chiefs of Defense Staff tendered their resignations over the issue and more conservative members of the coalition began to vacate it, the subsequent 1985 election saw the liberal government ousted and replaced by a Federal Party coalition, which immediately reinstated the general officers and the Sistine-class project. | ||
Designed based on lessons learned with the Atlantia-class, the ''Sistine''-class carriers feature a number of new improvements. Most notable of these is an innovative two-island design, originally made to accommodate a separation of funnels when the ship was intended as a non-nuclear carrier, but ported over to the nuclear design due to their improvements in deck space usage, redundancy of systems and command, and operational efficiency. It features a state-of-the-art Broadlight air search radar developed for the [[Helena-class destroyer]]s, capable of tracking hundreds of targets in real time. It is the first Meridonian capital ship to be nuclear-powered, and features improved facilities for aircraft and munitions handling. Carriers from ''Kohaku'' onwards have the M21 CAD/S launching mounts replaced with | Designed based on lessons learned with the Atlantia-class, the ''Sistine''-class carriers feature a number of new improvements. Most notable of these is an innovative two-island design, originally made to accommodate a separation of funnels when the ship was intended as a non-nuclear carrier, but ported over to the nuclear design due to their improvements in deck space usage, redundancy of systems and command, and operational efficiency. It features a state-of-the-art Broadlight air search radar developed for the [[Helena-class destroyer]]s, capable of tracking hundreds of targets in real time. It is the first Meridonian capital ship designed from the outset to be nuclear-powered, and features improved facilities for aircraft and munitions handling. Carriers from ''Kohaku'' onwards have the M21 CAD/S launching mounts replaced with 16-cell VLS tubes/The VLS tubes do allow for the integration of standoff anti-submarine rockets and theoretically allow for the integration of ship-based cruise and anti-ship missiles, however the integration of non-defensive ship-based weaponry aboard the ''Sistine''-class carriers has been rejected by the Navy. The ''Sistine''-class is expected to serve until the 2050s at the earliest. | ||
==Description== | ==Description== | ||
===Design=== | ===Design=== | ||
[[File:Kohaku_subclass.png|360px|thumb|right|MRS ''Kohaku'', the first of the ''Kohaku''-subclass, which primarily features the integration of 4 | [[File:Kohaku_subclass.png|360px|thumb|right|MRS ''Kohaku'', the first of the ''Kohaku''-subclass, which primarily features the integration of 4 16-cell VLS systems in place of the CADS launcher mounts.]] | ||
The design of the ''Sistine''-class carriers, due to a number of shifting requirements during its development, took a period of nearly ten years from conceptualization to construction. Key to its requirements from the design was the capability to meet or exceed the airwing size carried by the Atlantia-class, have a higher top speed, be capable of landing and launching aircraft simultaneously, and modularity to accomodate emerging technologies and aircraft. Sistine was originally designed to feature integrated electronics propulsion, but the design was altered to operate off of nuclear propulsion. | The design of the ''Sistine''-class carriers, due to a number of shifting requirements during its development, took a period of nearly ten years from conceptualization to construction. Key to its requirements from the design was the capability to meet or exceed the airwing size carried by the Atlantia-class, have a higher top speed, be capable of landing and launching aircraft simultaneously, and modularity to accomodate emerging technologies and aircraft. Sistine was originally designed to feature integrated electronics propulsion, but the design was altered to operate off of nuclear propulsion. | ||
Line 109: | Line 109: | ||
* 2 squadrons of {{wpl|Boeing F/A-18E/F Super Hornet|F6M2 Wasp}} fighters (24 aircraft) | * 2 squadrons of {{wpl|Boeing F/A-18E/F Super Hornet|F6M2 Wasp}} fighters (24 aircraft) | ||
* 1 squadron of {{wpl|Boeing EA-18G Growler|E6M2 Backwave}} electronics warfare aircraft (8 aircraft) | * 1 squadron of {{wpl|Boeing EA-18G Growler|E6M2 Backwave}} electronics warfare aircraft (8 aircraft) | ||
* 1 detachment of | * 1 detachment of [[Carrier Common Support Aircraft|S2M Siren]] airborne early warning aircraft (5 aircraft) | ||
