This article belongs to the lore of Anteria.

List of Railway Transportation Networks in Anteria: Difference between revisions

Jump to navigation Jump to search
No edit summary
Line 1: Line 1:
    
    
=Overview=
==Railway Networks==
{| style="width:100%;" class="wikitable sortable"
{| style="width:100%;" class="wikitable sortable"
|-
|-
Line 14: Line 14:
!style="width:20%;"| Ownership
!style="width:20%;"| Ownership
|- valign="center"
|- valign="center"
|rowspan="2"|{{Flag|Gassasinia}}
|Gassasinian Railways Network
|Gassasinian Railways Network
|Standard (1500mm)
|Standard (1500mm)
|25 KV AC Catenary <br> <small>750 V DC Third Rail (Commuter Railways)</small>
|25 KV AC Catenary <br> <small>1500 V DC Third Rail (Commuter Railways)</small>
|75%
|87.9%
|6,206
|6,206
|
|
Line 25: Line 24:
|Mini Railways
|Mini Railways
|Narrow (1000mm)
|Narrow (1000mm)
|25 KV AC Catenary <br> 750 V DC Third Rail
|20 KV AC Catenary <br> 1500 V AC Third Rail
|66%
|81%
|1,095
|1,095
|
|
Line 39: Line 38:
|
|
|Passenger Railways Public <br> Freight Services Private
|Passenger Railways Public <br> Freight Services Private
|-
|{{Flag|Speke}}
|SPK Group
|Neuew Gauge (1392mm)
|25 KV AC Catenary <br> 1500 V DC Catenary
|65%
|18,114
|28
|State-owned
|}
|}



Revision as of 20:45, 25 February 2023

Railway Networks

Country Railway System
Name Railway Gauge Electrification System(s) % Electrified Length (km) Area (Km2) per route km Ownership
Gassasinian Railways Network Standard (1500mm) 25 KV AC Catenary
1500 V DC Third Rail (Commuter Railways)
87.9% 6,206 State-owned (Gassasinian Railways Infrastructure Authority)
along with open-access private operators
Mini Railways Narrow (1000mm) 20 KV AC Catenary
1500 V AC Third Rail
81% 1,095 Privately Owned
 Neuewland Neuew Rail Committee Neuew Gauge (1392mm) 25 KV AC Catenary
1500 V DC Catenary
55% 12,580 Passenger Railways Public
Freight Services Private
 Speke SPK Group Neuew Gauge (1392mm) 25 KV AC Catenary
1500 V DC Catenary
65% 18,114 28 State-owned

High Speed Rail

This table is for high-speed railways. Many define high-speed railways as railways accomodating speeds of at least 250 kilometres per hour, or older track that have been upgraded to accomodate speeds of at least 20 kilometres per hour. For this table we will be defining high speed rail as any railway accommodating speed of at least 200 kilometres per hour.

Country Railway System
Name Railway Gauge Electrification System(s) % Electrified Length (km) Under Construction (km) Maximum Speed (km/h) Area (Km2) per route km Ownership
 Gassasinia Upgraded Main Lines Standard (1500mm) 25 KV AC Catenary 100% 984 ? 220 State-owned (Gassasinian Railways Infrastructure)
High Speed Corridors Standard (1500mm) 25 KV AC Catenary 100% 726 ? 320
High Speed Maglev Railway ZHI HSM guideway 35 KV AC Induction 100% 45 (Test track at Bekouri) 355 550
 Kentalis Линије Велике Брзине
High-Speed Lines
Standard (1500mm) 25 KV AC Catenary 100% 3,550 450 300-400
Track Speed
State-owned
(Zhelestruktura VAA, state-owned company for the maintenance of the railways.)
 Neuewland Myslalan High Speed Corridor Neuew Gauge (1392mm) 25 KV AC Catenary 100% 2,140 470 290 State-Owned
(Myslalan ME, consortium formed to maintain the Myslalan HSR Corridor)

See also