Zulvese-Aizjhur Railway: Difference between revisions

Jump to navigation Jump to search
No edit summary
No edit summary
Line 25: Line 25:
| planopen        =  
| planopen        =  
| open            =  
| open            =  
| open            = {{plainlist|
*1992 (HGZ Ost<br>[[Mascylla]], [[Finstria]], [[Krumlau]], [[Dulebia]])
*1998 (HGZ Zentral<br>[[Mascylla]], [[Krumlau]], [[Dulebia]])
*2007 (HGZ West<br>[[Juznia]])
*2015 (HGZ West<br>[[Hytekia]])
}}
}}
| event1label      =  
| event1label      =  
Line 65: Line 70:
| map_state        = collapsed
| map_state        = collapsed
| embedded        =  
| embedded        =  
}}
}}
}}

Revision as of 22:39, 25 May 2022

Zulvese-Aizjhur Railway
Screenshot 2022-05-25 5.25.35 PM.png
Overview
Native nameZulvese-Aizjhur Treindurrvach
StatusOperational
LocaleFrarstizk
TerminiAizjhur, Screenshot 2022-05-06 7.20.51 PM.png Frarstizk
Aizjhur, Strodedyk, Yeiskopp, Yel Zekk, Yenverlaaɣ, Frarstizk
Stations50
Daily ridershipAbout 1,000,000
Operation
Opened
OwnerIndividual governments and various companies
Technical
Line length3,178 km (1,975 mi)
Track length7,651 km (4,754 mi)
Number of tracksDouble track
Operating speed
  • 315 km/h (196 mph)
Route map
HGZ Map.png

}}