* 1 squadron of {{wpl|Sikorsky_SH-60_Seahawk|H50M5 Seahawk}} antisubmarine patrol helicopters (10-12 aircraft) | * 1 squadron of {{wpl|Sikorsky_SH-60_Seahawk|H50M5 Seahawk}} antisubmarine patrol helicopters (10-12 aircraft) | ||
* 1 squadron of | * 1 squadron of [[Carrier Common Support Aircraft|C2M Triton]] multirole aircraft (10-12 aircraft) | ||
* 1-3 | * 1-3 [[Carrier Common Support Aircraft|C2M Triton]] or 1-4 {{wpl|Boeing V-22 Osprey|C22M Adjutant}} transient carrier onboard delivery aircraft | ||
===Flight deck and aircraft facilities=== | ===Flight deck and aircraft facilities=== | ||
Line 123: | Line 123: | ||
*''Marin Bay''- Green and white. | *''Marin Bay''- Green and white. | ||
*''Baymark''- Black and white. | *''Baymark''- Black and white. | ||
*''Cordelia''- Purple and white. | |||
*''Kaharoa''- Brown and white. | |||
*''Marina''- Red and gold. | |||
*''Enterprise''- White and silver. | |||
*''Saratosa''- Gold and black. | |||
*''Howland''-Orange and white. | |||
While ''Sistine'' and ''Kohina'' are armed with M21 CAD/S launcher mounts, carriers from ''Kohaku'' onwards are equipped with eight 8-cell VLS tubes in their places. This allows for the carrying of anti-submarine rocket torpedoes in addition to the standard complement of short range CAD/S missiles. | |||
==Ships in class== | ==Ships in class== | ||
Line 175: | Line 183: | ||
| 13 March 2016 | | 13 March 2016 | ||
| 2 February 2017 | | 2 February 2017 | ||
|- | |||
| [[MRS Marina|''Marina'']] | |||
| R17 | |||
| 2 May 2012 | |||
| 11 June 2018 | |||
| 2 March 2019 | |||
|- | |||
| [[MRS Enterprise (R18)|''Enterprise'']] | |||
| R18 | |||
| 2 May 2014 | |||
| 13 June 2016 | |||
| 2 March 2021 | |||
|- | |||
| [[MRS Saratosa (R19)|''Saratosa'']] | |||
| R19 | |||
| 2 May 2014 | |||
| 14 August 2016 | |||
| 5 April 2021 | |||
|- | |||
| [[MRS Howland (R20)|''Howland'']] | |||
| R20 | |||
| 4 September 2018 | |||
| 3 July 2022 | |||
| 1 April 2024 | |||
|- | |- | ||
|} | |} |
Latest revision as of 21:44, 8 May 2024
Sistine, as in her 2006 deployment.
| |
Class overview | |
---|---|
Builders: | Marchetti Shipyards Alexandria, Meridon |
Operators: | Meridonian Navy |
Preceded by: | Atlantia-class |
Cost: | Classified |
Built: | 1990-2012 |
In service: | 1996-present |
Completed: | 11 |
Active: | 11 |
General characteristics | |
Class and type: | Aircraft carrier |
Displacement: | 110,000 tons, full load |
Length: | Overall: 330 meters |
Beam: | Overall: Around 74 meters |
Draught: | 11 meters |
Propulsion: |
list error: <br /> list (help) 2 × Central Electric RM-2 reactors 4 × steam turbines, four shafts, 270,000 shp |
Speed: | In excess of 30 knots |
Range: | Unlimited |
Complement: | Around 5,200 including embarked airwing. |
Sensors and processing systems: |
|
Electronic warfare & decoys: |
|
Armament: |
list error: <br /> list (help) |
Armour: | Kevlar over vital spaces |
Aircraft carried: | 90 fixed wing and helicopter |
The Sistine-class is a class of nuclear powered aircraft carriers in service with the Meridonian Navy. The ships are named after large Meridonian cities, and are the largest warships ever built for the Meridonian navy. They succeeded the Atlantia-class of aircraft carriers. They were built starting in late 1990, and the first ship. Sistine, was commissioned in 1996, with the final ship of the class, Saratosa, set to commision in mid 2024.
Replacements for the aging Atlantia-class carriers had been planned since at least the early 1980s, but were delayed a multitude of time due to a mixture of budget constraints and emerging design requirements- most notably the integration of the new Common Air Defense Missile system, which was replacing a medley of other air defense missile systems across the Navy by the early 2000s. The Liberal government of 1984 was planning on cancelling the project and replacing the carriers instead with large missile cruisers as the centerpiece capital ship of the Navy, which were seen as cheaper and an effective way to limit long-term military expenditures. This caused an uproar in both Navy command and public opinion when said plans were made public. When five senior admirals and half of the Chiefs of Defense Staff tendered their resignations over the issue and more conservative members of the coalition began to vacate it, the subsequent 1985 election saw the liberal government ousted and replaced by a Federal Party coalition, which immediately reinstated the general officers and the Sistine-class project.
