This article belongs to the lore of Anteria.

List of Railway Transportation Networks in Anteria: Difference between revisions

Jump to navigation Jump to search
Line 114: Line 114:
|100%
|100%
|984
|984
|
|220
|76.34
|76.34
|220
|
|rowspan="3"|State-owned <small>(Gassasinian Railways Infrastructure)</small>
|rowspan="3"|State-owned <small>(Gassasinian Railways Infrastructure)</small>
|-
|-
Line 124: Line 124:
|100%
|100%
|726
|726
|?
|
|320
|320
|
|104.85
|-
|-
|High Speed Maglev Railway
|High Speed Maglev Railway

Revision as of 16:09, 26 February 2023

Railway Networks

Country Railway System
Name Railway Gauge Electrification System(s) % Electrified Length (km) Area (Km2) per route km Ownership
 Gassasinia Gassasinian Rail Network (Total) 86.87% 7,301 10.29
Gassasinian Railways Network Standard (1500mm) 25 KV AC Catenary
1500 V DC Third Rail (Commuter Railways)
87.9% 6,206 12.10 State-owned (Gassasinian Railways Infrastructure Authority)
along with open-access private operators
Mini Railways Narrow (1000mm) 20 KV AC Catenary
1500 V AC Third Rail
81% 1,095 68.6 Privately Owned
 Riamo United Trenchways Standard (1500mm) 25 KV AC Catenary
1500 V DC Third Rail
72.12% 80,130 10.03 Partially state-owned (UT is a partially-public company)
 Neuewland Neuew Rail Committee Neuew Gauge (1392mm) 25 KV AC Catenary
1500 V DC Catenary
55% 12,580 Passenger Railways Public
Freight Services Private
 Speke SPK Group Standard (1500m) 25 KV AC Catenary 65% 18,114 28 State-owned
EkharnianFlag.png Ekharnia Ekharnian Rail Network (Total) 75.19% 19,806.24 47.56 State-owned Ekharnian Federal Railways
Federal Routes Standard (1500mm) 25 KV AC Catenary 100% 6734.12 139.9
Rural Routes Narrow (1000mm) 20 KV AC Catenary 62.4% 13,072.12 72.06

High Speed Rail

This table is for high-speed railways. Many define high-speed railways as railways accomodating speeds of at least 250 kilometres per hour, or older track that have been upgraded to accomodate speeds of at least 20 kilometres per hour. For this table we will be defining high speed rail as any railway accommodating speed of at least 200 kilometres per hour.

Country Railway System
Name Railway Gauge Electrification System(s) % Electrified Length (km) Under Construction (km) Maximum Speed (km/h) Area (Km2) per route km Ownership
 Gassasinia Upgraded Main Lines Standard (1500mm) 25 KV AC Catenary 100% 984 220 76.34 State-owned (Gassasinian Railways Infrastructure)
High Speed Corridors Standard (1500mm) 25 KV AC Catenary 100% 726 320 104.85
High Speed Maglev Railway ZHI HSM guideway 35 KV AC Induction 100% 45 (Test track at Bekouri) 355 550
 Kentalis Линије Велике Брзине
High-Speed Lines
Standard (1500mm) 25 KV AC Catenary 100% 3,550 450 300-400
Track Speed
State-owned
(Zhelestruktura VAA, state-owned company for the maintenance of the railways.)
 Neuewland Myslalan High Speed Corridor Neuew Gauge (1392mm) 25 KV AC Catenary 100% 2,140 470 290 State-Owned
(Myslalan ME, consortium formed to maintain the Myslalan HSR Corridor)

See also