Landfall Stadium
Jump to navigation
Jump to search
Location | Providence, Northern Isle, Zamastan |
---|---|
Type | Multi-use stadium |
Executive suites | 108 |
Capacity | 67,000 |
Surface | Grass |
Construction | |
Broke ground | November 18, 2019 |
Opened | July 12, 2022 |
Construction cost | ℤ2.3 billion |
Tenants | |
Raptors (ZSL), Sea Wolves (ZFL) |
Landfall Stadium, is a multi-purpose stadium in Providence, Northern Isle. Its tenants include the Raptors (ZSL) and the Sea Wolves (ZFL). Opened in 2022 and built at a cost of ℤ2.3 billion, it is one of the most expensive stadiums in the world. Landfall Stadium is a ten-level domed stadium featuring an ETFE roof, silver and black exterior with light-up strips, a 275-foot (84 m) media mesh video screen facing the Coastal Valley highway, and large retractable curtain-like side windows facing downtown Providence. The north endzone area in front of the retractable windows contains a large 85-foot (26 m) torch that houses a flame in honor of Anty Butuna, the late quarterback of the Sea Wolves.