Designed based on lessons learned with the Atlantia-class, the Sistine-class carriers feature a number of new improvements. Most notable of these is an innovative two-island design, originally made to accommodate a separation of funnels when the ship was intended as a non-nuclear carrier, but ported over to the nuclear design due to their improvements in deck space usage, redundancy of systems and command, and operational efficiency. It features a state-of-the-art Broadlight air search radar developed for the Helena-class destroyers, capable of tracking hundreds of targets in real time. It is the first Meridonian capital ship designed from the outset to be nuclear-powered, and features improved facilities for aircraft and munitions handling. Carriers from Kohaku onwards have the M21 CAD/S launching mounts replaced with 16-cell VLS tubes/The VLS tubes do allow for the integration of standoff anti-submarine rockets and theoretically allow for the integration of ship-based cruise and anti-ship missiles, however the integration of non-defensive ship-based weaponry aboard the Sistine-class carriers has been rejected by the Navy. The Sistine-class is expected to serve until the 2050s at the earliest.
Description
Design
The design of the Sistine-class carriers, due to a number of shifting requirements during its development, took a period of nearly ten years from conceptualization to construction. Key to its requirements from the design was the capability to meet or exceed the airwing size carried by the Atlantia-class, have a higher top speed, be capable of landing and launching aircraft simultaneously, and modularity to accomodate emerging technologies and aircraft. Sistine was originally designed to feature integrated electronics propulsion, but the design was altered to operate off of nuclear propulsion.
One of the most recognizable features of the Sistine-class is its dual-island configuration, which is primarily a holdover from the diesel-operated design. The forward island is responsible for ship operations, including navigation, defensive systems, radar operations, and other such functions, while the rear island conducts coordination of air operations, including launches, landings, air battle management, and airspace control. Both bridges are redundant and each bridge can conduct operations of both if one of the bridges is damaged.
Sistine is a CATOBAR carrier that features 4 steam catapults and 4 arresting wires on an angled flight deck.
Construction
Propulsion
Armament and protection
Carrier air wing
As of 2020, a normal air wing of a deployed Sistine-class consists of the following:
- 2 squadrons of F5M6/F5M7 Lynx fighters (24 aircraft)
- 2 squadrons of F6M2 Wasp fighters (24 aircraft)
- 1 squadron of E6M2 Backwave electronics warfare aircraft (8 aircraft)
- 1 detachment of S2M Siren airborne early warning aircraft (5 aircraft)
- 1 squadron of H50M5 Seahawk antisubmarine patrol helicopters (10-12 aircraft)
- 1 squadron of C2M Triton multirole aircraft (10-12 aircraft)
- 1-3 C2M Triton or 1-4 C22M Adjutant transient carrier onboard delivery aircraft
Flight deck and aircraft facilities
Strike groups
Design differences within the class
All Sistine-class aircraft carriers are distinctly identified with the colored stripes at the rounddown, or the rearmost edge of the flight deck. This is a tradition carried over from carriers in the 1940s to assist aircraft in landing on the correct aircraft carrier, and to allow for a system of visual identification in the air.
- Sistine- Red and white.
- Kohina- Gold and white.
- Kohaku- Blue and white.
- Marin Bay- Green and white.
- Baymark- Black and white.
- Cordelia- Purple and white.
- Kaharoa- Brown and white.
- Marina- Red and gold.
- Enterprise- White and silver.
- Saratosa- Gold and black.
- Howland-Orange and white.
While Sistine and Kohina are armed with M21 CAD/S launcher mounts, carriers from Kohaku onwards are equipped with eight 8-cell VLS tubes in their places. This allows for the carrying of anti-submarine rocket torpedoes in addition to the standard complement of short range CAD/S missiles.
Ships in class
Ship | Pennant number | Laid down | Launched | Commissioned |
---|---|---|---|---|
Sistine | R10 | 2 December 1990 | 3 March 1996 | 1 December 1996 |
Kohina | R11 | 11 April 1993 | 2 March 1998 | 1 March 1999 |
Kohaku | R12 | 24 May 1996 | 12 August 2002 | 18 September 2003 |
Marin Bay | R13 | 22 June 2002 | 4 October 2008 | 9 July 2009 |
Baymark | R14 | 11 August 2005 | 2 December 2011 | 5 November 2012 |
Cordelia | R15 | 1 January 2007 | 5 August 2013 | 12 November 2013 |
Kaharoa | R16 | 2 May 2009 | 13 March 2016 | 2 February 2017 |
Marina | R17 | 2 May 2012 | 11 June 2018 | 2 March 2019 |
Enterprise | R18 | 2 May 2014 | 13 June 2016 | 2 March 2021 |
Saratosa | R19 | 2 May 2014 | 14 August 2016 | 5 April 2021 |
Howland | R20 | 4 September 2018 | 3 July 2022 | 1 April 2024 |